Organization, Technology and Management in Construction
2016 - 2025
Current editor(s): Mladen Radujković From Sciendo Bibliographic data for series maintained by Peter Golla (). Access Statistics for this journal.
Is something missing from the series or not right? See the RePEc data check for the archive and series.
Volume 11, issue 1, 2019
- A Review on Using Opportunities of Augmented Reality and Virtual Reality in Construction Project Management pp. 1839-1852

- Ahmed Shakil
- Overview of construction simulation approaches to model construction processes pp. 1853-1861

- Bokor Orsolya, Florez Laura, Osborne Allan and Gledson Barry J.
- Identifying New Knowledge Areas to Strengthen the Project Management Institute (PMI) Framework pp. 1892-1903

- Iyer K. Chandrashekhar and Banerjee Partha S.
- Evaluation of workplace safety performance in the Chinese petroleum industry pp. 1904-1910

- Ma Mingxue, Tam Vivian Wy, Huang Zhiyu, Sing Michael Cp and Shen Liyin
- Enhancing the performance of architectural design firms through addressing the gap of workforce skills in developing countries: a good-to-great approach pp. 1911-1924

- Othman Ayman Ahmed Ezzat and Sokkar Dana Ashraf
- Market value of the view restriction pp. 1925-1932

- Hajnal István
- Causes of Accident at Construction Sites in Bangladesh pp. 1933-1951

- Ahmed Shakil
- Review of previous applications of innovative information technologies in construction health and safety pp. 1952-1967

- Mihić Matej, Vukomanović Mladen and Završki Ivica
- The Engineering Project Organization Society and megaprojects: literature analysis using keywords pp. 1968-1974

- Ceric Anita and Sertic Josip
- Analysis of internationalization trends in the construction industry with an overview on Croatian construction companies pp. 1975-1983

- Butković Lana Lovrenčić and Mihić Matej
- Measuring the performance of project risk management: a preliminary model pp. 1984-1991

- Serpell Alfredo Federico, Ferrada Ximena and Rubio Larissa
- The Planning and Appraisal of Mega Transport Infrastructure Projects Delivered by Public–Private Partnerships: The Case for the Use of Policy-Led Multi-Criteria Analysis pp. 1992-2008

- Ward John, Dimitriou Harry T, Field Brian G and Dean Marco
- The impact of changes in the geological conditions of road bedrock layers while the road was in use pp. 2009-2021

- Smugala Stanislav, Kubečková Darja and Indra František
- An appraisal of building control and regulations practice in Nigeria: Project managers’ perspectives pp. 2022-2033

- Osuizugbo Innocent Chigozie
- Supply chain management and lean concept in construction: a case of Ghanaian building construction industry pp. 2034-2043

- Boateng Ali
Volume 10, issue 1, 2018
- Genetic algorithm optimization for dynamic construction site layout planning pp. 1655-1664

- Farmakis Panagiotis M. and Chassiakos Athanasios P.
- Control panel and indicators for production control in building projects pp. 1665-1673

- Orihuela Pablo, Pacheco Santiago and Orihuela Jorge
- Precedence permutation patterns creating criticality constellations: Exploring a conjecture on nonlinear activities with continuous links pp. 1674-1683

- Lucko Gunnar and Su Yi
- Interaction researching mental spaces of movable context, stakeholders, and project manager pp. 1684-1695

- Verenych Olena and Bushuyev Sergey
- Nigerian Professional Female Construction Workers in Vocational Occupations: Diversification or Deviation? pp. 1696-1703

- Odubiyi Tawakalitu Bisola
- Adaptive reuse: an innovative approach for generating sustainable values for historic buildings in developing countries pp. 1704-1718

- Othman Ayman Ahmed Ezzat and Elsaay Heba
- Appraising the use of labour-only procurement system for building construction in Nigeria pp. 1719-1726

- Akinkunmi Olutayo Gabriel, Aghimien Douglas Omoregie and Awodele Oluwaseyi Alabi
- Power spectral and bispectral study of factors affecting employee turnover pp. 1727-1734

- Tam Vivian W.Y. and Le Khoa N.
- Life cycle management in upgrade and renewal of civil infrastructures pp. 1735-1746

- Hertogh Marcel J.C.M., Bakker Jaap D., Vlist Maarten J. van der and Barneveld Albert S.
- Identification and evaluation of criteria for selecting contractors using a risk management approach pp. 1747-1760

- Mousakhani Ehsan, Ranjbar Shirzad and Ashoori Taha
- The use of Bim in public construction supervision in Brazil pp. 1761-1769

- Rocha de Matos Cleiton and Carlos de Oliveira Miranda Antonio
- Exploring the consequences of human multitasking in industrial automation projects: a tool to mitigate impacts – Part II pp. 1770-1777

- Petroutsatou Kleopatra and Sifiniadis Anestis
- Analysis of Rework Risk Triggers in the Nigerian Construction Industry pp. 1778-1793

