Risk Management Techniques for Quality Software Development
Toshihiko Fukushima and
Shigeru Yamada
Additional contact information
Toshihiko Fukushima: Nissin Systems Co.
Shigeru Yamada: Tottori University
Chapter 20 in Recent Advances in Reliability and Quality in Design, 2008, pp 407-420 from Springer
Abstract:
Abstract Due to the rapid growth of the IT community, users are demanding both very specific requirements and quick delivery time. Under this pressure, it is often difficult for project managers to meet these high expectations. Consequently, many of risks remain latent in almost all software development projects. The use of countermeasures after failures shows a certain degree of “management failure”. Therefore, we have to manage such risks at an early stage for projects to be successful.
Keywords: Risk Management; Multiple Linear Regression Analysis; Risk Mitigation; Software Development Project; Process Quality Assurance (search for similar items in EconPapers)
Date: 2008
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:ssrchp:978-1-84800-113-8_20
Ordering information: This item can be ordered from
http://www.springer.com/9781848001138
DOI: 10.1007/978-1-84800-113-8_20
Access Statistics for this chapter
More chapters in Springer Series in Reliability Engineering from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().