Why Your IT Project Might Be Riskier Than You Think
Bent Flyvbjerg and
Alexander Budzier
Papers from arXiv.org
Abstract:
Out-of-control information technology (IT) projects have ended the careers of top managers, such as EADS CEO Noel Forgeard and Levi Strauss' CIO David Bergen. Moreover, IT projects have brought down whole companies, like Kmart in the US and Auto Windscreen in the UK. Software and other IT is now such an integral part of most business processes and products that CEOs must know their IT risks, which are typically substantial and overlooked. The analysis of a sample of 1,471 IT projects showed that the average cost overrun was 27% - but that figure masks a far more alarming 'fat tail' risk. Fully one in six of the projects in the sample was a Black Swan, with a cost overrun of 200%, on average, and a schedule overrun of almost 70%. This highlights the true pitfall of IT change initiatives: It's not that they're particularly prone to high cost overruns on average - it is that there are a disproportionate number of Black Swans. By focusing on averages instead of the more damaging outliers, most managers and consultants have been missing the real risk in doing IT. In conclusion, the article outlines ideas as to what can be done to avoid Black Swans.
Date: 2013-03, Revised 2013-04
New Economics Papers: this item is included in nep-ppm
References: Add references at CitEc
Citations: View citations in EconPapers (1)
Published in Harvard Business Review, Vol. 89 (2011), No. 9, pp. 23-25
Downloads: (external link)
http://arxiv.org/pdf/1304.0265 Latest version (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:arx:papers:1304.0265
Access Statistics for this paper
More papers in Papers from arXiv.org
Bibliographic data for series maintained by arXiv administrators ().