- Eze Emmanuel Chidiebere, Idiake John Ebhohimen and Ganiyu Bashir Olanrewaju
- An Analytical Study of Critical Factors Affecting Contractor Efficiency in Construction Projects in Indian Scenario pp. 1794-1802

- Deep Shumank, Simon Laura, Asim Mohd, Rahimzadeh Ali and Al-Hamdani Sulala
- Optimization of Shoring/Reshoring Levels in High-Rise Building Construction pp. 1803-1826

- Sohoni Prachi, Ghaffar Abdul, Matsagar Vasant A. and Jha K.N.
- Towards lean and green thinking in construction projects at Gaza Strip pp. 1827-1838

- El-sawalhi Nabil I., Jaber Bilal Majid and Shukri Abed Al
Volume 9, issue 1, 2017
- Construction mediation and its hybridization: the case of the Hong Kong construction industry pp. 1528-1536

- Ng Pui-Lam and Banaitis Audrius
- Assessment of highway infrastructure projects in Latin America and Perú from the competences point of view pp. 1537-1546

- Zevallos Germán Gallardo, Machicao Tatiana and Romero María Josée Martínez-Echevarría
- Achieving competitive advantage through the integration of disabled architects in architectural design firms in Egypt pp. 1547-1558

- Othman Ayman Ahmed Ezzat and Sorial Marise Hossam Hosny
- Modeling of the Time Structure of Construction Processes Using Neural Networks pp. 1559-1564

- Petlíková Kateřina and Jarský Čeněk
- Innovation of education for the development of key competencies of university graduates pp. 1565-1573

- Bašková Renáta and Struková Zuzana
- Recognition of the role of nature in the formation of fractal architecture pp. 1574-1583

- Mirmoradi Seyedeh Somayeh
- Assessing the influence of project management on quality during the early phases of construction projects pp. 1584-1592

- Ljevo Žanesa, Vukomanović Mladen and Džebo Suada
- Cost and time performance of traditional-, direct labour- and management-procured public projects in Ondo State, Nigeria pp. 1593-1603

- Aghimien Douglas Omoregie, Osanyinro Olufemi and Adegbembo Taiwo Fadeke
- Comparing three scheduling methods using BIM models in the Last Planner System pp. 1604-1614

- Brioso Xavier, Murguia Danny and Urbina Alonso
- Evaluation of stigmatized properties pp. 1615-1626

- Hajnal István
- An integration of spreadsheet and project management software for cost optimal time scheduling in construction pp. 1627-1637

- Valenko Tadej and Klanšek Uroš
- A state-of-the-art review of built environment information modelling (BeIM) pp. 1638-1654

- Tah J.H.M., Oti A.H. and Abanda F.H.
Volume 8, issue 1, 2016
- Effect of bond administration on construction project delivery pp. 1390-1396

- Oke Ayodeji Emmanuel
- Innovation enablers: A review of Turkish contractors’ collaborative activities and sources of information pp. 1397-1404

- Ilter A. Tolga
- Preliminary estimate for reinforcement steel quantity in residential buildings pp. 1405-1410

- Mahamid Ibrahim
- Sustainability in architectural heritage: review of policies and practices pp. 1411-1421

- Sigmund Zvonko
- Strengths, weaknesses, opportunities and threats of virtual team in Nigerian construction industry pp. 1422-1428

- Odubiyi Tawakalitu Bisola and Oke Ayodeji Emmanuel
- Women professionals’ participation in the nigerian construction industry: finding voice for the voiceless pp. 1429-1436

- Jimoh Richard Ajayi, Oyewobi Luqman Oyekunle, Adamu Amina Nna and Bajere Paul Abayomi
- Supply chain collaboration within the Iranian construction industry pp. 1437-1445

- Bidabadi Zahra Toroghi, Hosseinalipour Mujtaba, Hamidizadeh Mohammad Reza and Mohebifar Amirhossein
- The Road Pavement Condition Index (PCI) Evaluation and Maintenance: A Case Study of Yemen pp. 1446-1455

- Karim Fareed M.A., Rubasi Khaled Abdul Haleem and Saleh Ali Abdo
- Exploitation of cloud computing in management of construction projects in Slovakia pp. 1456-1463

- Mandičák Tomáš, Mesároš Peter and Kozlovská Mária
- Project ambidexterity: case of recovering schedule delay in a brownfield airport project in India pp. 1464-1481

- Iyer K. Chandrashekhar and Banerjee Partha S.
- Financial Planning and Management Practices of Electrical Contractors pp. 1482-1498

- Lucko Gunnar
- Sixty years of project planning: history and future pp. 1499-1510

- Hajdu M. and Isaac S.
- Incorporating Lean Construction agent into the Building Standards Act: the Spanish case study pp. 1511-1517

- Brioso Xavier and Humero Antonio
- Arrangement of material depots for line segment–modeled structures using continuous conditions pp. 1518-1527

- Pém Attila and Mályusz Levente
| |