Eliminating Make-Whole Uplifts with a Minimum-Cost Uniform Price Adder
Valentina Norambuena-Guzman,
Cong Chen,
Lang Tong and
Timothy D. Mount
Papers from arXiv.org
Abstract:
Co-optimizing energy and flexible ramping reserves may dispatch generators at locational marginal prices (LMPs) below their submitted energy offer prices, necessitating out-of-market make-whole payments. Such payments create discriminatory settlements among generators and may incentivize strategic bidding for higher profits. This paper proposes LMP+U, an in-market uniform price adder to LMP for transmission-constrained networks, which minimizes demand payments subject to zero out-of-market make-whole uplift, preserves LMP-based congestion charges, and provides locally truthful bidding incentives for price-taking generators. We also identify conditions under which a price-taking generator can increase its profit by inflating its energy offer under conventional LMP with make-whole uplift. Numerical simulations illustrate the properties of LMP+U and its advantages over conventional LMP in congested networks.
Date: 2026-11
References: Add references at CitEc
Citations:
Downloads: (external link)
https://arxiv.org/pdf/2611.27757 Latest version (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:arx:papers:2611.27757
Access Statistics for this paper
More papers in Papers from arXiv.org
Bibliographic data for series maintained by arXiv administrators ().