EconPapers    
Economics at your fingertips  
 

On a Problem of Production Scheduling

George T. Bishop
Additional contact information
George T. Bishop: Rogers High School, Newport, Rhode Island

Operations Research, 1957, vol. 5, issue 1, 97-103

Abstract: In a recent paper, Bowmar showed that the problem of balancing costs of overtime production and inventory storage to minimize the total cost of meeting given sales requirements can be set up as a transportation problem. Accordingly, he suggested the use of the Stepping Stone Method of Charnes and Cooper for the solution of this problem. The present paper discusses features of the cost matrix that lead to a simplified method of solution.

Date: 1957
References: Add references at CitEc
Citations:

Downloads: (external link)
http://dx.doi.org/10.1287/opre.5.1.97 (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:inm:oropre:v:5:y:1957:i:1:p:97-103

Access Statistics for this article

More articles in Operations Research from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().

 
Page updated 2025-03-19
Handle: RePEc:inm:oropre:v:5:y:1957:i:1:p:97-103