Optimal Management of a Research and Development Project
Robert Lucas
Management Science, 1971, vol. 17, issue 11, 679-697
Abstract:
This paper offers a series of models designed to aid in the evaluation and control of an individual research and development project. The project under consideration is assumed to involve costs incurred over a period [0, T] and a return earned at T (or discounted to T) when the project is completed. In two of the models discussed below, the completion time T is regarded as known; in two others, T is taken to be a random variable with a known distribution. In two models, the costs per unit of time of operating the project are assumed to be fixed; in the other two, costs are variable, with increased expenditure resulting in a decreased completion time. Each of the four possible combinations of assumptions is treated in a separate section. The last section contains a summary and discussion of results.
Date: 1971
References: Add references at CitEc
Citations: View citations in EconPapers (20)
Downloads: (external link)
http://dx.doi.org/10.1287/mnsc.17.11.679 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:ormnsc:v:17:y:1971:i:11:p:679-697
Access Statistics for this article
More articles in Management Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().