International Journal of Industrial and Systems Engineering
2006 - 2025
From Inderscience Enterprises Ltd Bibliographic data for series maintained by Sarah Parker (). Access Statistics for this journal.
Is something missing from the series or not right? See the RePEc data check for the archive and series.
Volume 4, issue 6, 2009
- Evaluating an adaptive One-Factor-At-a-Time search procedure within the Mahalanobis-Taguchi System pp. 600-614

- Chad R. Foster, Rajesh Jugulum and Daniel D. Frey
- Integrating the improvement and the control phase of Six Sigma for categorical responses through application of Mahalanobis-Taguchi System (MTS) pp. 615-630

- Tirthankar Dasgupta
- A comparison study and discussion of the Mahalanobis-Taguchi System pp. 631-644

- Seoung Bum Kim, Kwok-Leung Tsui, Thuntee Sukchotrat and Victoria C.P. Chen
- Classification, feature selection and prediction with Neural-network Taguchi System pp. 645-664

- Bharatendra K. Rai
- An unsupervised classification scheme for multi-class problems including feature selection based on MTS philosophy pp. 665-682

- Prasun Das and Sandip Mukherjee
- Forecasting consumer satisfaction for vehicle ride using a multivariate measurement system pp. 683-696

- Elizabeth A. Cudney, Rajesh Jugulum and Kioumars Paryani
Volume 4, issue 5, 2009
- Multivariate Process Control charts and their use in monitoring output quality: a perspective pp. 471-482

- Jeffrey Jarrett and X. Pan
- Defining Enterprise Systems Engineering pp. 483-501

- Oscar A. Saenz, Chin-Sheng Chen, Martha Centeno and Ronald E. Giachetti
- Performance analysis of scheduling rules in resource-constrained multiple projects pp. 502-535

- Balasubramanian Kanagasabapathi, Chandrasekharan Rajendran and Kuppuswamy Ananthanarayanan
- An improved model for production systems with mixed queuing priorities: an integrated simulation, AHP and Value Engineering approach pp. 536-553

- A. Azadeh, M. Haghnevis and Y. Khodadadegan
- A decision methodology for customising software products pp. 554-576

- Nuri Basoglu, Tugrul U. Daim and Ece Sofuoglu
- Modular modelling and performance evaluation of manufacturing systems using Max-Plus Algebra pp. 577-596

- Y.P. Reddy, G. Ranga Janardhana and Kim S. Kun
Volume 4, issue 4, 2009
- Non-contact estimation of surface roughness in turning using computer vision and Artificial Neural Networks pp. 349-367

- D. Shome, P.K. Ray and B. Mahanty
- An integrated GA-time series algorithm for forecasting oil production estimation: USA, Russia, India, and Brazil pp. 368-387

- A. Azadeh, M. Aramoon and M. Saberi
- WQCOST: a web-based technique for quality cost management pp. 388-406

- C. Sudhahar, R. Suresh Premil Kumar, V. Senthil, S.R. Devadasan and R. Murugesh
- A study of enablers of agile manufacturing pp. 407-430

- Mohd. Asif Hasan, Ravi Shankar, Joseph Sarkis, Arif Suhail and Sameera Asif
- Environmental performance of systems from reliability perspective pp. 431-445

- Kouroush Jenab, Liping Fang and Kourosh R. Noori
- The generalised dwell point location problem pp. 446-454

- Trevor S. Hale, Michael E. Hanna and Faizul Huq
- The role of freight transport in railway network investment evaluation pp. 455-470

- Juha Saranen and Olli-Pekka Hilmola
Volume 4, issue 3, 2009
- Developing a value stream map to evaluate breakdown maintenance operations pp. 229-240

- Rapinder Sawhney, Soundararajan Kannan and Xueping Li
- EOQ model for non-instantaneous deteriorating items with time-varying demand and partial backlogging pp. 241-254

- S.K. Manna, C.C. Lee and C. Chiang
- Agile manufacturing enablers for Finnish steel products network pp. 255-269

- Amol Gore, Harri Haapasalo and Teemu Tahtinen
- Quality indicators of engineering education programmes: a multi-criteria analysis from India pp. 270-282

- K.G. Viswanadhan
- A fuzzy rule-based in-process inspection and control system for a gear-hobbing process pp. 283-302

- Morteza Assadi and Hossein Cheraghi
- Reliability analysis of programmable mechatronics system using Bayesian approach pp. 303-325

