International Journal of Project Organisation and Management
2008 - 2026
From Inderscience Enterprises Ltd Bibliographic data for series maintained by Sarah Parker (). Access Statistics for this journal.
Is something missing from the series or not right? See the RePEc data check for the archive and series.
Volume 6, issue 4, 2014
- A tool for integrating time, cost and quality perspectives in Probability Impact (P-I) Tables pp. 303-318

- Selim Tugra Demir, David James Bryde, Damian John Fearon and Edward Godfrey Ochieng
- Procuring complex projects using the competitive dialogue pp. 319-335

- Mieke Hoezen, Hans Voordijk and Geert Dewulf
- Factors influencing public sector employee's intention to work on projects pp. 336-357

- Norbert Maass, Kamrul Ahsan and Simon Mowatt
- Transformation in the organisation and management of traditional contracting system in the UK pp. 358-378

- Adekunle Sabitu Oyegoke, Temidayo O. Akenroye and Michael Dickinson
- Critical chain and theory of constraints applied to yachting shipbuilding: a case study pp. 379-397

- Maurizio Bevilacqua, Filippo Emanuele Ciarapica and Giovanni Mazzuto
Volume 6, issue 3, 2014
- The effect of unlearning on organisational learning behaviour and performance in construction contracting organisations pp. 197-214

- Peter S.P. Wong, Manuel Demertjis, Mary Hardie and Chuen-yiu Lo
- Time-cost trade-offs in resource-constraint project scheduling problems with overlapping modes pp. 215-236

- François Berthaut, Robert Pellerin, Nathalie Perrier and Adnène Hajji
- Scheduling of large, complex, and constrained construction projects - an exploration of LPS application pp. 237-253

- Søren Lindhard and Søren Wandahl
- Assisting project risk management method selection pp. 254-282

- Franck Marle and Thierry Gidel
- The client's influence on collaborative and distributed project success pp. 283-301

- Mario Bourgault, Jaouad Daoudi and Nathalie Drouin
Volume 6, issue 1/2, 2014
- A structured process to managing complex interactions between project risks pp. 4-32

- Franck Marle
- Evaluating the effectiveness of task overlapping as a risk response strategy in engineering projects pp. 33-47

- Lucas Grèze, Robert Pellerin, Patrice Leclaire and Nathalie Perrier
- Fuzzy critical chain risk management for quantifying impact of variation in non-critical activity duration on project duration pp. 48-66

- Thoedtida Thipparate
- Optimal resource allocation in activity networks - stochastic environment pp. 67-95

- Salah E. Elmaghraby and Girish Ramachandra
- Lock-in risk in IT outsourcing projects: mechanism and mitigation system pp. 96-106

- Guodong Cong
- Managing rare and undetectable events in risk assessment: the case of a satellite system launch project pp. 107-120

- Cristiano Angeletti, Andrea Giacchero and Massimiliano M. Schiraldi
- Project risk management practices in the UAE construction industry pp. 121-137

- Sameh Monir El-Sayegh
- The communicative effect of risk identification on project success pp. 138-156

- Karel De Bakker, Albert Boonstra and Hans Wortmann
- A cash flow-based approach for assessing expansion options stemming from project modularity pp. 157-178

- Franco Caron and Monia Comandulli
- Assumption surfacing and monitoring as a tool in project risk management pp. 179-196

- Nils O.E. Olsson and Ingrid Spjelkavik
Volume 5, issue 4, 2013
- Towards an organisational culture - performance relationship framework in construction pp. 293-311

- Hoi-Yan Pang, Sai-On Cheung, Hoi-Yan Chan and Li-Pei Dong
- Project control mechanisms in non-project-based organisations in Asia pp. 312-333

- Prasad Gyawali, Yin Tao and Ralf Müller
- Prefabrication as an onsite productivity enhancer: analysis of impact levels of the underlying constraints and improvement measures in New Zealand construction industry pp. 334-354

- Wajiha Mohsin Shahzad and Jasper Mbachu
- Evaluating national culture from eastern and western perspectives in the context of construction pp. 355-376

- John F.Y. Yeung, Albert P.C. Chan and Patrick T.I. Lam
- An assessment of the leadership style in Malaysian construction firms pp. 377-390

- Mastura Jaafar and Cheng Chye Nee
Volume 5, issue 3, 2013
- Team integration for new project recruits: the case of heavy engineering sector pp. 177-198

- Alice M. Arandia, Edward G. Ochieng and Andrew D.F. Price
- Toward a theory for management success: the role of evidence-based management in the retail industry pp. 199-221

- Amine Ayad and Emad Rahim
- Developing systems thinking through engaging in multidisciplinary high-tech projects pp. 222-238

- Moti Frank and Sigal Kordova
- SUFFI: success and failure factors in ICT projects with Dutch case studies as examples pp. 239-264

- A.J. Van Dijk, A.S. White and R.A. Comley
- The impact of oil price fluctuation on the Singapore construction industry pp. 265-278

- Bon-Gang Hwang and Yessy Ong
- Assessment of knowledge management practices in project-oriented business pp. 279-292

