Journal of the Operational Research Society
1998 - 2017
Current editor(s): Tom Archibald and Jonathan Crook From: Palgrave Macmillan The OR Society Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing (). Access Statistics for this journal.
Is something missing from the series or not right? See the RePEc data check for the archive and series.
Volume 54, issue 12, 2003
- Obituary Stafford Beer pp. 1231-1233

- Jonathan Rosenhead
- Cost–benefit modelling for reliability growth pp. 1234-1241

- John Quigley and Lesley Walls
- Compensation differences between male and female CEOs for publicly traded firms: a nonparametric analysis pp. 1242-1248

- N Mohan and J Ruggiero
- Incorporating the potential for human error in maintenance models pp. 1249-1253

- M J Carr and A H Christer
- A new hybrid genetic algorithm for the capacitated vehicle routing problem pp. 1254-1262

- J Berger and M Barkaoui
- Minimizing maximum tardiness and number of tardy jobs on parallel machines subject to minimum flow-time pp. 1263-1274

- J N D Gupta, A J Ruiz-torres and S Webster
- New heuristic for the dynamic layout problem pp. 1275-1282

- E Erel, J B Ghosh and J T Simon
- Integrated service network design for a cross-docking supply chain network pp. 1283-1295

- C S Sung and S H Song
- A note on activity floats in activity-on-arrow networks pp. 1296-1299

- T Zhao and Tseng C-L
- The power of multi-methodology: some thoughts for John Mingers pp. 1300-1301

- Mike C Jackson
- Mingers on the classification of philosophical assumptions pp. 1301-1302

- Frank H Gregory
- Replies to Jackson and Gregory pp. 1303-1304

- John Mingers
Volume 54, issue 11, 2003
- The intellectual journey of Russell Ackoff: from OR apostle to OR apostate pp. 1127-1140

- M W Kirby
- Solving a home-care districting problem in an urban setting pp. 1141-1147

- M Blais, S D Lapierre and G Laporte
- A dynamic programming method for matching rail-track monitoring data pp. 1148-1154

- J van der Touw and A Veevers
- A two-phase multiple objective approach to university timetabling utilising optimisation and evolutionary solution methodologies pp. 1155-1166

- S K Mirrazavi, S J Mardle and M Tamiz
- When should you sack a football manager? Results from a simple model applied to the English Premiership pp. 1167-1176

- Chris Hope
- Investigating buyer and seller strategies in online auctions pp. 1177-1188

- A T Brint
- A multiple replenishment contract with ARIMA demand processes pp. 1189-1197

- Jong Soo Kim, K Y Shin and S E Ahn
- Two-resource stochastic capacity planning employing a Bayesian methodology pp. 1198-1208

- E Stavrulaki, D K H Fong and D K J Lin
- District design for arc-routing applications pp. 1209-1221

- L Muyldermans, D Cattrysse and D Van Oudheusden
- Due-date assignment with asymmetric earliness–tardiness cost pp. 1222-1224

- G Mosheiov
- Deeper complementarism: a brief response to Ulrich pp. 1225-1226

- M C Jackson
- Reply to the comments of Jackson pp. 1226-1229

- W Ulrich
Volume 54, issue 10, 2003
- Editorial pp. 1021-1021

- T M Williams and J M Wilson
- Operational Research for informed innovation: NHS Direct as a case study in the design, implementation and evaluation of a new public service pp. 1022-1028

- G Royston, J Halsall, D Halsall and C Braithwaite
- Impact of computerization on firm performance: a case of Shanghai manufacturing enterprises pp. 1029-1037

- Y C Ng and M K Chang
- A dispatching rule-based approach to production scheduling in a printed circuit board manufacturing system pp. 1038-1049

- Lee G-C, Kim Y-D, Kim J-G and Choi S-H
- Constructively simple estimating: a project management example pp. 1050-1058

- C Chapman and S Ward
- Design of manufacturing cells in the presence of alternative cell locations and material transporters pp. 1059-1075

- R Logendran and Y Karim
- A branch-and-bound-based local search method for the flow shop problem pp. 1076-1084

- M Haouari and T Ladhari
- Application of the out-of-kilter algorithm to the asymmetric traveling salesman problem pp. 1085-1092

- K Sang-Ho, G Young-Gun and K Maing-Kyu
- Dynamic pricing of inventory with cancellation demand pp. 1093-1101

- You P-S
- On ‘redundant’ constraints in Stafford's MILP model for the flowshop problem pp. 1102-1105

- E F Stafford and F T Tseng
- Professor George A Barnard, 1915–2002 pp. 1106-1107

- Dennis V Lindley
Volume 54, issue 9, 2003
- Part Special Issue Introduction: modelling organizational knowledge pp. 911-913

