EconPapers    
Economics at your fingertips  
 

Assurance of Supply (AOS)

Gilad Issar and Liat Ramati Navon

Chapter 2 in Operational Excellence, 2016, pp 7-9 from Springer

Abstract: Abstract As a first priority, Assurance of Supply, is embedded in all activities of the operations. Every member of the operations team should know always the actual production pace versus its goal. Production pace should reflect out from operations reports and dashboards. In order to prevent supply stop, the production line constraint needs, by design, to have some over production capacity. Once production line stops, a task force needs to be activate. While solving production stops safe inventory will serve to ensure the supply.

Keywords: Assurance of supply; Theory of constraint; Weekly output; Production capacity; Inventory (search for similar items in EconPapers)
Date: 2016
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:mgmchp:978-3-319-20699-8_2

Ordering information: This item can be ordered from
http://www.springer.com/9783319206998

DOI: 10.1007/978-3-319-20699-8_2

Access Statistics for this chapter

More chapters in Management for Professionals from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-04-01
Handle: RePEc:spr:mgmchp:978-3-319-20699-8_2