European Journal of Industrial Engineering
2007 - 2025
From Inderscience Enterprises Ltd Bibliographic data for series maintained by Sarah Parker (). Access Statistics for this journal.
Is something missing from the series or not right? See the RePEc data check for the archive and series.
Volume 1, issue 4, 2007
- Analysing inaccurate judgemental sales forecasts pp. 355-369

- Annastiina Kerkkanen and Janne Huiskonen
- A Lagrangian Relaxation approach for production planning with demand uncertainty pp. 370-390

- Haoxun Chen
- Bi-criteria scheduling of a flowshop manufacturing cell with sequence dependent setup times pp. 391-413

- S. Hamed Hendizadeh, Tarek Y. ElMekkawy and G. Gary Wang
- Operator staffing and scheduling for an IT-help call centre pp. 414-430

- Hesham K. Alfares
- Heuristics for the single machine scheduling problem with early and quadratic tardy penalties pp. 431-448

- Jorge M.S. Valente
- An analysis of the stochastic behaviour for shift conversion system pp. 449-461

- K. Senthamarai Kannan and C. Vijayalakshmi
Volume 1, issue 3, 2007
- Controlling bullwhip and inventory variability with the golden smoothing rule pp. 241-265

- Stephen M. Disney, Ingrid Farasyn, Marc R. Lambrecht, Denis R. Towill and Wim Van De Velde
- Optimal (s, S) production policies with delivery time guarantees and breakdowns pp. 266-279

- Olfa Jellouli, Eric Chatelet and Patrick Lallement
- Using financial incentives as a coordinating mechanism to improve the supply chain network integration pp. 280-300

- Navee Chiadamrong, Kanit Prasertwattana and Shimizu Yoshiaki
- Order oriented slotting: a new assignment strategy for warehouses pp. 301-316

- Ronald J. Mantel, Peter C. Schuur and Sunderesh S. Heragu
- Genetic algorithms for generalised hypertree decompositions pp. 317-340

- Nysret Musliu and Werner Schafhauser
- The operator-machine assignment problem pp. 341-353

- Edward F. Stafford
Volume 1, issue 2, 2007
- Analysing risk orientation in a stochastic VRP pp. 111-130

- Marc Reimann
- Using simulation to determine reliability and availability of telecommunication networks pp. 131-151

- Javier Faulin, Angel A. Juan, Carles Serrat and Vicente Bargueno
- Metaheuristics for solving economic lot scheduling problems (ELSP) using time-varying lot-sizes approach pp. 152-181

- C. Chandrasekaran, Chandrasekharan Rajendran, O.V. Krishnaiah Chetty and Donakonda Hanumanna
- Parameter setting in a bio-inspired model for dynamic flexible job shop scheduling with sequence-dependent setups pp. 182-199

- Xuefeng Yu, Bala Ram and Xiaochun Jiang
- An approximation method to analyse polling models of pull-type production systems pp. 200-222

- Mustafa Karakul and Abdullah Dasci
- Climbing depth-bounded discrepancy search for solving hybrid flow shop problems pp. 223-243

- Abir Ben Hmida, Marie-Jose Huguet, Pierre Lopez and Mohamed Haouari
Volume 1, issue 1, 2007
- Fixed trading costs, signal processing and stochastic portfolio networks pp. 5-21

- C. Kenneth Jones
- Quantification of risk mitigation environment of supply chains using graph theory and matrix methods pp. 22-39

- Mohd Nishat Faisal, D.K. Banwet and Ravi Shankar
- The 'effective variance' control chart for monitoring the dispersion process with missing data pp. 40-55

- J. Carlos Garcia-Diaz
- Influencing factors of job waiting time variance on a single machine pp. 56-73

- Xueping Li, Nong Ye, Xiaoyun Xu and Rapinder Sawhey
- Scalable material assignment methods for build-to-order environments pp. 74-92

- Kaipei Chen, Scott A. Moses and P. Simin Pulat
- A multimedia educational tool integrating materials handling technology, analysis and design using a virtual distribution center pp. 93-110

- Shaelynn Hales, Sunderesh S. Heragu, Robert J. Graves, Sybillyn Jennings and Charles Malmborg
| |