European Journal of Industrial Engineering
2007 - 2025
From Inderscience Enterprises Ltd Bibliographic data for series maintained by Sarah Parker (). Access Statistics for this journal.
Is something missing from the series or not right? See the RePEc data check for the archive and series.
Volume 6, issue 6, 2012
- Disruption management for commercial airlines: methods and results for the ROADEF 2009 Challenge pp. 669-689

- Christian Artigues, Eric Bourreau, H. Murat Afsar, Olivier Briant and Mourad Boudia
- Disruptions in the airline industry: math-heuristics for re-assigning aircraft and passengers simultaneously pp. 690-712

- Raïd Mansi, Saïd Hanafi, Christophe Wilbaut and François Clautiaux
- Extending metaheuristics based on bin packing for SALBP to PALBP pp. 713-732

- Nathalie Grangeon and Sylvie Norre
- Managing reward and risk of the newsboy problem with range information pp. 733-750

- Guiqing Zhang, Yinfeng Xu, Yucheng Dong and Hongyi Li
- Heuristics for the response time variability problem pp. 751-764

- Albert Corominas, Wieslaw Kubiak and Rafael Pastor
- Penalty function approaches for ship multidisciplinary design optimisation (MDO) pp. 765-784

- Emilio Fortunato Campana, Giovanni Fasano and Daniele Peri
Volume 6, issue 5, 2012
- A review of condition-based maintenance decision-making pp. 519-541

- Rosmaini Ahmad and Shahrul Kamaruddin
- Bundling in a supply chain: insights and implications pp. 542-571

- Chirag Surti and Elkafi Hassini
- The performance of combinatorial priority rules in a manufacturing flow shop pp. 572-595

- Felix T.S. Chan and Hing Kai Chan
- Solving the single machine scheduling problem with general job-dependent past-sequence-dependent setup times and learning effects pp. 596-628

- H.M. Soroush
- A comparison of semantic and spatial stimulus-response compatibility effects for human-machine interface design pp. 629-643

- Alan H.S. Chan and Calvin K.L. Or
- Parameter estimation for the Birnbaum-Saunders distribution under an accelerated degradation test pp. 644-665

- Jyh-Wen Ho
Volume 6, issue 4, 2012
- A two-phase methodology for modular product customisation pp. 391-421

- Hazem J. Smadi, Ali K. Kamrani and Sa'Ed M. Salhieh
- The development of a hierarchical rough-cut capacity planning model and demand management system for fishing-net manufacturing pp. 422-440

- Chiung-Hsi Hsieh, Taho Yang, Chao-Ton Su and Cheng-Han Lin
- Some polynomial solvable single-machine scheduling problems with a truncation sum-of-processing-times-based learning effect pp. 441-453

- Chin-Chia Wu, Yunqiang Yin, Wen-Hsiang Wu and Shuenn-Ren Cheng
- Resolution of the two-part cyclic hoist scheduling problem with bounded processing times in complex lines' configuration pp. 454-473

- Adnen El Amraoui, Marie-Ange Manier, Abdellah El Moudni and Mohamed Benrejeb
- Scheduling a bi-criteria flowshop manufacturing cell with sequence-dependent family setup times pp. 474-496

- Shih-Wei Lin and Kuo-Ching Ying
- Online scheduling of flexible job-shops with blocking and transportation pp. 497-518

- Jens Poppenborg, Sigrid Knust and Joachim Hertzberg
Volume 6, issue 3, 2012
- Revised simplex method and its application for solving fuzzy linear programming problems pp. 259-280

- S.H. Nasseri, H. Attari and A. Ebrahimnejad
- The use of a simulation, a hybrid Taguchi, and dual response surface methods in the automated material handling system tool-to-tool strategy for a 300-mm fab pp. 281-300

- Taho Yang, Yu-An Shen, Chiwoon Cho and Yu-Ru Lin
- The pipeline and valve location problem pp. 301-321

- Gilbert Laporte and Marta M.B. Pascoal
- Material and process selection in product design using decision-making technique (AHP) pp. 322-346

- Salil Desai, Bopaya Bidanda and Michael R. Lovell
- A Bayesian approach for measuring process performance with asymmetric tolerances pp. 347-368

- Chien-Wei Wu
- An improved approach for constructing lower confidence bound on process yield pp. 369-390

- Chien-Wei Wu, Mou-Yuan Liao and James C. Chen
Volume 6, issue 2, 2012
- Outsourcing and production scheduling technology adoption in Taiwan: an empirical study pp. 139-152

- Shu-Yun Peng, Hui-Ming Wee and Jui-Chin Jiang
- Integrated cooperative inventory models with one vendor and multiple buyers in the supply chain pp. 153-176

- Ming-Feng Yang and Yi Lin
- Permutation flowshops in group scheduling with sequence-dependent setup times pp. 177-198

- B. Naderi and Nasser Salmasi
- Minimising makespan for multistage hybrid flowshop scheduling problems with multiprocessor tasks by a hybrid immune algorithm pp. 199-215

- Kuo-Ching Ying
- The transportation value stream map (TVSM) pp. 216-233

- Bernardo Villarreal
- Solving the optimal process target problem using computer-generated experimental designs pp. 234-258

