The EVM Fundamentals
Mario Vanhoucke
Chapter Chapter 1 in Measuring Time, 2009, pp 1-24 from Springer
Abstract:
Abstract Earned Value Management (EVM) is a methodology used since the 1960s, when the USA department of defense proposed a standard method to measure a project’s performance. The system relies on a set of often straightforward metrics to measure and evaluate the general health of a project. These metrics serve as early warning signals to timely detect project problems or to exploit project opportunities.The purpose of an EVM system is to provide answers to project managers on questions such as: What is the difference between budgeted and actual costs? What is the current project status? Ahead of schedule or schedule delay? Given the current project performance, what is the expected remaining time and cost of the project?
Keywords: Actual Cost; Forecast Method; Early Warning Signal; Project Network; Project Duration (search for similar items in EconPapers)
Date: 2009
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:isochp:978-1-4419-1014-1_1
Ordering information: This item can be ordered from
http://www.springer.com/9781441910141
DOI: 10.1007/978-1-4419-1014-1_1
Access Statistics for this chapter
More chapters in International Series in Operations Research & Management Science from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().