Energy-efficiency improvements by joint operation of two DH systems using old condensing turbines

Vojin Grković

Energy, 1997, vol. 22, issue 11, 1099-1102

Abstract: The design concept and optimization procedure are presented. The total heat load for both systems at peak conditions is estimated to be 1,216 MJ/s in 2001. The thermal power plant consists of six steam-condensing units with a total electric capacity of 1650 MWe at the generator terminals. It will be converted for CHP operation and will supply heat to both systems. The energy-efficiency improvements are maximised with CHP and system optimization.

Date: 1997
References: View complete reference list from CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0360544297000339
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:energy:v:22:y:1997:i:11:p:1099-1102

DOI: 10.1016/S0360-5442(97)00033-9

Access Statistics for this article

Energy is currently edited by Henrik Lund and Mark J. Kaiser

More articles in Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:energy:v:22:y:1997:i:11:p:1099-1102