Different Starting Points
Dominik Maximini
Chapter 7 in The Scrum Culture, 2015, pp 83-86 from Springer
Abstract:
Abstract There are several ways to start a Scrum introduction project. This depends considerably on the desired Scrum shape. In some companies, management decides—often after a relaxing and insightful golf duel—that Scrum is to be used throughout the whole company. Sometimes such a decision is the result of “lessons learned” of past projects. In both cases, management is backing the Scrum introduction and provides budget as well as other support.
Keywords: Scrum Introduction; Past Projects; Tactical Submarines; True Transparency; Trial Balloon (search for similar items in EconPapers)
Date: 2015
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:mgmchp:978-3-319-11827-7_7
Ordering information: This item can be ordered from
http://www.springer.com/9783319118277
DOI: 10.1007/978-3-319-11827-7_7
Access Statistics for this chapter
More chapters in Management for Professionals from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().