EconPapers    
Economics at your fingertips  
 

AMP Task Interval Management

David Lapesa Barrera ()
Additional contact information
David Lapesa Barrera: The Lean Airline

Chapter 11 in Aircraft Maintenance Programs, 2026, pp 177-189 from Springer

Abstract: Abstract This chapter introduces the procedures to determine and manage the Thresholds and Intervals at which an Aircraft Maintenance Program (AMP) task must be performed: Maintenance Clock Starting Point, Grace Periods (Compliance Time), Permitted Variations, Exceptional Short-term Extension, and Task Escalation.

Date: 2026
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:ssrchp:978-3-032-11556-0_11

Ordering information: This item can be ordered from
http://www.springer.com/9783032115560

DOI: 10.1007/978-3-032-11556-0_11

Access Statistics for this chapter

More chapters in Springer Series in Reliability Engineering from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2026-05-12
Handle: RePEc:spr:ssrchp:978-3-032-11556-0_11