Replacement Overtime and Middle Policies

Xufeng Zhao () and Toshio Nakagawa
Additional contact information
Xufeng Zhao: Nanjing University of Aeronautics and Astronautics
Toshio Nakagawa: Aichi Institute of Technology

Chapter Chapter 4 in Advanced Maintenance Policies for Shock and Damage Models, 2018, pp 71-96 from Springer

Abstract: Abstract Originally, replacement last was discussed to replace an operating unit without stopping successive working cycles by Zhao and Nakagawa (Eur J Oper Res 223:141–149, 2012, [7]); however, the approach of replacing over a planned measure, i.e., delaying replacement actions over the planned time T until the running works have been completed by Nakagawa (Advanced reliability models and maintenance policies. Springer, London, 2008, [30]), was provided as another choice to make replacement easier.

Date: 2018
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:ssrchp:978-3-319-70456-2_4

Ordering information: This item can be ordered from
http://www.springer.com/9783319704562

DOI: 10.1007/978-3-319-70456-2_4

Access Statistics for this chapter

More chapters in Springer Series in Reliability Engineering from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-04-01
Handle: RePEc:spr:ssrchp:978-3-319-70456-2_4