- H Tsoukas and N Mylonopoulos
- Belief revision and organisational knowledge dynamics pp. 914-923

- G Tselekidis, P Peppas and M-a Williams
- A market-based computational approach to collaborative organizational learning pp. 924-935

- Deng P-S and E G Tsacle
- Approaches to sharing knowledge in group problem structuring pp. 936-948

- D Shaw, F Ackermann and C Eden
- Bad numbers: coping with flawed decision support pp. 949-957

- T R Willemain, W A Wallace, K R Fleischmann, L B Waisel and S N Ganaway
- An evolutionary approach for the target allocation problem pp. 958-969

- E Erdem and N E Ozdemirel
- Binary knapsack problems with random budgets pp. 970-983

- S Das and Diptesh Ghosh
- Synchronization in supply chains: implications for design and management pp. 984-994

- M Khouja
- New reliability bounds for coherent systems pp. 995-1001

- Hsieh Y-C
- Digital contracts-driven method for pricing complex derivatives pp. 1002-1010

- Jie Lu and H Ohta
- Optimal retailer's ordering policies in the EOQ model under trade credit financing pp. 1011-1015

- Huang Y-F
Volume 54, issue 8, 2003
- Short-term electricity demand forecasting using double seasonal exponential smoothing pp. 799-805

- J W Taylor
- Algorithms for parallel machine scheduling: a case study of the tracking and data relay satellite system pp. 806-821

- S Rojanasoonthon, J F Bard and S D Reddy
- Sample selection bias in credit scoring models pp. 822-832

- J Banasik, J Crook and L Thomas
- An examination of the size of orders from customers, their characterisation and the implications for inventory control of slow moving items pp. 833-837

- F R Johnston, J E Boylan and E A Shale
- Dynamic programming in cricket: choosing a night watchman pp. 838-845

- S R Clarke and J M Norman
- Optimal two-stage ordering policy with Bayesian information updating pp. 846-859

- Choi T-M, D Li and H Yan
- Time analysis for planning a path in a time-window network pp. 860-870

- Chen Y-L, Hsiao L-J and K Tang
- A probabilistic one-centre location problem on a network pp. 871-877

- O Berman and Z Drezner
- Determining the best strategy for changing the configuration of a football team pp. 878-887

- N Hirotsu and M Wright
- Economic optimization of off-line inspection with inspection errors pp. 888-895

- S H Sheu, Y C Chen, W Y Wang and N H Shin
- Scale transitivity in the AHP pp. 896-905

- P Ji and R Jiang
- Exact solution of the generalized routing problem through graph transformations pp. 906-910

- M Blais and G Laporte
Volume 54, issue 7, 2003
- Measuring and managing educational performance pp. 679-691

- David Mayston
- Evaluating electronic workshops through analysing the ‘brainstormed’ ideas pp. 692-705

- D Shaw
- Validity in SSM: neglected areas pp. 706-712

- Ö Pala, J A M Vennix and T van Mullekom
- Mother-to-child transmission of HIV: a simulation-based approach for the evaluation of intervention strategies pp. 713-722

- I T Vieira, P R Harper, A K Shahani and V De Senna
- Resource, service quality and performance triad: a framework for measuring efficiency of banking services pp. 723-735

- A Mukherjee, P Nath and M Pal
- Simulation of single start station for Edmonton EMS pp. 736-746

- A Ingolfsson, E Erkut and S Budge
- The best banking strategy when playing The Weakest Link pp. 747-750

- L C Thomas
- A DEA study of gender equity in executive compensation pp. 751-757

- W F Bowlin, C J Renner and J M Rives
- Analysis of compatibility between interdependent matrices in ANP pp. 758-768

- L C Leung, Y V Hui and M Zheng
- The expropriation location problem pp. 769-776

- O Berman, Z Drezner and G O Wesolowsky
- An L-approach for packing (ℓ, w)-rectangles into rectangular and L-shaped pieces pp. 777-789

- L Lins, S Lins and R Morabito
- Exploration of a hybrid feature selection algorithm pp. 790-797

- Osei-Bryson K-M, K Giles and B Kositanurit
Volume 54, issue 6, 2003
- A classification of the philosophical assumptions of management science methods pp. 559-570

- J Mingers
- A priority list based heuristic for the job shop problem pp. 571-584

- P M E Shutler
- An optimal replenishment policy for items with inventory-level-dependent demand and fixed lifetime under the LIFO policy pp. 585-593

- Zhou Y-W and Yang S-L
- Unbounded knapsack problem with controllable rates: the case of a random demand for items pp. 594-604

- K Kogan
- Economic optimization in a fixed sequence of unreliable inspections pp. 605-613

