Organization, Technology and Management in Construction
2016 - 2025
Current editor(s): Mladen Radujković From Sciendo Bibliographic data for series maintained by Peter Golla (). Access Statistics for this journal.
Is something missing from the series or not right? See the RePEc data check for the archive and series.
Volume 14, issue 1, 2022
- Linking life cycle BIM data to a facility management system using Revit Dynamo pp. 2539-2558

- Thabet Walid, Lucas Jason and Srinivasan Sai
- Effects of lagging projectification in the public sector on realizing infrastructure projects pp. 2559-2570

- Wagner Reinhard F. and Radujkovic Mladen
- Investigation of the poor-quality practices on building construction sites in Malaysia pp. 2583-2600

- Olanrewaju Abdul Lateef and Lee Alice Hui Jing
- Knowledge management by construction management template for sustainable entrepreneurship pp. 2601-2615

- Meneiluik Aleksandr and Nikiforov Aleksey
- A structured literature review on construction conflict prevention and resolution: A modified approach for engineering pp. 2616-2630

- Sabri Omar, Lædre Ola and Bruland Amund
- Parsimonious process model of energy retrofit of buildings pp. 2631-2639

- Turk Žiga, Ma Zhiliang and Klinc Robert
- Manageability of complex organisational systems – system-theoretical confines of control pp. 2640-2655

- Eber Wolfgang
- Multi-criteria decision-making approach for selecting a structural system of an industrial facility pp. 2656-2665

- Zumrut Irem Bayram, Baran Hamim Burak and Ozbalta Turkan Goksal
- A construction–specific extension to a standard project risk management process pp. 2666-2674

- Alfreahat Dina and Sebestyén Zoltán
- Total quality management practices and its impact on Indian construction projects pp. 2697-2709

- Vijayabanu C., Karthikeyan S. and Vijay Surya P.
- Capability improvement measures of the public sector for implementation of building information modeling in construction projects pp. 2710-2730

- Yusuf Anthony Olukayode, Opawole Akintayo, Musa Nofiu Abiodun, Kadiri Dele Samuel and Ebunoluwa Esther Ilori
- The reduction of vehicular traffic during the Zion Christian Church Easter weekend pilgrimage pp. 2731-2740

- Mathebula Andrew Mabila and Smallwood John
- Real-estate price prediction with deep neural network and principal component analysis pp. 2741-2759

- Mostofi Fatemeh, Toğan Vedat and Başağa Hasan Basri
- A DOSE to compare the level of performance between construction projects pp. 2760-2768

- Alemu Teshale Teshome and Thakur Mohindra Singh
Volume 13, issue 2, 2021
- Leadership skills, stakeholder management and execution of fibre-optic infrastructure: intervening influence of government policy pp. 2426-2437

- Akhwaba James
- Providing a framework for optimizing a mixing design of reactive powder concrete (RPC) pp. 2438-2449

- Moghaddam Farid Ghaffari, Akbarpour Abbas and Firouzi Afshin
- Network analysis of interconnections between theoretical concepts associated with principal–agent theory concerning construction projects pp. 2450-2464

- Ceric Anita and Ivic Ivona
- Added value of sites suitable for sustainable office development pp. 2465-2471

- Kupec Josef
- Construction health and safety: A topic landscape study pp. 2472-2483

- Cao Xiaorui, Lu Ruodan, Guo Liang and Liu Jianya
- Understanding the effects of BIM implementation in corporation finance: An empirical study in China pp. 2484-2495

- Wang Zhimin and Ma Jianjun
- Sleep duration and fatigue in construction workers: A preliminary study pp. 2496-2504

- Ferrada Ximena, Barrios Silvia, Masalan Patricia, Campos-Romero Solange, Carrillo Juan and Molina Yerko
- A new framework for ranking Critical Success Factors for International Construction Projects pp. 2505-2520

- Butković Lana Lovrenčić
- Determination of construction process duration based on labor productivity estimation: A case study pp. 2521-2538

- Kubečková Darja and Smugala Stanislav
Volume 13, issue 1, 2021
- Method for Base Estimation of Construction Time for Linear Projects in Front-end Project Phases pp. 2312-2326

- Dunovic Ivana Burcar, Prebanic Kristijan Robert and Durrigl Pavao
- A study of project managers’ choice on key methods, tools and techniques in managing engineering projects pp. 2327-2340

- Radujković Mladen and Klepo Mariela Sjekavica
- Estimation of the excavator actual productivity at the construction site using video analysis pp. 2341-2352

- Šopić Martina, Vukomanović Mladen, Car-Pušić Diana and Završki Ivica
- On-site factories to support lean principles and industrialized construction pp. 2353-2366

- Rosarius Anton and García de Soto Borja
- Assessing the role and significance of project selection by the contractors in the Saudi construction industry pp. 2367-2373

- Bageis Abdulrahman and Alsulamy Saleh
- Drivers of cost and time overruns: A client and contractor perspective pp. 2374-2382

- Dahlin Peter and Ossi Pesämaa
- Impact of management practices on construction productivity in Indian building construction projects: an empirical study pp. 2383-2390