- Paul L. Goethals and Byung Rae Cho
Volume 6, issue 1, 2012
- A hybrid PSO-SA algorithm for the travelling tournament problem pp. 2-25

- Alireza Tajbakhsh, Kourosh Eshghi and Azam Shamsi
- Optimal ordering policy in response to a temporary sale price when retailer's warehouse capacity is limited pp. 26-49

- Chih-Te Yang, Liang-Yuh Ouyang, Kun-Shan Wu and Hsiu-Feng Yen
- A hybrid algorithm for fuzzy clustering pp. 50-67

- Z.H. Che
- Inventory systems with variable capacity pp. 68-86

- Ilkyeong Moon, Byung-Hyun Ha and Jongchul Kim
- Users' perceptions of usability and aesthetics as criteria of pre- and post-use preferences pp. 87-117

- Sangwon Lee and Richard J. Koubek
- Lean Six Sigma (LSS): an implementation experience pp. 118-137

- Satya S. Chakravorty and Aakash D. Shah
Volume 5, issue 4, 2011
- Branch-and-bound algorithms for scheduling in an m-machine permutation flowshop with a single objective and with multiple objectives pp. 361-387

- N. Madhushini and Chandrasekharan Rajendran
- Multiproduct EPQ model with single machine, backordering and immediate rework process pp. 388-411

- Ata Allah Taleizadeh, Seyed Jafar Sadjadi and Seyed Taghi Akhavan Niaki
- Subcontracting integration in a joint maintenance/production policy: study on profitability conditions pp. 412-423

- Mohammed Dahane, Nidhal Rezg and Christian Clementz
- Minimising mean squared deviation of job completion times about a common due date in multimachine systems pp. 424-447

- B. Srirangacharyulu and G. Srinivasan
- Performance modelling of autonomous vehicle storage and retrieval systems with generally distributed service times pp. 448-470

- Li Zhang, Ananth Krishnamurthy, Charles J. Malmborg and Sunderesh S. Heragu
- A hybrid CP/MILP method for scheduling with energy costs pp. 471-489

- Alain Haït and Christian Artigues
Volume 5, issue 3, 2011
- Modelling and analysis of semiconductor manufacturing in a shrinking world: challenges and successes pp. 254-271

- Chen-Fu Chien, Stephane Dauzere-Peres, Hans Ehm, John W. Fowler, Zhibin Jiang, Shekar Krishnaswamy, Tae-Eog Lee, Lars Monch and Reha Uzsoy
- Experiences in implementing simulation-based support for operational decision making in semiconductor manufacturing pp. 272-291

- Ching-Hua Chen-Ritzo, Sugato Bagchi, Lindsay E. Burns and Steven C. Catlett
- Simulation analysis of semiconductor manufacturing with small lot size and batch tool replacements pp. 292-312

- Kilian Stubbe and Oliver Rose
- Queueing networks with batch service pp. 313-326

- Th. Hanschke and H. Zisgen
- Machine capacity allocation strategies for scheduling a large multi-chip assembly line pp. 327-337

- Sang-Jin Lee and Tae-Eog Lee
- Optimisation approaches for batch scheduling in semiconductor manufacturing pp. 338-359

- Andreas Klemmt, Gerald Weigert and Sebastian Werner
Volume 5, issue 2, 2011
- An efficient hybrid algorithm for the two-machine no-wait flow shop problem with separable setup times and single server pp. 111-131

- Hamed Samarghandi and Tarek Y. ElMekkawy
- Integrated system for maintenance and safety management through FMECA principles and fuzzy inference engine pp. 132-169

- Matteo Mario Savino, Alessandro Brun and Carlo Riccio
- A framework for assessing the cost effectiveness of lean tools pp. 170-197

- Imad Alsyouf, Raid Al-Aomar, Heba Al-Hamed and Xiaojin Qiu
- Economic order quantity models for deteriorating items and partial backlogging when demand is quadratic in time pp. 198-214

- Jinn-Tsair Teng, Hui-Ling Yang and Maw-Sheng Chern
- Application of Taguchi method to analyse the impacts of common process and batch size in multistage production system under uncertain conditions pp. 215-231

- Md. Abdul Wazed, Shamsuddin Ahmed and Yusoff Nukman
- Integrating surgeons' preferences in the operating theatre planning pp. 232-250

- Benoit Roland and Fouad Riane
Volume 5, issue 1, 2011
- Monte Carlo simulation based procedures for solving block layout problems pp. 2-21

- Wai Kin Victor Chan and Charles J. Malmborg
- Cell formation using a simulated annealing algorithm with variable neighbourhood pp. 22-42

- Kuo-Ching Ying, Shih-Wei Lin and Chung-Cheng Lu
- Fuzzy adaptive resonance theory approach to supplier involvement in product development: a case study in Turkish automobile industry pp. 43-63

- Coskun Ozkan, Gulsen Akman, Gulsen Aydin Keskin and Fatma Mine Otkur
- Heuristic for integrated purchasing and production planning pp. 64-80

- Supakanya Chinprateep and Rein Boondiskulchok
- Application of a mathematical model to an intermediate- to long-term real-world steel production planning problem based on standard software pp. 81-100

- Andreas Witt and Stefan Voss
- Vendor-buyer lot sizing problem with stochastic demand: an exact procedure under service level approach pp. 101-110

- Kadir Ertogral
| |