Construction Management and Economics
1997 - 2025
Current editor(s): Will Hughes From Taylor & Francis Journals Bibliographic data for series maintained by Chris Longhurst (). Access Statistics for this journal.
Is something missing from the series or not right? See the RePEc data check for the archive and series.
Volume 20, issue 8, 2002
- Editorial pp. 651-653

- The Editors
- The effect of experience on contractors' competitiveness in recurrent bidding pp. 655-666

- W. K. Fu, Derek S. Drew and H. P. Lo
- Simulation-based methodology for project scheduling pp. 667-678

- H. Zhang, C. M. Tam and Jonathan J. Shi
- Key considerations for developing corporate and operational approaches for managing the small building works portfolio of large client organizations pp. 679-687

- Alan Griffith
- Constructability rules: guidelines for successful application to bespoke buildings pp. 689-696

- Stephen Fox, Laurence Marsh and Graham Cockerham
- Perceptions of gender roles and attitudes toward work among male and female operatives in the Scottish construction industry pp. 697-705

- Andrew Agapiou
- Relationship marketing: a survey of QS firms in Singapore pp. 707-721

- Low Sui Pheng and Tan Sui Ling Gracia
- Book reviews pp. 723-728

- The Editors
- Forthcoming events pp. 743-743

- The Editors
Volume 20, issue 7, 2002
- Measuring the global construction industry: improving the quality of data pp. 553-556

- Les Ruddock
- A multi-attribute utility model for dispute resolution strategy selection pp. 557-568

- Sai-On Cheung and Henry Suen
- Multi-criteria evaluation model for the selection of architectural consultants pp. 569-580

- Franco Cheung, Judy Leung Fung Kuen and Martin Skitmore
- Predicting downtime costs of tracked hydraulic excavators operating in the UK opencast mining industry pp. 581-591

- David Edwards, Gary Holt and Frank Harris
- Construction and economic development in selected LDCs: past, present and future pp. 593-599

- Willie Tan
- The factors influencing bid mark-up decisions of large- and medium-size contractors in Singapore pp. 601-610

- Mohammed Fadhil Dulaimi and Hon Guo Shan
- Developing an optimal bidding strategy in two-envelope fee bidding pp. 611-620

- Derek Drew, L. Y. Shen and Patrick Zou
- The construction industry as a loosely coupled system: implications for productivity and innovation pp. 621-631

- Anna Dubois and Lars-Erik Gadde
- A Dutch public-private strategy for innovation in sustainable construction pp. 633-642

- Bart Bossink
Volume 20, issue 6, 2002
- Data modelling and the application of a neural network approach to the prediction of total construction costs pp. 465-472

- Margaret Emsley, David Lowe, A. Roy Duff, Anthony Harding and Adam Hickson
- A theoretical framework for determining the minimum number of bidders in construction bidding competitions pp. 473-482

- Stephen Ngai, Derek Drew, H. P. Lo and Martin Skitmore
- Three methods for verifying and validating the simulation of a construction operation pp. 483-491

- Jonathan Jingsheng Shi
- Generic and specific IT training: a process protocol model for construction pp. 493-505

- J. S. Goulding and M. Alshawi
- The impact of job and organizational demands on marital or relationship satisfaction and conflict among Australian civil engineers pp. 507-521

- Helen Lingard and Anna Sublet
- Responses of selected economic indicators to construction output shocks: the case of Singapore pp. 523-533

- Swee-Lean Chan
- Simulation optimization for earthmoving operations using genetic algorithms pp. 535-543

- Mohamed Marzouk and Osama Moselhi
Volume 20, issue 5, 2002
- Supporting the decision-making process for sustainable housing pp. 387-390

- Helen Li and Qiping Shen
- Scheduling of deconstruction projects under resource constraints pp. 391-401

- Frank Schultmann and Otto Rentz
- Preparations for ISO 9001:2000 - a study of ISO 9000:1994 certified construction firms pp. 403-413

- Low Sui Pheng and Edwi Fong
- The divergence in aggregate and activity estimates of US construction productivity pp. 415-423

- Paul Goodrum, Carl Haas and Robert Glover
- The performance of contractors in Japan, the UK and the USA: a comparative evaluation of construction cost pp. 425-435

- Hong Xiao and David Proverbs
- Corporate growth of engineering consulting firms: a European review pp. 437-448

- Gerhard Kreitl, Gerhard Urschitz and Wolfgang Oberndorfer
- Women's experiences of non-traditional employment: is gender equality in this area a possibility? pp. 449-456

