Cycle time calculation of shuttle-lift-crane automated storage and retrieval system
Francesco Zammori,
Mattia Neroni and
Davide Mezzogori
IISE Transactions, 2021, vol. 54, issue 1, 40-59
Abstract:
This article deals with cycle time calculation of Automated Storage and Retrieval Systems (AS/RS). Cycle time has a high impact on the operating performance of an AS/RS, and its knowledge is essential, both at the operational and design level. The novelty of this work concerns the peculiar kind of system that is considered, as the focus is on the Shuttle-Lift-Crane AS/RS. This solution, common in the steel sector, is used to store bundles of long metal bars, which are automatically handled by cranes, lifts, and shuttles. The functioning of these machines, which can operate in parallel and independently, is stochastically modeled, and the probability distribution function of the cycle time is computed, both for single and dual command cycles. The model, assessed via discrete event simulation, ensures a high average accuracy of 96% and 98%, under single and dual command cycles, respectively.
Date: 2021
References: Add references at CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://hdl.handle.net/10.1080/24725854.2020.1861391 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:uiiexx:v:54:y:2021:i:1:p:40-59
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/uiie20
DOI: 10.1080/24725854.2020.1861391
Access Statistics for this article
IISE Transactions is currently edited by Jianjun Shi
More articles in IISE Transactions from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().