Construction Management and Economics
1997 - 2025
Current editor(s): Will Hughes From Taylor & Francis Journals Bibliographic data for series maintained by Chris Longhurst (). Access Statistics for this journal.
Is something missing from the series or not right? See the RePEc data check for the archive and series.
Volume 26, issue 12, 2008
- The accuracy of pre-tender building cost estimates in Australia pp. 1257-1269

- Ajibade Ayodeji Aibinu and Thomas Pasco
- Behaviour of quantity surveyors as organizational citizens pp. 1271-1282

- Anita Liu and Richard Fellows
- A simplified unbalanced bidding model pp. 1283-1290

- David Cattell, Paul Anthony Bowen and Ammar Kaka
- A bid-unbalancing method for lowering a contractor's financial risk pp. 1291-1302

- Symeon Christodoulou
- Managing construction project change: a knowledge management perspective pp. 1303-1311

- Sepani Senaratne and Martin Sexton
- A construction quality index for highway construction pp. 1313-1324

- R. Edward Minchin, Michael Hammons and Junyong Ahn
Volume 26, issue 11, 2008
- Understanding employee resourcing in construction organizations pp. 1133-1143

- Ani Birgit Raiden, Andrew Dainty and Richard Neale
- Perceptions of architectural design and project risk: understanding the architects' role in a PPP project pp. 1145-1157

- Peter Raisbeck
- Health and safety management in developing countries: a study of construction SMEs in Ghana pp. 1159-1169

- Nongiba Kheni, Andy Dainty and Alistair Gibb
- The option value of government guarantees in infrastructure projects pp. 1171-1180

- Luiz Eduardo Brandao and Eduardo Saraiva
- Analysing the novated design and construct contract from the client's, design team's and contractor's perspectives pp. 1181-1196

- Hemanta Doloi
- Integrating system dynamics and fuzzy logic modelling for construction risk management pp. 1197-1212

- Farnad Nasirzadeh, Abbas Afshar, Mostafa Khanzadi and Susan Howick
- A new way of developing semantic differential scales with personal construct theory pp. 1213-1226

- Zhikun Ding and Fungfai Ng
- An input-output analysis of Thailand's construction sector pp. 1227-1240

- Oyeshola Kofoworola and Shabbir Gheewala
- Tools for selecting appropriate risk management techniques in the built environment pp. 1241-1250

- Doug Forbes, Simon Smith and Malcolm Horner
Volume 26, issue 10, 2008
- Toward collective organizational values: a case study in UK construction pp. 1009-1028

- Xiaoxing Zhang, Simon Austin, Jacqueline Glass and Grant Mills
- Implementing innovation in construction: contexts, relative boundedness and actor-network theory pp. 1029-1041

- Chris Harty
- Tales of the expected: investigating the rhetorical strategies of innovation champions pp. 1043-1054

- Roine Leiringer and Paula Cardellino
- Obstacles to diversity in construction: the example of Heathrow Terminal 5 pp. 1055-1065

- Linda Clarke and Maria Gribling
- Maintenance cost implications of utilizing bathroom modules manufactured offsite pp. 1067-1077

- Wei Pan, Alistair Gibb and Andrew Sellars
- Negotiation-based decision support model for utility relocations in transportation infrastructure projects pp. 1079-1090

- Carlos Caldas, Chien-Cheng Chou and Jim O'connor
- Applicability of lean principles and practices in industrialized housing production pp. 1091-1100

- Matilda Hook and Lars Stehn
- Alternative work schedule interventions in the Australian construction industry: a comparative case study analysis pp. 1101-1112

- Helen Clare Lingard, Keith Townsend, Lisa Bradley and Kerry Brown
- Handling construction pollutions using multi-objective optimization pp. 1113-1125

- Mohamed Marzouk, Magdy Madany, Azza Abou-Zied and Moheeb El-said
Volume 26, issue 9, 2008
- Planning tools for integrating health and safety in construction pp. 899-909

- Iain Cameron and Billy Hare
- How contractors price risk in bids: theory and practice pp. 911-924

- Samuel Laryea and Will Hughes
- Variance models for project financial risk analysis with applications to greenfield BOT highway projects pp. 925-939

- Nicola Chiara and Michael Garvin
- The role of social capital in knowledge sharing: the case of a specialist rock construction company pp. 941-951

