Performance monitoring results of the first grid-connected BIPV system in Colombia
A.J. Aristizábal and
G. Gordillo
Renewable Energy, 2008, vol. 33, issue 11, 2475-2484
Abstract:
This paper summarizes the operational performance results of the first grid-connected building integrated photovoltaic (BIPV) system installed in Colombia (in Bogotá, at 4°35′ latitude and 2.580m altitude) after two years of monitoring. The performance monitoring was carried out with a sophisticated monitoring system, designed and implemented by us using the virtual instrumentation concept. The following parameters were measured: DC and AC power, inverter and system conversion efficiency, energy generated by the PV array, AC energy produced by the BIPV system, parameters to analyze power quality (%THD, harmonic components, frequency, voltage, flickers, power factor, active power, apparent power and reactive power), solar radiation in the inclination plane of the panels and environment temperature.
Keywords: Building integrated PV systems; Power quality; PV performance; Virtual instrumentation (search for similar items in EconPapers)
Date: 2008
References: View complete reference list from CitEc
Citations: View citations in EconPapers (4)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0960148108000359
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:renene:v:33:y:2008:i:11:p:2475-2484
DOI: 10.1016/j.renene.2008.01.018
Access Statistics for this article
Renewable Energy is currently edited by Soteris A. Kalogirou and Paul Christodoulides
More articles in Renewable Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().