The Impact of Electricity Sector Restructuring on Coal-fired Power Plants in India
Kabir Malik, Maureen Cropper, Alexander Limonov and Anoop Singh
Authors registered in the RePEc Author Service: Maureen L. Cropper,
Anoop Singh and
Kabir Malik
The Energy Journal, 2015, vol. Volume 36, issue Number 4
Abstract:
We examine whether the unbundling of generation from transmission and distribution services at state-owned power plants in India improved operating efficiency at these power plants. Between 1995 and 2009, 85 percent of coal-based generation capacity owned by state governments was unbundled from vertically integrated State Electricity Boards into state generating companies. We find that generating units in states that unbundled before the Electricity Act of 2003 experienced reductions in forced outages of about 25% and improvements in availability of about 10%, with the largest results occurring 3-5 years after unbundling. We find no evidence of improvements in thermal efficiency at state-owned power plants due to unbundling.
JEL-codes: F0 (search for similar items in EconPapers)
Date: 2015
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (10)
Downloads: (external link)
http://www.iaee.org/en/publications/ejarticle.aspx?id=2654 (text/html)
Access to full text is restricted to IAEE members and subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:aen:journl:ej36-4-malik
Ordering information: This journal article can be ordered from
http://www.iaee.org/en/publications/ejsearch.aspx
Access Statistics for this article
More articles in The Energy Journal from International Association for Energy Economics Contact information at EDIRC.
Bibliographic data for series maintained by David Williams ().