- Mian M. Ajmal, Maqsood Ahmad Sandhu and Fauzia Jabeen
Volume 5, issue 1/2, 2013
- Critical success factors, opportunities and threats of the cost management profession: the case of Australasian quantity surveying firms pp. 4-24

- Marcel Frei, Jasper Mbachu and Robyn Phipps
- Five maturity pillars of a quantity surveying company pp. 25-47

- Pierre MacDonald Oosthuizen and Frank Herman Berry
- Factors that influence cost overruns in South African public sector mega-projects pp. 48-56

- Molusiwa Stephan Ramabodu and Jacobus J.P. Verster
- Construction cost performance of structural frames in Australia pp. 57-68

- Anthony Mills
- The evaluation of a web-based decision support system for healthcare project appraisal pp. 69-90

- Alaa Abdou, John Lewis and Sameera Al Zarooni
- Life cycle cost analysis on educational facilities in Japan pp. 91-110

- Kenji Kimoto, Yuri Yoshizaki and Tomoyo Ikeda
- Modelling housing affordability measurement through the incorporation of life cycle costs pp. 111-126

- Peter Smith
- Problems, preferences and processes related to dispute resolution in construction in South Africa pp. 127-144

- Jacobus J.P. Verster, Molusiwa Stephan Ramabodu and Carl H. Van Zyl
- Identification of key features that affect the efficient operation of statutory adjudication in the construction industry pp. 145-155

- Muhammad Ehsan Che Munaaim and Phillip Capper
- Knowledge sharing in construction partnering projects - redundancy, boundary objects and brokers pp. 156-175

- Christian Koch and Christian Thuesen
Volume 4, issue 4, 2012
- Embracing real outcomes to future projects: a knowledge management method for schedule development pp. 306-321

- Elena Rokou, Konstantinos Kirytopoulos and Vassilis Stavrou
- Resource-constrained scheduling of construction projects and simulation of the entropy impact on a project's duration and cost pp. 322-338

- S.E. Christodoulou, E.S. Tezias and K.A. Galaras
- The development of a robust resource constrained project scheduling framework pp. 339-367

- Qiaolin Yuan and Yiannis E. Polychronakis
- Effectiveness of risk management: barriers and solutions pp. 368-378

- Andrew Carter and Ezekiel Chinyio
- Critical success factors of risk assessment and management processes (RAMP) implementation in Ghanaian construction related organisations pp. 379-396

- Adwoa B. Yirenkyi-Fianko, Nicholas Chileshe and Paul Stephenson
- Investigation of earthmoving trucks deterioration using discriminant analysis pp. 397-413

- Marina Marinelli, Sergios Lambropoulos and John-Paris Pantouvakis
- Superintendent's leadership: a key factor in project success pp. 414-424

- William W. Badger, Avi Wiezel, Daniel M. Adams and Peter Bopp
- Generation of rework: an organisation's perspective pp. 425-431

- Sepideh Edrisi and Arun Bajracharya
Volume 4, issue 3, 2012
- Comparing project management practices in new product development: a study in the automotive, aerospace and rail transport industry pp. 203-217

- Ana K. Müller, Andreas Wald and Arnd Görner
- Performance challenges in virtual teams: a comparative case analysis pp. 218-230

- Tugrul U. Daim
- Ventures of coordinated effort pp. 231-255

- Dirk J. Pons
- Knowledge transfer in shipbuilding projects: a study of facilitating mechanisms pp. 256-271

- Hans Solli-Sæther and Jan Terje Karlsen
- Task lists as infrastructure: an empirical study of multi-project work pp. 272-285

- Tina Karrbom Gustavsson and Anna Jerbrant
- How project manager's skills may influence the development of safety climate in construction projects pp. 286-301

- Riza Yosia Sunindijo and Patrick X.W. Zou
Volume 4, issue 2, 2012
- Characteristics and techniques of successful high-technology project managers pp. 99-122

- Philip Crosby
- Construction project dispute negotiation: a conflict-trust mapping framework pp. 123-142

- Sai On Cheung, Pui Ting Chow and Wan Ching Cheng
- Exclusive project critical success processes: a cultural diversity perspective pp. 143-152

- Ofer Zwikael
- Undesirable project management practices adopted to achieve project outcomes: a case study of Vietnam pp. 153-170

- Florence Yean Yng Ling and Hoang Nga Tran
- Governance using ISO 9001:2000 challenges and barriers: empirical study applied on the Jordanian private mobile companies pp. 171-202

- Husam Abu-Khadra, Basem Barqawi and Nidal Alramahi
Volume 4, issue 1, 2012
- The effects of collaboration on performance: a multilevel validation in project teams pp. 1-37

- François Chiocchio, Simon Grenier, Thomas A. O'Neill;, Karine Savaria and J. Douglas Willms
- A concept for developing construction element cost models for German residential building projects pp. 38-53

- Christian Stoy, Spiro Pollalis and Onur Dursun
- Using the three lenses framework to observe and analyse projects pp. 54-74

- Luis Rabelo
- Design fee versus construction bid cost: a conceptual model and empirical examination pp. 75-85

- Ping Yung
- Moving to products: entrepreneurial IT firms in India pp. 86-97

- Sanjay Mohapatra and Rajeev Roy
| |