European Journal of Industrial Engineering
2007 - 2025
From Inderscience Enterprises Ltd Bibliographic data for series maintained by Sarah Parker (). Access Statistics for this journal.
Is something missing from the series or not right? See the RePEc data check for the archive and series.
Volume 4, issue 4, 2010
- Engineering change order processing in ERP systems: an integrated reactive model pp. 394-412

- Benoit Saenz De Ugarte, Adnene Hajji, Robert Pellerin and Abdelhakim Artiba
- Scheduling hybrid flow shop problem with non-fixed availability constraints pp. 413-433

- Walid Besbes, Jacques Teghem and Taicir Loukil
- Solution of multidimensional knapsack problems via cooperation of dynamic programming and branch and bound pp. 434-449

- Vincent Boyer, Didier El Baz and Moussa Elkihel
- Multi-agent modelling for replenishment policies simulation in supply chains pp. 450-470

- Zied Bahroun, Mohamed Moalla, Ghanem Baazaoui and Jean-Pierre Campagne
- Two-stage flexible supply contract with payback and information update pp. 471-492

- Ali Cheaitou, Zied Jemai, Yves Dallery and Christian Van Delft
- A win-win collaboration approach for a two-echelon supply chain: a case study in the pulp and paper industry pp. 493-514

- Nadia Lehoux, Sophie D'Amours and Andre Langevin
Volume 4, issue 3, 2010
- Scheduling multiprocessor tasks to minimise the makespan on two dedicated processors pp. 265-279

- Adel Manaa and Chengbin Chu
- Preventive replacement models: an overview and their application in process industries pp. 280-307

- A.N. Das and S.P. Sarmah
- Quantifying barriers to implementing Total Quality Management (TQM) pp. 308-335

- Tilak Raj and Rajesh Attri
- An evolving hybrid neural approach for predicting job completion time in a semiconductor fabrication plant pp. 336-354

- Toly Chen and Yi-Chi Wang
- Implementing company policies in plant level asset operations: measuring organisational alignment pp. 355-371

- R.M. Chandima Ratnayake and Tore Markeset
- A fuzzy primal simplex algorithm and its application for solving flexible linear programming problems pp. 372-389

- S.H. Nasseri and A. Ebrahimnejad
Volume 4, issue 2, 2010
- Single-machine scheduling with inserted idle time to minimise a weighted quadratic function of job lateness pp. 131-166

- H.M. Soroush
- Commonality in manufacturing resources planning – issues and models: a review pp. 167-188

- Md. Abdul Wazed, Shamsuddin Ahmed and Yusoff Nukman
- A primal-dual method for linear programming problems with fuzzy variables pp. 189-209

- A. Ebrahimnejad, S.H. Nasseri, F. Hosseinzadeh Lotfi and M. Soltanifar
- A versatile framework for cooperative hub network development pp. 210-227

- Frans Cruijssen, Peter Borm, Wout Dullaert and Herbert Hamers
- An implementation model for lean programmes pp. 228-248

- Satya S. Chakravorty
- Managing hidden system threats for higher production regularity using intelligent technological solutions: a case study pp. 249-263

- Jawad Raza and Jayantha Prasanna Liyanage
Volume 4, issue 1, 2010
- An empirical study on supply chain management in India: the perspective of original equipment manufacturers and suppliers pp. 2-39

- T.N. Srikantha Dath, Chandrasekharan Rajendran and K. Narashiman
- Monte Carlo simulation methods for dynamic line layout problems with nonlinear movement costs pp. 40-58

- Wai Kin Victor Chan and Charles J. Malmborg
- Utility function-based patient prioritisation in the emergency department pp. 59-77

- David Claudio and Gul E. Okudan
- A decision-making framework for process plant maintenance pp. 78-98

- Devarun Ghosh and Sandip Roy
- Improved heuristics for the single machine scheduling problem with linear early and quadratic tardy penalties pp. 99-129

- Jorge M.S. Valente and Jeffrey E. Schaller
Volume 3, issue 4, 2009
- An exploration of the literature on the use of 'swarm intelligence-based techniques' for public service problems pp. 379-423