- Dixit Saurav
- A framework for achieving sustainability by overcoming the challenges of the construction supply chain during the design process pp. 2391-2415

- Othman Ayman Ahmed Ezzat and AlNassar Nooran
- Analyzing and modeling thermal complaints in a commercial building in France pp. 2416-2425

- Kocaman Ezgi, Kuru Merve and Çalış Gülben
Volume 12, issue 1, 2020
- Motivation of civil engineers and architects in Turkey pp. 2044-2052

- Damci Atilla, Arditi David, Polat Gul and Turkoglu Harun
- Motivation of civil engineers and architects in Turkey pp. 2044-2052

- Damci Atilla, Arditi David, Polat Gul and Turkoglu Harun
- Potentials of artificial intelligence in construction management pp. 2053-2063

- Eber Wolfgang
- Potentials of artificial intelligence in construction management pp. 2053-2063

- Eber Wolfgang
- On-site inspections: the shift from forms to digital capture pp. 2064-2071

- Rolfsen Christian Nordahl and Lassen Ann Karina
- On-site inspections: the shift from forms to digital capture pp. 2064-2071

- Rolfsen Christian Nordahl and Lassen Ann Karina
- Detecting unbalanced bids via an improved grading-based model pp. 2072-2082

- Polat Gul, Turkoglu Harun, Damci Atilla and Akin Firat Dogu
- Detecting unbalanced bids via an improved grading-based model pp. 2072-2082

- Polat Gul, Turkoglu Harun, Damci Atilla and Akin Firat Dogu
- Qualitative analysis of Request For Information to identify design flaws in steel construction projects pp. 2083-2094

- Fokwa Soh Mathieu, Barbeau Daniel, Doré Sylvie and Forgues Daniel
- Qualitative analysis of Request For Information to identify design flaws in steel construction projects pp. 2083-2094

- Fokwa Soh Mathieu, Barbeau Daniel, Doré Sylvie and Forgues Daniel
- Demystifying progressive design build: implementation issues and lessons learned through case study analysis pp. 2095-2108

- Shang Luming and Migliaccio Giovanni C.
- Demystifying progressive design build: implementation issues and lessons learned through case study analysis pp. 2095-2108

- Shang Luming and Migliaccio Giovanni C.
- Industrialization of construction: Implications on standards, business models and project orientation pp. 2109-2116

- Andersson Niclas and Lessing Jerker
- Industrialization of construction: Implications on standards, business models and project orientation pp. 2109-2116

- Andersson Niclas and Lessing Jerker
- Four stages of making project management flexible: insight, importance, implementation and improvement pp. 2117-2136

- Sohi Afshin Jalali, Bosch-Rekveldt Marian and Hertogh Marcel
- Application of time series models for heating degree day forecasting pp. 2137-2146

- Kuru Merve and Calis Gulben
- Application of time series models for heating degree day forecasting pp. 2137-2146

- Kuru Merve and Calis Gulben
- Erratum to: Review of previous applications of innovative information technologies in construction health and safety pp. 2147-2147

- Mihić Matej, Vukomanović Mladen and Završki Ivica
- Erratum to: Review of previous applications of innovative information technologies in construction health and safety pp. 2147-2147

- Mihić Matej, Vukomanović Mladen and Završki Ivica
- Model and data management issues in the integrated assessment of existing building stocks pp. 2148-2157

- Honic Meliha and Kovacic Iva
- Organisational culture of construction companies in Lagos State, Nigeria pp. 2158-2169

- Alao T.O. and Aina O.O.
- Organisational culture of construction companies in Lagos State, Nigeria pp. 2158-2169

- Alao T.O. and Aina O.O.
- Symbiosis of life-cycle structural design and asset management based on Building Information Modeling: Application for industrial facility equipment pp. 2170-2180

- Lenz Lisa, Weist Kai Christian, Hoepfner Marvin, Spyridis Panagiotis and Gralla Mike
- Unsuccessful bids: Coefficient of variation of bids as indicator of project risk pp. 2193-2199

- Kim Young Joo and Skibniewski Miroslaw J.
- Unsuccessful bids: Coefficient of variation of bids as indicator of project risk pp. 2193-2199

- Kim Young Joo and Skibniewski Miroslaw J.
- An automated nD model creation on BIM models pp. 2218-2231

- Vycital Miroslav and Jarský Cenek
- An automated nD model creation on BIM models pp. 2218-2231

- Vycital Miroslav and Jarský Cenek
- Construction labor and skill shortages in Croatia: causes and response strategies pp. 2232-2244

- Ceric Anita and Ivic Ivona
- Construction labor and skill shortages in Croatia: causes and response strategies pp. 2232-2244

- Ceric Anita and Ivic Ivona
- EPC 4.0: The quest for reducing CAPEX in EPC projects pp. 2245-2255

- Wagner Reinhard F.
- Improving competences of engineers and workers in the AEC industry for delivering NZEBs pp. 2256-2274

- Gumbarević Sanjin, Milovanović Bojan, Bagarić Marina, Gaši Mergim and Dunović Ivana Burcar
- Study of factors affecting the performance of construction projects in AEC industry pp. 2275-2282

- Dixit Saurav
| |