Naval Research Logistics (NRL)
1987 - 2021
From John Wiley & Sons Bibliographic data for series maintained by Wiley Content Delivery (). Access Statistics for this journal.
Is something missing from the series or not right? See the RePEc data check for the archive and series.
Volume 45, issue 8, 1998
- Automated air load planning pp. 751-768

- Kurt R. Heidelberg, Gregory S. Parnell and James E. Ames
- Iterative methods for dynamic stochastic shortest path problems pp. 769-789

- Raymond K. Cheung
- Solving a selected class of location problems by exploiting problem structure: A decomposition approach pp. 791-815

- Dilip Chhajed and Timothy J. Lowe
- Decomposition algorithms for the maximum‐weight connected graph problem pp. 817-837

- Heungsoon Felix Lee and Daniel R. Dooly
- A set‐processing algorithm for scheduling staff on 4‐day or 3‐day work weeks pp. 839-853

- Richard N. Burns, Rangarajan Narasimhan and L. Douglas Smith
Volume 45, issue 7, 1998
- Combat modeling of remotely targeted vehicles and a battery against a moving target pp. 645-667

- Chang S. Sung and Young H. Sohn
- Analysis of production lines with Coxian service times and no intermediate buffers pp. 669-685

- H. T. Papadopoulos
- Inventory management under random supply disruptions and partial backorders pp. 687-703

- Antonio Arreola‐Risa and Gregory A. DeCroix
- The open shop scheduling problem with a given sequence of jobs on one machine pp. 705-731

- Y.M. Shafransky and V.A. Strusevich
- A competitive genetic algorithm for resource‐constrained project scheduling pp. 733-750

- Sönke Hartmann
Volume 45, issue 6, 1998
- Class scheduling algorithms for Navy training schools pp. 533-551

- A. Apte, A. Jayasuriya, J. Kennington, I. Krass, R. Mohamed, S. Sorensen and J. Whitler
- Local search methods for the discrete time/resource trade‐off problem in project networks pp. 553-578

- Bert De Reyck, Erik Demeulemeester and Willy Herroelen
- Coordinated replenishments from multiple suppliers with price discounts pp. 579-598

- Siddhartha Syam and Bala Shetty
- A single‐period, multi‐echelon stochastic model under a mix of assemble to order and assemble in advance policies pp. 599-614

- Moncer Hariga
- Analysis of the greedy approach in problems of maximum k‐coverage pp. 615-627

- Dorit S. Hochbaum and Anu Pathria
- A nonparametric approach to accelerated life testing under multiple stresses pp. 629-644

- Karthik Devarajan and Nader Ebrahimi
Volume 45, issue 5, 1998
- Heuristics for multicomponent joint replacement: Applications to aircraft engine maintenance pp. 435-458

- Wallace J. Hopp and Yar‐Lin Kuo
- Efficient multinomial selection in simulation pp. 459-482

- J. O. Miller, Barry L. Nelson and Charles H. Reilly
- Optimal scheduling of reader—systems pp. 483-495

- K. D. Glazebrook, V. G. Kulkarni and L. C. Puryear
- Bolstering components for maximizing system lifetime pp. 497-509

- Jie Mi
- Scheduling deteriorating jobs to minimize makespan pp. 511-523

- Wieslaw Kubiak and Steef van de Velde
- Open shop scheduling to minimize the number of late jobs pp. 525-532

- Christos Koulamas and George J. Kyparisis
Volume 45, issue 4, 1998
- An optimal structured policy for maintenance of partially observable aircraft engine components pp. 335-352

- Wallace J. Hopp and Yar‐Lin Kuo
- Locating a target from directional data pp. 353-364

- Jingwen Li and Ser Aik Quek
- On lifetimes in random environments pp. 365-375

- Antonio Di Crescenzo and Franco Pellerey
- Volume discount decisions: Wealth maximization or EOQ approach? pp. 377-389

- Prafulla Joglekar and James M. Kelly
- Some properties and computational results for a general repair process pp. 391-405

- J. S. Dagpunar
- Interchange fees for bank ATM networks pp. 407-417

- S. H. Gow and L. C. Thomas
- The dynamic lot size model with quantity discount: Counterexamples and correction pp. 419-422

- Jiefeng Xu and Leonard L. Lu
- Note: The economic manufacturing lot‐sizing problem with imperfect production processes: Bounds and optimal solutions pp. 423-433

- M. Hariga and M. Ben‐Daya
Volume 45, issue 3, 1998
- Branch and bound methods for a search problem pp. 243-257

- Alan R. Washburn
- A continuous‐review inventory system with lost sales and variable lead time pp. 259-278

- Esmail Mohebbi and Morton J.M. Posner
- Solution algorithms for the parallel replacement problem under economy of scale pp. 279-295

- Zhi‐Long Chen
- Minimizing weighted mean absolute deviation of flow times in single machine systems pp. 297-311

- Y. P. Aneja, S. N. Kabadi and A. Nagar
- A new appointment rule for a single‐server, multiple‐customer service system pp. 313-326

- Kum Khiong Yang, Mun Ling Lau and Ser Aik Quek
- On the inspection game pp. 327-334

- Thomas S. Ferguson and Costis Melolidakis
Volume 45, issue 2, 1998
- A robust regression technique using compound estimation pp. 125-139

- James R. Simpson and Douglas C. Montgomery
- An exact algorithm for the batch sequencing problem in a two‐machine flow shop with limited buffer pp. 141-164

- A. Agnetis, F. Rossi and G. Gristina
- Optimal lot sizing and inspection policy for an EMQ model with imperfect inspections pp. 165-186

- Viliam Makis
- Optimal control policies for a periodic review inventory system with emergency orders pp. 187-204

- Chi Chiang and Genaro J. Gutierrez
- Some comparison results of system availability pp. 205-218

- Jie Mi
- Improved upper bounds for the reliability of d‐dimensional consecutive‐k‐out‐of‐n: F systems pp. 219-230

- Anant P. Godbole, Laura K. Potter and Jessica K. Sklar
- Minimizing total completion time in two‐processor task systems with prespecified processor allocations pp. 231-242

- Xiaoqiang Cai, Chung‐Yee Lee and Chung‐Lun Li
Volume 45, issue 1, 1998
- Attrition models of the Ardennes campaign pp. 1-22

- Ronald D. Fricker
- Matrix‐geometric solution of discrete time MAP/PH/1 priority queue pp. 23-50

- Attahiru Sule Alfa
- Openshop scheduling under linear resources constraints pp. 51-66

- I. Adiri and O. Hamberg
- Scheduling to minimize the total compression and late costs pp. 67-82

- T.C.E. Cheng, Zhi‐Long Chen, Chung‐Lun Li and B.M.‐T. Lin
- Pareto‐optimality in classical inventory problems pp. 83-98

- J. Puerto and F.R. Fernández
- Single machine sequencing with linear models of release dates pp. 99-113

- Adam Janiak
- Estimating reliability of components with increasing failure rate using series system data pp. 115-123

- Paul H. Kvam and Harshinder Singh
| |