EconPapers    
Economics at your fingertips  
 

A Heuristic Approach for the Multi-Project Scheduling Problem with Resource Transition Constraints

Markus Berg (), Tobias Fischer () and Sebastian Velten ()
Additional contact information
Markus Berg: proALPHA Business Solutions GmbH
Tobias Fischer: Fraunhofer Institute for Industrial Mathematics ITWM
Sebastian Velten: Fraunhofer Institute for Industrial Mathematics ITWM

A chapter in Operations Research Proceedings 2019, 2020, pp 575-581 from Springer

Abstract: Abstract A resource transition constraint models sequence dependent setup costs between activities on the same resource. In this work, we propose a heuristic for the multi-project scheduling problem with resource transition constraints, which relies on constraint programming and local search methods. The objective is to minimize the project delay, earliness and throughput time, while at the same time reducing setup costs. In computational results, we demonstrate the effectiveness of an implementation based on the presented concepts using instances from practice.

Keywords: Project scheduling; Transition constraints; Setup costs (search for similar items in EconPapers)
Date: 2020
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:oprchp:978-3-030-48439-2_70

Ordering information: This item can be ordered from
http://www.springer.com/9783030484392

DOI: 10.1007/978-3-030-48439-2_70

Access Statistics for this chapter

More chapters in Operations Research Proceedings from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-04-01
Handle: RePEc:spr:oprchp:978-3-030-48439-2_70