- T Avinadav and T Raz
- Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms pp. 614-626

- J Alcaraz, C Maroto and R Ruiz
- Benchmarking state-of-the-art classification algorithms for credit scoring pp. 627-635

- B Baesens, T Van Gestel, Stijn Viaene, M Stepanova, J Suykens and J Vanthienen
- An inventory model with returns and lateral transshipments pp. 636-641

- Ching W-K, Yuen W-O and A W Loh
- Minimizing makespan in re-entrant permutation flow-shops pp. 642-653

- Pan Jc-H and Chen J-S
- Experimental evidence on robustness of data envelopment analysis pp. 654-660

- Don Galagedera and P Silvapulle
- Scheduling to minimize maximum earliness and number of tardy jobs where machine idle time is allowed pp. 661-664

- M Azizoglu, M Koksalan and S K Koksalan
- Comment to M Reynolds pp. 665-665

- B Lehaney and S Clarke
- Reply to B Lehaney and S Clarke pp. 665-665

- M Reynolds
- A comment on solving project-scheduling problems with a heuristic learning algorithm pp. 666-668

- M K Ahsan and D-b Tsao
- Reply to MK Ahsan and D-b Tsao pp. 668-670

- R Zamani and L-y Shue
- JORS Referees 2002 pp. 675-678

- T Williams and J Wilson
Volume 54, issue 5, 2003
- Learning from projects pp. 443-451

- T Williams
- Preference-neutral attribute weights in the journal-ranking problem pp. 452-457

- I Horowitz
- Loading aircraft for military operations pp. 458-465

- C Guéret, N Jussien, O Lhomme, C Pavageau and C Prins
- On an M/G/1 quorum queueing system under T-policy pp. 466-471

- L Tadj
- Machine assignment in a nonlinear multi-product flowline pp. 472-489

- A Diponegoro and B R Sarker
- An effective heuristic for the CLSP with set-up times pp. 490-498

- K S Hindi, K Fleszar and C Charalambous
- Batch scheduling with controllable setup and processing times to minimize total completion time pp. 499-506

- C T Daniel Ng, T C E Cheng and M Y Kovalyov
- Performance metrics in supply chain management pp. 507-514

- Jack Kleijnen and M T Smits
- Cost analysis of the unloader queueing system with a single unloader subject to breakdowns pp. 515-520

- Wang K-H, Chiang Y-C and Ke J-C
- Measuring the performance of ethical mutual funds: a DEA approach pp. 521-531

- Antonella Basso and Stefania Funari
- Transitive approximation to pairwise comparison matrices by using interval goal programming pp. 532-538

- J González-Pachón, M I Rodríguez-Galiano and C Romero
- Loans, ordering and shortage costs in start-ups: a dynamic stochastic decision approach pp. 539-548

- E Possani, L C Thomas and T W Archibald
- An EOQ model with process reliability considerations pp. 549-554

- P K Tripathy, Wee W-M and P R Majhi
- A new method for measuring the static complexity in manufacturing pp. 555-557

- A Makui and M B Aryanezhad
- Reply to A Makui pp. 557-558

- J Efstathiou and A Calinescu
Volume 54, issue 4, 2003
- Beyond methodology choice: critical systems thinking as critically systemic discourse pp. 325-342

- W Ulrich
- Analysing maintenance data to gain insight into systems performance pp. 343-349

- J Ansell, T Archibald, J Dagpunar, L Thomas, P Abell and D Duncalf
- Tuning inventory policy parameters in a small chemical company pp. 350-361

- R García-Flores, X Z Wang and T F Burgess
- Minimising total average cycle stock subject to practical constraints pp. 362-370

- A Billionnet
- A fully subjective approach to capital equipment replacement pp. 371-378

- S Apeland and P A Scarf
- Generalised ‘join the shortest queue’ policies for the dynamic routing of jobs to multi-class queues pp. 379-389

- P S Ansell, K D Glazebrook and C Kirkbride
- Exact and heuristic methods for a full-load, multi-terminal, vehicle scheduling problem with backhauling and time windows pp. 390-400

- R H Currie and S Salhi
- Optimal routing in non-geostationary satellite ATM networks with intersatellite link capacity constraints pp. 401-409

- H Lee, D H Ahn and S Kim
- Workforce cross-training decisions in field service systems with two job types pp. 410-418

- S R Agnihothri, A K Mishra and D E Simmons
- A distributed global optimization method for packing problems pp. 419-425

- Li H-L, Tsai J-F and Hu N-Z
- Costing communication standards in information systems using a minimum cut approach pp. 426-431

- A Kimms
- On an EOQ model for deteriorating items with time-varying demand and partial backlogging pp. 432-436