- R. Amuthakkannan, S.M. Kannan, K. Vijayalakshmi and N. Ramaraj
- Hybrid Simulated Annealing in Flow Shop Scheduling: a diversification and intensification approach pp. 326-348

- Nader Azizi, Ming Liang and Saeed Zolfaghari
Volume 4, issue 2, 2009
- Assembly Features: definition, classification, and usefulness in sequence planning pp. 111-132

- Hamid Ullah, Erik L.J. Bohez and M.A. Irfan
- Fractional factorial designs that maximise the probability of identifying the important factors pp. 133-150

- Theodore T. Allen, Navara Chantarat and Cenny Taslim
- Multi-attribute selection method for materials handling equipment pp. 151-173

- Dragan Komljenovic and Vladislav Kecojevic
- Contractor selection with Multi Criteria Decision Support tools pp. 174-197

- Adil Baykasoglu, Erdogan Ozbay, M. Tolga Gogus and Ahmet Oztas
- Flexible Manufacturing System selection using an improved compromise ranking method pp. 198-215

- R. Venkata Rao
- Statistical analysis for comparing two 2D-part fixtures pp. 216-228

- Dewi Rahardja, Yan D. Zhao and Shuguang Huang
Volume 4, issue 1, 2009
- Collective efficacy and manufacturing schedule instability: a study in Hong Kong and the Pearl River Delta region pp. 1-18

- Kris M.Y. Law and Nyoman Pujawan
- Probabilistic majority rules pp. 19-31

- Annibal Parracho Sant'Anna
- ISO 9000 performance among the Malaysian companies: the effects of motives pp. 32-45

- A.M.A. Gader, M.Y. Ismail, A.M.S. Hamouda, N. Ismail and Khalifa Al-Khalifa
- Biomechanical analysis of main gun loader in an armoured combat vehicle pp. 46-59

- Venkatesh Balasubramanian and Sanjiv Sharma
- An approach to implement a Programmable Logic Controller from real-time software components pp. 60-75

- Mohamed Khalgui and Xavier Rebeuf
- Scheduling parallel batch processors with incompatible job families to minimise weighted completion time pp. 76-93

- M. Venkataramana and N.R. Srinivasa Raghavan
- Mathematical modelling of feature conversion pp. 94-110

- Hamid Ullah and Erik L.J. Bohez
Volume 3, issue 6, 2008
- A heuristic for priority-based scheduling in a turbine manufacturing job-shop pp. 625-643

- Sandeep Dulluri, V. Mahesh and C.S.P. Rao
- Application of ant colony optimisation algorithms in solving facility layout problems formulated as quadratic assignment problems: a review pp. 644-672

- Phen Chiak See and Kuan Yew Wong
- A system maturity index for the systems engineering life cycle pp. 673-691

- Brian J. Sauser, Jose E. Ramirez-Marquez, Devanandham Henry and Donald DiMarzio
- Steady state analysis of a M x /G/1 queue with two service modes and multiple vacations pp. 692-710

- S. Jeyakumar and R. Arumuganathan
- Adaptive process control for turning operation using expert systems pp. 711-726

- Bhaskaran Gopalakrishnan and Meredith L. McCoy
- Ergonomics interventions improve quality in manufacturing: a case study pp. 727-745

- Oguzhan Erdinc and Ozalp Vayvay
Volume 3, issue 5, 2008
- A simulation study of automating parcel sorting in postal industry pp. 515-529

- Adenekan (Nick) Dedeke and Kuo-Ting Hung
- Exploiting empirical knowledge for bi-dimensional knapsack problem heuristics pp. 530-548

- Yong Kun Cho, James T. Moore, Raymond R. Hill and Charles H. Reilly
- Reliable stochastic design of road network systems pp. 549-574

- Loukas Dimitriou, Antony Stathopoulos and Theodore Tsekeris
- Multiobjective supplier selection using optimisation technique for balancing supply chain pp. 575-593

- N. Arunkumar, L. Karunamoorthy, Amrish A. Lobo Shenoy, N. Thamizhvaanan and Vikram B. Naidu
- Overall Cycle time Effectiveness metric for system-level service performance measurement and bottleneck detection pp. 594-609

- Kanthi M.N. Muthiah and Samuel H. Huang
- Stochastic models for reliable and unreliable flexible manufacturing cells with two machines and two robots pp. 610-624

- Majid M. Aldaihani and Mehmet Savsar
Volume 3, issue 4, 2008
- Global automata: a new approach on modelling industrial systems pp. 383-406

