EconPapers    
Economics at your fingertips  
 

Verteilungseffekte von Kapazitätsmechanismen: auf den Typ kommt es an

Claudia Kemfert and Thure Traber

DIW Wochenbericht, 2013, vol. 80, issue 48, 17-24

Abstract: In order to compensate for fluctuations in electricity demand as well as electricity supply from renewables, power plants are required that are reliably available, even in critical situations. Besides an ongoing discussion whether the liberalized electricity market is capable of stimulating sufficient investment, there are frequent calls for supporting instruments. Depending on their type, these instruments, also known as capacity mechanisms, have different effects on electricity producers and consumers. Model calculations prepared by DIW Berlin demonstrate that the total burden for achieving a defined safety margin in 2020 in Germany is between 0.4 and 3.1 billion euros and that overall, it leads to considerable free-rider effects on the part of the established electricity producers. This burden is potentially offset by advantages from the reduction of the risk of blackouts, which are difficult to quantify. Für den Ausgleich von Schwankungen der Stromnachfrage und des Stromangebotes aus erneuerbaren Energien sind Kraftwerke nötig, die auch in kritischen Situationen sicher zur Verfügung stehen. Es wird diskutiert, ob der liberalisierte Strommarkt in der Lage ist, ausreichende Investitionen anzuregen. Vielfach werden unterstützende Instrumente gefordert. Diese auch als Kapazitätsmechanismen bezeichneten Instrumente haben je nach Typ unterschiedliche Wirkung auf Stromerzeuger und -verbraucher. Unsere Modellrechnungen zeigen, dass die Gesamtbelastungen zur Erreichung einer Reservemarge von fünf Prozent im Jahr 2020 in Deutschland zwischen 0,4 und 3,1 Milliarden Euro betragen und in Summe zu deutlichen Mitnahmeeffekten bei den etablierten Stromerzeugern führen. Dem gegenüber stehen die in dieser Untersuchung nicht quantifizierten Vorteile einer Reduktion des Risikos von Stromausfällen.

Keywords: electricity market; capacity mechanism; investment (search for similar items in EconPapers)
JEL-codes: C63 D47 D61 (search for similar items in EconPapers)
Date: 2013
References: Add references at CitEc
Citations:

Downloads: (external link)
https://www.diw.de/documents/publikationen/73/diw_01.c.432368.de/13-48-4.pdf (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:diw:diwwob:80-48-4

Access Statistics for this article

DIW Wochenbericht is currently edited by Tomaso Duso, Marcel Fratzscher, Peter Haan, Claudia Kemfert, Alexander Kritikos, Alexander Kriwoluzky, Stefan Liebig, Lukas Menkhoff, Karsten Neuhoff, Carsten Schröder, Katharina Wrohlich and Sabine Fiedler

More articles in DIW Wochenbericht from DIW Berlin, German Institute for Economic Research Contact information at EDIRC.
Bibliographic data for series maintained by Bibliothek ().

 
Page updated 2025-03-22
Handle: RePEc:diw:diwwob:80-48-4