EconPapers    
Economics at your fingertips  
 

Task Scheduling and Moral Hazard

Patrick Schmitz and Tymofiy Mylovanov ()

No 6467, CEPR Discussion Papers from Centre for Economic Policy Research

Abstract: We study a two-period moral hazard problem with risk-neutral and wealth-constrained agents and three identical tasks. We show that the allocation of tasks over time is important if there is a capacity constraint on the number of tasks that can be performed in one period. We characterize the optimal schedule of tasks over time and the optimal assignment of tasks to agents conditional on the outcomes of previous tasks. In particular, we show that delaying tasks is optimal if and only if the effect of an agent's effort on the probability of success is relatively low.

Keywords: Hidden actions; Job design; Limited liability; Task assignment (search for similar items in EconPapers)
JEL-codes: D86 L23 M54 (search for similar items in EconPapers)
Date: 2007-09
New Economics Papers: this item is included in nep-bec
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)

Downloads: (external link)
https://cepr.org/publications/DP6467 (application/pdf)

Related works:
Journal Article: Task scheduling and moral hazard (2008) Downloads
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:cpr:ceprdp:6467

Ordering information: This working paper can be ordered from
https://cepr.org/publications/DP6467

Access Statistics for this paper

More papers in CEPR Discussion Papers from Centre for Economic Policy Research 33 Great Sutton Street, London EC1V 0DX, UK.
Bibliographic data for series maintained by CEPR ().

 
Page updated 2026-05-19
Handle: RePEc:cpr:ceprdp:6467