- Alexander Styhre
- Sustainable construction aspects of using prefabrication in dense urban environment: a Hong Kong case study pp. 953-966

- Lara Jaillon and C. S. Poon
- The pricing of conditional performance guarantees with risky collateral pp. 967-978

- Yu-Lin Huang
- Valuation of strategic network flexibility in development of toll road projects pp. 979-990

- Ivan Damnjanovic, Jennifer Duthie and S. Travis Waller
- Using the IKEA model and virtual prototyping technology to improve construction process management pp. 991-1000

- Heng Li, Hongling Guo, Miroslaw Skibniewski and Martin Skitmore
Volume 26, issue 8, 2008
- First and second price independent values sealed bid procurement auctions: some scalar equilibrium results pp. 787-803

- Martin Skitmore
- Case-based allocation of onsite supervisory manpower for construction projects pp. 805-814

- Jieh-Haur Chen, Li-Ren Yang, W. H. Chen and C. K. Chang
- Construction and economic development: the case of Hong Kong pp. 815-826

- James Wong, Y. H. Chiang and Thomas Ng
- HIV/AIDS in the South African construction industry: an empirical study pp. 827-839

- Paul Bowen, Rob Dorrington, Greg Distiller, Harry Lake and Sarika Besesar
- Application of AHP in improving construction productivity from a management perspective pp. 841-854

- Hemanta Doloi
- Impact of pre-construction planning and project characteristics on performance in the US electrical construction industry pp. 855-869

- Cindy Menches, Awad Hanna, Erik Nordheim and Jeffrey Russell
- Coping strategies as moderators in the relationship between role overload and burnout pp. 871-882

- Brenda Yip, Steve Rowlinson and Oi Ling Siu
- Decision support method for multi-criteria selection of bridge rehabilitation strategy pp. 883-893

- Saleh Abu Dabous and Sabah Alkass
Volume 26, issue 7, 2008
- Time-cost optimization: using GA and fuzzy sets theory for uncertainties in cost pp. 679-691

- Ehsan Eshtehardian, Abbas Afshar and Reza Abbasnia
- The compilation methods of building price indices in Britain: a critical review pp. 693-705

- Marco Yu and Graham Ive
- Interpreting risk allocation mechanism in public-private partnership projects: an empirical study in a transaction cost economics perspective pp. 707-721

- Xiao-Hua Jin and Hemanta Doloi
- Supervising for quality: an empirical examination of institutional arrangements in China's construction industry pp. 723-737

- Ping Yung and Lawrence Wai Chung Lai
- Where to submit? Journal choice by construction management authors pp. 739-749

- Jan Brochner and Bo-Christer Bjork
- Public-private partnership projects in Greece: risk ranking and preferred risk allocation pp. 751-763

- Athena Roumboutsos and Konstantinos Anagnostopoulos
- Job satisfaction of South African quantity surveyors: an empirical study pp. 765-780

- Paul Bowen, Keith Cattell, Greg Distiller and Peter Edwards
Volume 26, issue 6, 2008
- Editorial: stakeholder management in construction pp. 549-552

- Brian Atkin and Martin Skitmore
- A comparative study of factors affecting the external stakeholder management process pp. 553-561

- Stefan Olander and Anne Landin
- Stakeholders and uncertainty management in projects pp. 563-577

- Stephen Ward and Chris Chapman
- Stakeholder perception of construction site managers' effectiveness pp. 579-590

- Campbell Fraser and Chunxue Zhu
- Practical approaches for engaging stakeholders: findings from the UK pp. 591-599

- Ezekiel Chinyio and Akintola Akintoye
- Conceptualizing stakeholder engagement in the context of sustainability and its assessment pp. 601-609

- Vivek Narain Mathur, Andrew Price and Simon Austin
- Stakeholder management through empowerment: modelling project success pp. 611-623

- Steve Rowlinson and Yan Ki Fiona Cheung
- Stakeholder matrix for ethical relationships in the construction industry pp. 625-632

- Krisen Moodley, Nigel Smith and Christopher Nigel Preece
- The credibility gap in stakeholder management: ethics and evidence of relationship management pp. 633-643

- Hedley Smyth
- Influence, stakeholder mapping and visualization pp. 645-658

- Derek Walker, Lynda Margaret Bourne and Arthur Shelley
- Developing and implementing a balanced incentive and risk sharing contract pp. 659-669

