European Journal of Industrial Engineering
2007 - 2025
From Inderscience Enterprises Ltd Bibliographic data for series maintained by Sarah Parker (). Access Statistics for this journal.
Is something missing from the series or not right? See the RePEc data check for the archive and series.
Volume 5, issue 4, 2011
- Branch-and-bound algorithms for scheduling in an m-machine permutation flowshop with a single objective and with multiple objectives pp. 361-387

- N. Madhushini and Chandrasekharan Rajendran
- Multiproduct EPQ model with single machine, backordering and immediate rework process pp. 388-411

- Ata Allah Taleizadeh, Seyed Jafar Sadjadi and Seyed Taghi Akhavan Niaki
- Subcontracting integration in a joint maintenance/production policy: study on profitability conditions pp. 412-423

- Mohammed Dahane, Nidhal Rezg and Christian Clementz
- Minimising mean squared deviation of job completion times about a common due date in multimachine systems pp. 424-447

- B. Srirangacharyulu and G. Srinivasan
- Performance modelling of autonomous vehicle storage and retrieval systems with generally distributed service times pp. 448-470

- Li Zhang, Ananth Krishnamurthy, Charles J. Malmborg and Sunderesh S. Heragu
- A hybrid CP/MILP method for scheduling with energy costs pp. 471-489

- Alain Haït and Christian Artigues
Volume 5, issue 3, 2011
- Modelling and analysis of semiconductor manufacturing in a shrinking world: challenges and successes pp. 254-271

- Chen-Fu Chien, Stephane Dauzere-Peres, Hans Ehm, John W. Fowler, Zhibin Jiang, Shekar Krishnaswamy, Tae-Eog Lee, Lars Monch and Reha Uzsoy
- Experiences in implementing simulation-based support for operational decision making in semiconductor manufacturing pp. 272-291

- Ching-Hua Chen-Ritzo, Sugato Bagchi, Lindsay E. Burns and Steven C. Catlett
- Simulation analysis of semiconductor manufacturing with small lot size and batch tool replacements pp. 292-312

- Kilian Stubbe and Oliver Rose
- Queueing networks with batch service pp. 313-326

- Th. Hanschke and H. Zisgen
- Machine capacity allocation strategies for scheduling a large multi-chip assembly line pp. 327-337

- Sang-Jin Lee and Tae-Eog Lee
- Optimisation approaches for batch scheduling in semiconductor manufacturing pp. 338-359

- Andreas Klemmt, Gerald Weigert and Sebastian Werner
Volume 5, issue 2, 2011
- An efficient hybrid algorithm for the two-machine no-wait flow shop problem with separable setup times and single server pp. 111-131

- Hamed Samarghandi and Tarek Y. ElMekkawy
- Integrated system for maintenance and safety management through FMECA principles and fuzzy inference engine pp. 132-169

- Matteo Mario Savino, Alessandro Brun and Carlo Riccio
- A framework for assessing the cost effectiveness of lean tools pp. 170-197

- Imad Alsyouf, Raid Al-Aomar, Heba Al-Hamed and Xiaojin Qiu
- Economic order quantity models for deteriorating items and partial backlogging when demand is quadratic in time pp. 198-214

- Jinn-Tsair Teng, Hui-Ling Yang and Maw-Sheng Chern
- Application of Taguchi method to analyse the impacts of common process and batch size in multistage production system under uncertain conditions pp. 215-231

- Md. Abdul Wazed, Shamsuddin Ahmed and Yusoff Nukman
- Integrating surgeons' preferences in the operating theatre planning pp. 232-250

- Benoit Roland and Fouad Riane
Volume 5, issue 1, 2011
- Monte Carlo simulation based procedures for solving block layout problems pp. 2-21

- Wai Kin Victor Chan and Charles J. Malmborg
- Cell formation using a simulated annealing algorithm with variable neighbourhood pp. 22-42

- Kuo-Ching Ying, Shih-Wei Lin and Chung-Cheng Lu
- Fuzzy adaptive resonance theory approach to supplier involvement in product development: a case study in Turkish automobile industry pp. 43-63

