AMP Evolution/Optimization
David Lapesa Barrera ()
Additional contact information
David Lapesa Barrera: The Lean Airline
Chapter 12 in Aircraft Maintenance Programs, 2026, pp 191-195 from Springer
Abstract:
Abstract Following the previous section on AMP Task Interval Management – Task Escalation, this chapter introduces the AMP Evolution/Optimization process. This process may be required when an operator needs a high level of expertise to analyze its in-service experience data for escalation purposes, or when a higher level of confidence is needed to undertake the escalation project.
Date: 2026
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:ssrchp:978-3-032-11556-0_12
Ordering information: This item can be ordered from
http://www.springer.com/9783032115560
DOI: 10.1007/978-3-032-11556-0_12
Access Statistics for this chapter
More chapters in Springer Series in Reliability Engineering from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().