- Margaret Whittock
Volume 20, issue 4, 2002
- Deterioration patterns of building cladding components for maintenance management pp. 305-314

- I. M. Shohet, M. Puterman and E. Gilboa
- An assessment of the applicability of partnering in the Turkish construction sector pp. 315-321

- Sevda Koraltan and Attila Dikbas
- Resource constrained project scheduling using simulation pp. 323-330

- Mohammad Ammar and Youssef Mohieldin
- Antecedents and consequences of market orientation in chartered surveying firms pp. 331-341

- Linda Tay and Neil Morgan
- A real options approach to valuing strategic flexibility in uncertain construction projects pp. 343-351

- David Ford, Diane Lander and John Voyer
- Scheduling system for high rise building construction pp. 353-364

- David Arditi, Pirasak Sikangwan and Onur Tokdemir
- The effect of attitudinal differences on interface conflicts in large scale construction projects: a case study pp. 365-377

- Prapatpaow Awakul and Stephen Ogunlana
Volume 20, issue 3, 2002
- An object-oriented model for planning and control of housing construction pp. 201-210

- Khaled El-Rayes, Ramaneetharan Ramanathan and Osama Moselhi
- Assessing contractor quality performance pp. 211-223

- Firuzan Yasamis, David Arditi and Jamshid Mohammadi
- Predicting completed project cost using bidding data pp. 225-235

- Trefor Williams
- Measurement of the performance of ready mixed concreting resources as data for system simulation pp. 237-250

- M. Anson, S. L. Tang and K. C. Ying
- Probability distributions of facilities management costs for whole life cycle costing in acute care NHS hospital buildings pp. 251-261

- Richard Kirkham, A. Halim Boussabaine and Belal Awwad
- The effect of first aid training on Australian construction workers' occupational health and safety knowledge and motivation to avoid work-related injury or illness pp. 263-273

- Helen Lingard
- Rethinking the multi-attribute utility approach based procurement route selection technique pp. 275-284

- Chen-Yu Chang and Graham Ive
- Fuzzy membership functions of procurement selection criteria pp. 285-296

- S. Thomas Ng, Duc Thanh Luu, Swee Eng Chen and Ka Chi Lam
Volume 20, issue 2, 2002
- Market strategies and core capabilities in the building industry pp. 109-118

- Job De Haan, Hans Voordijk and Geert-Jan Joosten
- Time to build options in construction processes pp. 119-130

- Tien Foo Sing
- A genetic algorithm-based optimal resource-constrained scheduling simulation model pp. 131-141

- Sou-Sen Leu and Tzung-Heng Hung
- An option pricing-based model for evaluating the financial viability of privatized infrastructure projects pp. 143-156

- S. Ping Ho and Liang Liu
- Correcting the fee-technical score variability imbalance in two-envelope fee tendering pp. 157-166

- Derek Drew, Po Yin Lai, Heng Li and H. P. Lo
- In search of 'project chemistry' pp. 167-177

- Davide Nicolini
- A process approach in measuring quality costs of construction projects: model development pp. 179-192

- Raymond Aoieong, S. L. Tang and Syed Ahmed
Volume 20, issue 1, 2002
- The evidence of complex variability in construction labour productivity pp. 3-12

- Milan Radosavljevic, R. Malcolm and W. Horner
- Construction related factors influencing the choice of concrete floor systems pp. 13-19

- A. B. Idrus and J. B. Newman
- 'Green procurement' of buildings: a study of Swedish clients' considerations pp. 21-30

- Eva Sterner
- Project understanding, planning, flexibility of management action and construction time performance: two Australian case studies pp. 31-44

- Derek Walker and Yue Shen
- Joint risk management through transactionally efficient relational contracting pp. 45-54

- M. Motiar Rahman and Mohan Kumaraswamy
- An efficient search procedure for the resource-constrained multi-project scheduling problem with discounted cash flows pp. 55-66

- Huan Neng Chiu and Deng Maw Tsai
- Developing a tendering strategy in two-envelope fee tendering based on technical score-fee variability pp. 67-81

- Derek Drew, Sandy Tang and H. P. Lo
- Raftery curve construction for tender price forecasts pp. 83-89

- Martin Skitmore
- Racial discrimination towards Asian operatives in the Australian construction industry pp. 91-102

- M. Loosemore and D. W. Chau
- Book reviews pp. 103-104

- Graham Winch
| |