Task Scheduling and Moral Hazard
Patrick Schmitz and
Tymofiy Mylovanov ()
No 6467, CEPR Discussion Papers from C.E.P.R. Discussion Papers
Abstract:
We study a two-period moral hazard problem with risk-neutral and wealth-constrained agents and three identical tasks. We show that the allocation of tasks over time is important if there is a capacity constraint on the number of tasks that can be performed in one period. We characterize the optimal schedule of tasks over time and the optimal assignment of tasks to agents conditional on the outcomes of previous tasks. In particular, we show that delaying tasks is optimal if and only if the effect of an agent's effort on the probability of success is relatively low.
Keywords: Hidden actions; Job design; Limited liability; Task assignment (search for similar items in EconPapers)
JEL-codes: D86 L23 M54 (search for similar items in EconPapers)
Date: 2007-09
New Economics Papers: this item is included in nep-bec
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
https://cepr.org/publications/DP6467 (application/pdf)
CEPR Discussion Papers are free to download for our researchers, subscribers and members. If you fall into one of these categories but have trouble downloading our papers, please contact us at subscribers@cepr.org
Related works:
Journal Article: Task scheduling and moral hazard (2008) 
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:cpr:ceprdp:6467
Ordering information: This working paper can be ordered from
https://cepr.org/publications/DP6467
Access Statistics for this paper
More papers in CEPR Discussion Papers from C.E.P.R. Discussion Papers Centre for Economic Policy Research, 33 Great Sutton Street, London EC1V 0DX.
Bibliographic data for series maintained by ().