EconPapers    
Economics at your fingertips  
 

Multi-objective two-stage multiprocessor flow shop scheduling – a subgroup particle swarm optimisation approach

Rong-Hwa Huang, Chang-Lin Yang and Chun-Ting Hsu

International Journal of Systems Science, 2015, vol. 46, issue 16, 3010-3018

Abstract: Flow shop production system – compared to other economically important production systems – is popular in real manufacturing environments. This study focuses on the flow shop with multiprocessor scheduling problem (FSMP), and develops an improved particle swarm optimisation heuristic to solve it. Additionally, this study designs an integer programming model to perform effectiveness and robustness testing on the proposed heuristic. Experimental results demonstrate a 10% to 50% improvement in the effectiveness of the proposed heuristic in small-scale problem tests, and a 10% to 40% improvement in the robustness of the heuristic in large-scale problem tests, indicating extremely satisfactory performance.

Date: 2015
References: Add references at CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
http://hdl.handle.net/10.1080/00207721.2014.886742 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:taf:tsysxx:v:46:y:2015:i:16:p:3010-3018

Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/TSYS20

DOI: 10.1080/00207721.2014.886742

Access Statistics for this article

International Journal of Systems Science is currently edited by Visakan Kadirkamanathan

More articles in International Journal of Systems Science from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().

 
Page updated 2025-05-18
Handle: RePEc:taf:tsysxx:v:46:y:2015:i:16:p:3010-3018