Dynamic Early Warning Method for Major Hazard Installation Systems in Chemical Industrial Park
Yaguang Kong,
Chenfeng Xie,
Song Zheng,
Peng Jiang,
Meng Guan and
Fang Wang
Complexity, 2019, vol. 2019, 1-18
Abstract:
The production and storage of major hazard installations (MHIs) bring potential risks to chemical industrial park (CIP). In the production system of MHIs, its dangerous degree is mainly determined by key parameters, and abnormal key parameters often lead to accidents. To predict the real-time risk values of MHIs and improve accident prevention ability of CIP, we need a method that can combine dynamic prediction and assessment. Quantitative risk assessment (QRA) is not capable of modelling risk variations during the operation of a process. Therefore, this paper adopts the data-driven approach. Inspired by visual qualitative analysis and quantitative analysis, a dynamic early warning method is proposed for MHIs. We can get the future trend of these key parameters by using strongly correlation variables to predict key parameters. Fuzzy evaluation analysis is performed on the risk levels of key parameters, and the dynamic evaluation index of these MHIs is obtained. This method can be applied to the dynamic evaluation of MHIs system in CIP. It can contribute to the safety of CIP in some aspects.
Date: 2019
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
http://downloads.hindawi.com/journals/8503/2019/6250483.pdf (application/pdf)
http://downloads.hindawi.com/journals/8503/2019/6250483.xml (text/xml)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hin:complx:6250483
DOI: 10.1155/2019/6250483
Access Statistics for this article
More articles in Complexity from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().