Shortcuts in Complex Engineering Systems: A Principal‐Agent Approach to Risk Management
Russ Garber and
Elisabeth Paté‐Cornell
Risk Analysis, 2012, vol. 32, issue 5, 836-854
Abstract:
In this article, we examine the effects of shortcuts in the development of engineered systems through a principal‐agent model. We find that occurrences of illicit shortcuts are closely related to the incentive structure and to the level of effort that the agent is willing to expend from the beginning of the project to remain on schedule. Using a probabilistic risk analysis to determine the risks of system failure from these shortcuts, we show how a principal can choose optimal settings (payments, penalties, and inspections) that can deter an agent from cutting corners and maximize the principal's value through increased agent effort. We analyze the problem for an agent with limited liability. We consider first the case where he is risk neutral; we then include the case where he is risk averse.
Date: 2012
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (4)
Downloads: (external link)
https://doi.org/10.1111/j.1539-6924.2011.01736.x
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wly:riskan:v:32:y:2012:i:5:p:836-854
Access Statistics for this article
More articles in Risk Analysis from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().