Risk Analysis Using Earned Value: An Engineering Project Management Study
Scheljert Denas
Additional contact information
Scheljert Denas: Tulane University, Belle Chasse, LA, USA
International Journal of Risk and Contingency Management (IJRCM), 2015, vol. 4, issue 3, 22-33
Abstract:
Control and feedback in complex and sensitive systems with different resources and properties in uncertainty conditions are one of the significant challenges for project managers. Therefore, in this paper an integrated model with quantitative and qualitative approach based on Earned value management and risk analysis methods proposed to decrease deviations in time and cost estimation at complete (EAC(t) & EAC). Using the proposed performance indexes based on risk scores obtained by non-parametric resampling technique, namely bootstrap, calculating more accurate estimations of final cost and duration at lower and upper band with various confidence levels will be possible. Finally, an illustrative case study presented demonstrating the proposed model can be efficiently applied through real case software projects.
Date: 2015
References: Add references at CitEc
Citations:
Downloads: (external link)
http://services.igi-global.com/resolvedoi/resolve. ... 018/IJRCM.2015070102 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:igg:jrcm00:v:4:y:2015:i:3:p:22-33
Access Statistics for this article
International Journal of Risk and Contingency Management (IJRCM) is currently edited by Narasimha Rao Vajjhala
More articles in International Journal of Risk and Contingency Management (IJRCM) from IGI Global
Bibliographic data for series maintained by Journal Editor ().