Lean Management and Pull as Part of the Marketing Strategy
Marc Helmold
Additional contact information
Marc Helmold: IU, International University of Applied Sciences
Chapter 20 in Performance Excellence in Marketing, Sales and Pricing, 2022, pp 209-219 from Springer
Abstract:
Abstract The Toyota Production System (TPS), the Just-in-Time Production System or Lean Production System can be described as the ideal combination of four principles (Imai, 1986). These principles are the zero defect principle, the pull principle, the tact principle and the flow principle as displayed in Fig. 20.1 (Helmold & Samara, 2019).
Date: 2022
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:mgmchp:978-3-031-10097-0_20
Ordering information: This item can be ordered from
http://www.springer.com/9783031100970
DOI: 10.1007/978-3-031-10097-0_20
Access Statistics for this chapter
More chapters in Management for Professionals from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().