- Coskun Ozkan, Gulsen Akman, Gulsen Aydin Keskin and Fatma Mine Otkur
- Heuristic for integrated purchasing and production planning pp. 64-80

- Supakanya Chinprateep and Rein Boondiskulchok
- Application of a mathematical model to an intermediate- to long-term real-world steel production planning problem based on standard software pp. 81-100

- Andreas Witt and Stefan Voss
- Vendor-buyer lot sizing problem with stochastic demand: an exact procedure under service level approach pp. 101-110

- Kadir Ertogral
Volume 4, issue 4, 2010
- Engineering change order processing in ERP systems: an integrated reactive model pp. 394-412

- Benoit Saenz De Ugarte, Adnene Hajji, Robert Pellerin and Abdelhakim Artiba
- Scheduling hybrid flow shop problem with non-fixed availability constraints pp. 413-433

- Walid Besbes, Jacques Teghem and Taicir Loukil
- Solution of multidimensional knapsack problems via cooperation of dynamic programming and branch and bound pp. 434-449

- Vincent Boyer, Didier El Baz and Moussa Elkihel
- Multi-agent modelling for replenishment policies simulation in supply chains pp. 450-470

- Zied Bahroun, Mohamed Moalla, Ghanem Baazaoui and Jean-Pierre Campagne
- Two-stage flexible supply contract with payback and information update pp. 471-492

- Ali Cheaitou, Zied Jemai, Yves Dallery and Christian Van Delft
- A win-win collaboration approach for a two-echelon supply chain: a case study in the pulp and paper industry pp. 493-514

- Nadia Lehoux, Sophie D'Amours and Andre Langevin
Volume 4, issue 3, 2010
- Scheduling multiprocessor tasks to minimise the makespan on two dedicated processors pp. 265-279

- Adel Manaa and Chengbin Chu
- Preventive replacement models: an overview and their application in process industries pp. 280-307

- A.N. Das and S.P. Sarmah
- Quantifying barriers to implementing Total Quality Management (TQM) pp. 308-335

- Tilak Raj and Rajesh Attri
- An evolving hybrid neural approach for predicting job completion time in a semiconductor fabrication plant pp. 336-354

- Toly Chen and Yi-Chi Wang
- Implementing company policies in plant level asset operations: measuring organisational alignment pp. 355-371

- R.M. Chandima Ratnayake and Tore Markeset
- A fuzzy primal simplex algorithm and its application for solving flexible linear programming problems pp. 372-389

- S.H. Nasseri and A. Ebrahimnejad
Volume 4, issue 2, 2010
- Single-machine scheduling with inserted idle time to minimise a weighted quadratic function of job lateness pp. 131-166

- H.M. Soroush
- Commonality in manufacturing resources planning – issues and models: a review pp. 167-188

- Md. Abdul Wazed, Shamsuddin Ahmed and Yusoff Nukman
- A primal-dual method for linear programming problems with fuzzy variables pp. 189-209

- A. Ebrahimnejad, S.H. Nasseri, F. Hosseinzadeh Lotfi and M. Soltanifar
- A versatile framework for cooperative hub network development pp. 210-227

- Frans Cruijssen, Peter Borm, Wout Dullaert and Herbert Hamers
- An implementation model for lean programmes pp. 228-248

- Satya S. Chakravorty
- Managing hidden system threats for higher production regularity using intelligent technological solutions: a case study pp. 249-263

- Jawad Raza and Jayantha Prasanna Liyanage
Volume 4, issue 1, 2010
- An empirical study on supply chain management in India: the perspective of original equipment manufacturers and suppliers pp. 2-39

- T.N. Srikantha Dath, Chandrasekharan Rajendran and K. Narashiman
- Monte Carlo simulation methods for dynamic line layout problems with nonlinear movement costs pp. 40-58

- Wai Kin Victor Chan and Charles J. Malmborg
- Utility function-based patient prioritisation in the emergency department pp. 59-77

- David Claudio and Gul E. Okudan
- A decision-making framework for process plant maintenance pp. 78-98

- Devarun Ghosh and Sandip Roy
- Improved heuristics for the single machine scheduling problem with linear early and quadratic tardy penalties pp. 99-129