- Turkay Dereli, Serap Ulusam Seckiner, Gulesin Sena Das, Hadi Gokcen and Mehmet Emin Aydin
- The bees algorithm for workload balancing in examination job assignment pp. 424-435

- Adil Baykasoglu, Lale Ozbakir and Pinar Tapkan
- A general framework for an agent-based service performance assessment system in local governments pp. 436-449

- Ercan Oztemel and M. Ovul Arioglu Salmona
- Integrating fuzzy analytical hierarchy process and data envelopment analysis for performance management in automobile repair shops pp. 450-467

- R. Parameshwaran, P.S.S. Srinivasan, M. Punniyamoorthy, S.T. Charunyanath and C. Ashwin
- A statistics-based genetic algorithm for quality improvements of power supplies pp. 468-492

- K.Y. Chan, K.W. Chan, Glory T.Y. Pong, M.E. Aydin, T.C. Fogarty and S.H. Ling
Volume 3, issue 3, 2009
- Optimal lot sizing for deteriorating items with triangle-shaped demand and uncertain lead time pp. 247-260

- Ping-Hui Hsu, Hui-Ming Teng and Hui-Ming Wee
- Restricted job completion time variance minimisation on identical parallel machines pp. 261-276

- Yuerong Chen, Xueping Li and Rapinder Sawhney
- Long-term electricity demand forecasting for power system planning using economic, demographic and climatic variables pp. 277-304

- F. Chui, A. Elkamel, R. Surit, E. Croiset and P.L. Douglas
- Optimal batch sizing, quality improvement and rework for an imperfect production system with inspection and restoration pp. 305-335

- Mallika Parveen and T.V.V.L.N. Rao
- Selecting performance measurement systems: matching a supply chain's requirements pp. 336-362

- Alessandro Brun, Kamal Fahmy Salama and Marco Gerosa
- Dynamically allocating expediting funds in projects with schedule uncertainty pp. 363-376

- Robert L. Bregman
Volume 3, issue 2, 2009
- A simulation study of registration queue disciplines in an outpatient clinic: a two-stage patient flow model pp. 127-145

- Daiki Min and Yuehwern Yih
- Variance-based approximations of transaction waiting times in autonomous vehicle storage and retrieval systems pp. 146-169

- Li Zhang, Ananth Krishnamurthy, Charles J. Malmborg and Sunderesh S. Heragu
- Contractor selection in government procurement auctions: a case study pp. 170-186

- Sidhartha Siladitya Padhi and Pratap Kumar Jagadev Mohapatra
- Scheduling identical parallel batch processing machines to minimise makespan using genetic algorithms pp. 187-206

- Purushothaman Damodaran, Neal S. Hirani and Mario C. Velez-Gallego
- Estimating and incorporating the effects of a future QE project into a semiconductor yield learning model with a fuzzy set approach pp. 207-226

- Toly Chen
- A two-phased approach for the centralisation versus decentralisation of the hospital sterilisation service department pp. 227-246

- Houda Tlahig, Aida Jebali and Hanen Bouchriha
Volume 3, issue 1, 2009
- The role of human factors in agile supply chains pp. 2-20

- Akhilesh Barve, Arun Kanda and Ravi Shankar
- Supply chain design in the electronics industry incorporating JIT purchasing pp. 21-44

- Om Pal Singh and Satish Chand
- EOQ extensions exploiting the Lambert W function pp. 45-69

- Roger D.H. Warburton
- On price increases and temporary price reductions with partial backordering pp. 70-89

- Sanjay Sharma
- Improved time and space complexity for Kianfar's inequality rotation algorithm pp. 90-98

- D. El Baz, M. Elkihel, L. Gely and G. Plateau
- Process model development and validation using artificial neural networks pp. 99-125

- Mohamed H. Gadallah, Khaled Abdel Hamid El-Sayed and Keith Hekman
Volume 2, issue 4, 2008
- Heuristic approaches for determining minimum cost delivery quantities in supply chains pp. 377-400

- Alexander Hornung and Lars Monch
- Generic approach for the customisation of the TPM programme: using the process transformation model and reliability assessment tool pp. 401-427