- Teng J-T, Yang H-L and Ouyang L-Y
- Scheduling unit processing time jobs on an m-machine flow-shop pp. 437-441

- G Mosheiov
Volume 54, issue 3, 2003
- The professional foul in football: Tactics and deterrents pp. 213-221

- M Wright and N Hirotsu
- Using system dynamics to analyse disruption and delay in complex projects for litigation: can the modelling purposes be met? pp. 222-229

- S Howick
- A column generation approach for the timetabling problem of Greek high schools pp. 230-238

- K Papoutsis, C Valouxis and E Housos
- The idea of emergent property pp. 239-247

- I Georgiou
- A genetic algorithm approach on tree-like telecommunication network design problem pp. 248-254

- G Zhou and M Gen
- Kriging for interpolation in random simulation pp. 255-262

- W C M van Beers and Jack Kleijnen
- Trade-off between inventory and repair capacity in spare part networks pp. 263-272

- A Sleptchenko, M C van der Heijden and A van Harten
- Modelling condition monitoring intervals: A hybrid of simulation and analytical approaches pp. 273-282

- W Wang
- Can-order policy for the periodic-review joint replenishment problem pp. 283-290

- S G Johansen and P Melchiors
- A higher-order Markov model for the Newsboy's problem pp. 291-298

- W K Ching, E S Fung and M K Ng
- Wait or buy? The strategic consumer: Pricing and profit implications pp. 299-306

- C K Anderson and J G Wilson
- Forecasting and recombining time-series components by using neural networks pp. 307-317

- J V Hansen and R D Nelson
- How much should we reweigh? pp. 318-321

- H Sandoh and T Nakagawa
- Taket's suggestions for the OR toolkit pp. 322-323

- R J Ormerod
- Reply to Ormerod pp. 324-324

- A Taket
Volume 54, issue 2, 2003
- Editorial pp. 117-118

- John S Edwards and Elayne Coakes
- Team-based reconstruction for expanding organisational ability pp. 119-129

- M Lind and U Seigerroth
- Knowledge management sans frontières pp. 130-139

- J S Edwards and J B Kidd
- It's tacit knowledge but not as we know it: redirecting the search for knowledge pp. 140-152

- N A D Connell, J H Klein and P L Powell
- Dynamics of human resource and knowledge management pp. 153-164

- K Hafeez and H Abdelmeguid
- Evaluating performance of public–private research collaborations: A DEA analysis pp. 165-174

- E Revilla, J Sarkis and A Modrego
- Knowledge supply network pp. 175-183

- Mak K-T and A Ramaprasad
- Codifying or enabling: the challenge of knowledge management systems pp. 184-193

- H Hasan and K Crawford
- Operational knowledge management: identification of knowledge objects, operation methods, and goals and means for the support function pp. 194-203

- F Wijnhoven
- Process-oriented knowledge management: a case study pp. 204-211

- M M Kwan and P Balasubramanian
Volume 54, issue 1, 2003
- Editorial pp. 1-1

- Terry Williams and John Wilson
- Use of business process simulation: A survey of practitioners pp. 2-10

- N Melão and M Pidd
- A large-scale application of the partial coverage uncapacitated facility location problem pp. 11-20

- F J Vasko, D D Newhart, K L Stott and F E Wolf
- An algorithm to locate perinatal facilities in the municipality of Rio de Janeiro pp. 21-31

- B Boffey, D Yates and R D Galvão
- Effect of coordinated replenishment policies on quality pp. 32-39

- S A Starbird
- An optimal maintenance policy for skipping imminent preventive maintenance for systems experiencing random failures pp. 40-47

- A H Shirmohammadi, C E Love and Z G Zhang
- Financial statement analysis: A data envelopment analysis approach pp. 48-58

- Ehsan Feroz, S Kim and R L Raab
- The single-assignment hub covering problem: Models and linearizations pp. 59-64

- B Y Kara and B C Tansel
- A list based threshold accepting metaheuristic for the heterogeneous fixed fleet vehicle routing problem pp. 65-71

- C D Tarantilis, C T Kiranoudis and V S Vassiliadis
- Branch-and-price algorithm for a combined problem of virtual path establishment and traffic packet routing in a layered communication network pp. 72-82

- C S Sung and S H Song
- Simple expressions for finding recovery system inventory control parameter values pp. 83-88

- G P Kiesmüller and Stefan Minner
- On the design of lottery games pp. 89-100

- R Hartley and Gauthier Lanot
- Equivalent standard DEA models to provide super-efficiency scores pp. 101-108

- C. Lovell and A P B Rouse
- Optimality and robustness of combinations of moving averages pp. 109-115

- J E Boylan and F R Johnston
| |