R&D Project Planning with Q-GERT Network Modeling and Simulation

Bernard W. Taylor, III and Laurence J. Moore
Additional contact information
Bernard W. Taylor, III: Virginia Polytechnic Institute and State University
Laurence J. Moore: Virginia Polytechnic Institute and State University

Management Science, 1980, vol. 26, issue 1, 44-59

Abstract: This paper describes a simulation study of two cases of research and development planning. The first case is for a series of R&D projects analyzed sequentially by a single R&D team, while the second case is for a series of R&D projects analyzed sequentially and concurrently by two teams. Q-GERT, a network technique, was employed for the modeling and simulation effort. This technique includes numerous network modeling capabilities which make it more applicable to R&D project planning than traditional network techniques such as CPM and PERT. The simulation results for each case in terms of project duration statistics and outcome probabilities are presented in detail. The trade-offs between the two cases (i.e., single team versus multiple team analysis) are discussed.

Keywords: project management-GERT; research and development; simulation (search for similar items in EconPapers)
Date: 1980
References: Add references at CitEc
Citations: View citations in EconPapers (7)

Downloads: (external link)
http://dx.doi.org/10.1287/mnsc.26.1.44 (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:inm:ormnsc:v:26:y:1980:i:1:p:44-59

Access Statistics for this article

More articles in Management Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().

 
Page updated 2025-03-19
Handle: RePEc:inm:ormnsc:v:26:y:1980:i:1:p:44-59