Key Assumptions in Calculating the Cost of Forecast Error. A commentary on Peter Catt’s article, Assessing the Cost of Forecast Error, in Issue 7 of Foresight
John Boylan
Foresight: The International Journal of Applied Forecasting, 2007, issue 8, 22-24
Abstract:
John’s key points are these. • Organizations should consider which service level measure aligns most closely to their corporate objectives. Cost of Forecast Error (CFE) calculations should be based on this measure. • Assessment of service level targets at higher levels of aggregation elevates an operational task to a strategic issue and facilitates consideration of external factors. • Alternative approaches which do not depend on Cost of Forecast Error estimates, such as tradeoff curves, should be considered. Copyright International Institute of Forecasters, 2007
Date: 2007
References: Add references at CitEc
Citations:
Downloads: (external link)
https://foresight.forecasters.org/shop/
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:for:ijafaa:y:2007:i:8:p:22-24
Access Statistics for this article
More articles in Foresight: The International Journal of Applied Forecasting from International Institute of Forecasters Contact information at EDIRC.
Bibliographic data for series maintained by Michael Gilliland ().