- Vasileios Deligiannis, Stamatis Manesis and John Lygeros
- Effect of business growth on software project management issues in Indian IT industry pp. 407-422

- Padmanav Acharya and Biswajit Mahanty
- A facility maintenance scheduling model incorporating opportunity and inflationary costs pp. 423-466

- S.A. Oke, A.E. Oluleye, F.A. Oyawale and O.E. Charles-Owaba
- Optimisation of process parameters in grinding on different dimensions and perspectives pp. 447-473

- N. Alagumurthi, K. Palaniradja and V. Soundararajan
- Use of machine learning for continuous improvement of the real time heterarchical manufacturing control system performances pp. 474-497

- Nassima Aissani, Bouziane Beldjilali and Damien Trentesaux
- Development of a performance measurement system for manufacturing systems pp. 498-513

- S.A. Oke, I.O. Oyedokun, O.G. Akanbi and F.A. Oyawale
Volume 3, issue 3, 2008
- A generic platform to address event-based problems for universal applications: supervisory control and simulation pp. 257-276

- Alireza Mousavi, Peter Broomhead and Rama K. Devagiri
- Due date assignment using ADRES and simulated annealing pp. 277-297

- Adil Baykasoglu, Mustafa Gocken and Zeynep D. Unutmaz
- Sensitivity analysis of a preventive maintenance scheduling model pp. 298-323

- S.A. Oke, A.E. Oluleye, F.A. Oyawale and O.E. Charles-Owaba
- Resource breakdown modelling and performance maximisation of a multiple product flexible manufacturing system pp. 324-347

- Tauseef Aized, Koji Takahashi, Ichiro Hagiwara and Hiroaki Morimura
- A Decision Support System for the cell formation problem pp. 348-367

- Deniz Tursel Eliiyi and Levent Kandiller
- Supplier evaluation with GD-based multi criteria decision making pp. 368-381

- Md. Noor-E-Alam, M. Ahsan Akhtar Hasin, A.M.M. Sharif Ullah and Tahmina Ferdousi Lipi
Volume 3, issue 2, 2008
- Facility layout design for multiple production scenarios in a dynamic environment pp. 105-133

- Krishna K. Krishnan, S. Hossein Cheraghi and Chandan N. Nayak
- Prediction of drill-bit breakage from degradation signals using Mahalanobis-Taguchi system analysis pp. 134-148

- Bharatendra K. Rai, Ratna Babu Chinnam and Nanua Singh
- Efficient mechanism development for multirobot coordination pp. 149-161

- J. Muralidharan, Angappa Gunasekaran, S.P. Nachiappan and A. Nivin Kumar
- Supply chain performance measurement system: a Monte Carlo DEA-based approach pp. 162-188

- Wai Peng Wong, Wikrom Jaruphongsa and Loo Hay Lee
- Modelling and simulation for the prediction of surface roughness in plane magnetic abrasive finishing pp. 189-210

- Er Atul Khatri and Vinod Yadava
- Promising orders in supply chain networks pp. 211-228

- Uday Venkatadri, Shentao Wang and Ashish Saraswat
- Software quality measurement and improvement for real-time systems using quality tools and techniques: a case study pp. 229-256

- R. Amuthakkannan, S.M. Kannan, V. Selladurai and K. Vijayalakshmi
Volume 3, issue 1, 2008
- R&D task programming of electromechanical product in networked manufacturing environment pp. 3-17

- Liu Tianhu, Chen Xin, Chen Xindu and Zou Xiangjun
- A study on a general rapid prototyping software based on distributed technology pp. 18-30

- Lida Shen, Jianfeng Zhao, Yinhui Huang and Zongjun Tian
- An affordable Reverse Engineering framework for innovative rapid product development pp. 31-37

- Turkay Dereli, Adil Baykasoglu and Gulcin Buyukozkan
- An intelligent technology watch function for the high technology enterprise pp. 38-52

- Allan Hodgson, Husam Arman and Nabil N.Z. Gindy
- Managing the effects of variability in drum-buffer-rope systems pp. 53-69

- Riham A. Khalil, David J. Stockton and John A. Fresco
- Study on modelling obstacles-avoidance behaviour of virtual driver based on multilayer fuzzy neural network pp. 70-86

- Lou Yan, He Hanwu, Zheng Detao and Lu Yongming
- Developing strategies fostering product development using multicriteria analysis pp. 87-103

- Tarun Soota, Harvendra Singh and R.C. Mishra
| |