EconPapers    
Economics at your fingertips  
 

Master Planning - Supply Network Planning

Hartmut Stadtler
Additional contact information
Hartmut Stadtler: University of Hamburg

Chapter Chapter 5 in Advanced Planning in Supply Chains, 2012, pp 109-148 from Springer

Abstract: Abstract There are a number of decisions which have to be made in the medium-term because these have to be prepared some weeks in advance (like an additional shift on Saturdays which has to be agreed to by worker’s representatives) or take some time to become e ective (like building up seasonal stocks). Another reason for placing decisions at the medium-term planning level (instead of short-term) is the scope of consequences. As an example consider a manufacturer with several production sites with similar capabilities. Decisions regarding the allocation of production quantities to sites and directives which site will serve which market will have consequences on the profitability of each site and should be made centrally. Note that short-term production planning and scheduling is often done decentrally.

Keywords: Supply Chain; Setup Time; Master Planning; Safety Stock; Mixed Integer Programming Model (search for similar items in EconPapers)
Date: 2012
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:mgmchp:978-3-642-24215-1_6

Ordering information: This item can be ordered from
http://www.springer.com/9783642242151

DOI: 10.1007/978-3-642-24215-1_6

Access Statistics for this chapter

More chapters in Management for Professionals from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-04-01
Handle: RePEc:spr:mgmchp:978-3-642-24215-1_6