EconPapers    
Economics at your fingertips  
 

Truthful Production Uncertainty in Electricity Markets: A Two-Stage Mechanism

Shobhit Singhal, Lesia Mitridati and Licio Romao

Papers from arXiv.org

Abstract: Renewable power sources have low marginal pro-duction costs, but may result in high balancing costs due to the inherent production uncertainty. Current day-ahead markets elicit only point production profiles and neglect the degree of uncertainty associated with each generating asset, preventing the market operator from accounting for balancing costs in day-ahead dispatch and ancillary service procurement. This increases total system costs and undermines market efficiency, especially in renewable-heavy power systems. To address this, we propose a new market clearing paradigm based on a two-stage mechanism, where producers report their production forecast distribution in the day-ahead stage, followed by the realized production in the real-time stage. By extending the Vickery-Clarke-Groves (VCG) payments to the two-stage setting, we show appealing properties in terms of incentive compatibility and individual rationality. An electricity market case study validates the theoretical claims, and illustrates the effectiveness of the proposed mechanism to reduce system costs.

Date: 2026-04
References: Add references at CitEc
Citations:

Downloads: (external link)
http://arxiv.org/pdf/2604.02455 Latest version (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:arx:papers:2604.02455

Access Statistics for this paper

More papers in Papers from arXiv.org
Bibliographic data for series maintained by arXiv administrators ().

 
Page updated 2026-04-06
Handle: RePEc:arx:papers:2604.02455