- Mustafa M. Rashid and Hossam Ismail
- Estimating parameters of the three-parameter Weibull distribution using a neural network pp. 428-445

- Babak Abbasi, Luis Rabelo and Mehdi Hosseinkouchack
- Multi-item, economic order quantity model with permissible delay in payments and a budget constraint pp. 446-460

- Srimathy Mohan, Gopalakrishnan Mohan and Ashok Chandrasekhar
- Optimising the service capacity by using a speed-up simulation pp. 461-478

- Fermin Mallor Gimenez, Pedro M. Mateo Collazos and Isolina Alberto Moralejo
- On the choice of a demand distribution for inventory management models pp. 479-491

- Katrien Ramaekers and Gerrit K. Janssens
Volume 2, issue 3, 2008
- Deadlock-free scheduling of flexible job shops with limited capacity buffers pp. 231-252

- Sherif A. Fahmy, Tarek Y. ElMekkawy and Subramaniam Balakrishnan
- Demand signal modelling: a short-range panel forecasting algorithm for semiconductor firm device-level demand pp. 253-278

- Russell J. Elias, Douglas C. Montgomery, Stuart A. Low and Murat Kulahci
- A novel differential evolution algorithm for no-idle permutation flow-shop scheduling problems pp. 279-297

- Quan-Ke Pan and Ling Wang
- An ant colony algorithm for cell-formation in cellular manufacturing systems pp. 298-336

- N. Megala, Chandrasekharan Rajendran and Ram Gopalan
- A time-varying lot size method for the economic lot scheduling problem with shelf life considerations pp. 337-355

- Jiyin Liu, Lina Wu and Zhili Zhou
- A methodology to enhance equipment performance using the OEE measure pp. 356-376

- Anil S. Badiger, R. Gandhinathan and V.N. Gaitonde
Volume 2, issue 2, 2008
- The splittable pickup and delivery problem with reloads pp. 112-133

- H.L.M. Kerivin, M. Lacroix, A.R. Mahjoub and A. Quilliot
- An adaptive algorithm for the knapsack problem: perturbation of the profit or weight of an arbitrary item pp. 134-152

- Mhand Hifi, Hedi Mhalla and Slim Sadfi
- An unrelated parallel machines model for an industrial production resetting problem pp. 153-171

- Cedric Pessan, Jean-Louis Bouquard and Emmanuel Neron
- Operating theatre scheduling using Lagrangian relaxation pp. 172-189

- V. Augusto, X. Xie and V. Perdomo
- Modelling and solving a multimode and multisite industrial problem: Lagrangean relaxation and heuristic approaches pp. 190-206

- Michel Gourgand, Sylverin Kemmoe Tchomte and Alain Quilliot
- Lot-splitting for inspection in a synchronised two-stage manufacturing process with finite production rates and random out-of-control shifts in the first stage pp. 207-229

- Elkafi Hassini and Raymond G. Vickson
Volume 2, issue 1, 2008
- Establishment of semiconductor equipment purchasing evaluation model based on a knowledge management database pp. 1-16

- Ching-Chow Yang, Bai-Sheng Chen, Shu-Yun Peng, Tsu-Ming Yeh and Lung-Chia Wang
- A study on human-task-related performances in converting conveyor assembly line to cellular manufacturing pp. 17-34

- Ikou Kaku, Yasuhiko Murase and Yong Yin
- Forming relationships with stakeholders in engineering projects pp. 35-49

- Jan Terje Karlsen
- A survey of the literature on the multiple or parallel assembly line balancing problem pp. 50-72

- Amaia Lusa
- The reference installation approach for the estimation of industrial assets at risk pp. 73-93

- Jutta Geldermann, Mirjam Merz, Valentin Bertsch, Michael Hiete, Otto Rentz, Isabel Seifert, Annegret H. Thieken, Dietmar Borst and Ute Werner
- Spare parts criticality for unplanned maintenance of industrial systems pp. 94-107

- D. Tsakatikas, S. Diplaris and M. Sfantsikopoulos
| |