Application of BP Neural Network Model in Risk Evaluation of Railway Construction
Yang Changwei,
Li Zonghao,
Guo Xueyan,
Yu Wenying,
Jin Jing and
Zhu Liang
Complexity, 2019, vol. 2019, 1-12
Abstract:
Chinese railway construction project is an important part of the implementation of the “Belt and Road” strategy, and the risk evaluation of overseas railway construction is the primary link of the project. Firstly, this paper mainly analyzes the Asian and European countries along the railway construction project, establishes a railway construction project risk evaluation system, and synthesizes various risk factors. Secondly, it establishes two independent BP neural network models by using different training algorithms because of the different political, economic, and cultural elements between the two continents.
Date: 2019
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
http://downloads.hindawi.com/journals/8503/2019/2946158.pdf (application/pdf)
http://downloads.hindawi.com/journals/8503/2019/2946158.xml (text/xml)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hin:complx:2946158
DOI: 10.1155/2019/2946158
Access Statistics for this article
More articles in Complexity from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().