- Jorge M.S. Valente and Jeffrey E. Schaller
Volume 3, issue 4, 2009
- An exploration of the literature on the use of 'swarm intelligence-based techniques' for public service problems pp. 379-423

- Turkay Dereli, Serap Ulusam Seckiner, Gulesin Sena Das, Hadi Gokcen and Mehmet Emin Aydin
- The bees algorithm for workload balancing in examination job assignment pp. 424-435

- Adil Baykasoglu, Lale Ozbakir and Pinar Tapkan
- A general framework for an agent-based service performance assessment system in local governments pp. 436-449

- Ercan Oztemel and M. Ovul Arioglu Salmona
- Integrating fuzzy analytical hierarchy process and data envelopment analysis for performance management in automobile repair shops pp. 450-467

- R. Parameshwaran, P.S.S. Srinivasan, M. Punniyamoorthy, S.T. Charunyanath and C. Ashwin
- A statistics-based genetic algorithm for quality improvements of power supplies pp. 468-492

- K.Y. Chan, K.W. Chan, Glory T.Y. Pong, M.E. Aydin, T.C. Fogarty and S.H. Ling
Volume 3, issue 3, 2009
- Optimal lot sizing for deteriorating items with triangle-shaped demand and uncertain lead time pp. 247-260

- Ping-Hui Hsu, Hui-Ming Teng and Hui-Ming Wee
- Restricted job completion time variance minimisation on identical parallel machines pp. 261-276

- Yuerong Chen, Xueping Li and Rapinder Sawhney
- Long-term electricity demand forecasting for power system planning using economic, demographic and climatic variables pp. 277-304

- F. Chui, A. Elkamel, R. Surit, E. Croiset and P.L. Douglas
- Optimal batch sizing, quality improvement and rework for an imperfect production system with inspection and restoration pp. 305-335

- Mallika Parveen and T.V.V.L.N. Rao
- Selecting performance measurement systems: matching a supply chain's requirements pp. 336-362

- Alessandro Brun, Kamal Fahmy Salama and Marco Gerosa
- Dynamically allocating expediting funds in projects with schedule uncertainty pp. 363-376

- Robert L. Bregman
Volume 3, issue 2, 2009
- A simulation study of registration queue disciplines in an outpatient clinic: a two-stage patient flow model pp. 127-145

- Daiki Min and Yuehwern Yih
- Variance-based approximations of transaction waiting times in autonomous vehicle storage and retrieval systems pp. 146-169

- Li Zhang, Ananth Krishnamurthy, Charles J. Malmborg and Sunderesh S. Heragu
- Contractor selection in government procurement auctions: a case study pp. 170-186

- Sidhartha Siladitya Padhi and Pratap Kumar Jagadev Mohapatra
- Scheduling identical parallel batch processing machines to minimise makespan using genetic algorithms pp. 187-206

- Purushothaman Damodaran, Neal S. Hirani and Mario C. Velez-Gallego
- Estimating and incorporating the effects of a future QE project into a semiconductor yield learning model with a fuzzy set approach pp. 207-226

- Toly Chen
- A two-phased approach for the centralisation versus decentralisation of the hospital sterilisation service department pp. 227-246

- Houda Tlahig, Aida Jebali and Hanen Bouchriha
Volume 3, issue 1, 2009
- The role of human factors in agile supply chains pp. 2-20

- Akhilesh Barve, Arun Kanda and Ravi Shankar
- Supply chain design in the electronics industry incorporating JIT purchasing pp. 21-44

- Om Pal Singh and Satish Chand
- EOQ extensions exploiting the Lambert W function pp. 45-69

- Roger D.H. Warburton
- On price increases and temporary price reductions with partial backordering pp. 70-89

- Sanjay Sharma
- Improved time and space complexity for Kianfar's inequality rotation algorithm pp. 90-98

- D. El Baz, M. Elkihel, L. Gely and G. Plateau
- Process model development and validation using artificial neural networks pp. 99-125

- Mohamed H. Gadallah, Khaled Abdel Hamid El-Sayed and Keith Hekman
| |