- Chris Chapman and Stephen Ward
Volume 26, issue 5, 2008
- A compromise programming model for site selection of borrow pits pp. 433-446

- John-Paris Pantouvakis and Odysseus George Manoliadis
- MBNQA-oriented self-assessment quality management system for contractors: fuzzy AHP approach pp. 447-461

- Ka-Chi Lam, Mike Chun-Kit Lam and Dan Wang
- Project competition intensity (PCI) in the construction market: a case study in China pp. 463-470

- Kunhui Ye, Weiyan Jiang and Liyin Shen
- Conceptual framework for the assessment of subcontractors' eligibility and performance in the construction industry pp. 471-484

- Jasper Mbachu
- The state of applications of quantitative analysis techniques to construction economics and management (1983 to 2006) pp. 485-497

- Goh Bee Hua
- Construction linkages in a developing economy: the case of Sri Lanka pp. 499-506

- Raufdeen Rameezdeen and Thanuja Ramachandra
- Minimum performance bounds for evaluating contractors performance during construction of highway pavement projects pp. 507-529

- Ahmed M. Abdel Aziz
- A quasi-experimental evaluation of partnering pp. 531-541

- Johan Nystrom
Volume 26, issue 4, 2008
- Modelling the risks faced by Indian construction companies assessing international projects pp. 337-348

- Kumar Neeraj Jha and M. N. Devaya
- A study of clients' and estimators' tolerance towards estimating errors pp. 349-362

- Franco Cheung, Margie Wong and Martin Skitmore
- A case-based reasoning approach to application of value engineering methodology in the construction industry pp. 363-372

- Nader Naderpajouh and Abbas Afshar
- Performance measurement of construction firms in developing countries pp. 373-386

- Truong-Van Luu, Soo-Yong Kim, Huu-Loi Cao and Young-Min Park
- The impacts of change management practices on project change cost performance pp. 387-393

- Yi Zou and Sang-Hoon Lee
- Problems causing delays in major construction projects in Thailand pp. 395-408

- Shamas-Ur-Rehman Toor and Stephen Ogunlana
- Measuring effectiveness of safety programmes in the Thai construction industry pp. 409-421

- Thanet Aksorn and Bonaventura Hadikusumo
Volume 26, issue 3, 2008
- Distilling and managing engineers' experience in construction projects using a pattern approach pp. 209-223

- Chin-Hsiang Chang, Yu-Cheng Lin and H. Ping Tserng
- Are Chinese contractors competitive in international markets? pp. 225-236

- Zhen Yu Zhao and Li Yin Shen
- Organizational culture and TQM implementation in construction firms in Singapore pp. 237-248

- Koh Tas Yong and Low Sui Pheng
- Delineating the predominant criteria for subcontractor appraisal and their latent relationships pp. 249-259

- S. Thomas Ng and Ziwei Tang
- Sustainable construction management: introduction of the operational context space (OCS) pp. 261-275

- Mohamed Matar, Maged Georgy and Moheeb Elsaid Ibrahim
- Establishing quantitative indicators for measuring the partnering performance of construction projects in Hong Kong pp. 277-301

- John Yeung, Albert Chan and Daniel Chan
- Entry mode selection for international construction markets: the influence of host country related factors pp. 303-314

- Chuan Chen
- Is construction different? A comparison of perceptions of project management performance and practices by business sector and project type pp. 315-327

- David James Bryde
Volume 26, issue 2, 2008
- The development of corporate social responsibility in the Australian construction industry pp. 93-101

- Sonja Petrovic-Lazarevic
- The informal construction sector and the inefficiency of low cost housing markets pp. 103-113

- Gonzalo Lizarralde and David Root
- Integrating grey number and Minkowski distance function into grey relational analysis technique to improve the decision quality under uncertain information pp. 115-123

- Yong-Huang Lin, Pin-Chan Lee and Ta-Peng Chang
- Genderlect and conflict in the Australian construction industry pp. 125-135

- Martin Loosemore and Natalie Galea
- Mitigating contractual hazards in public procurement: a study of Swedish local authorities pp. 137-145

- Fredrik Waara
- Reliability of building embodied energy modelling: an analysis of 30 Melbourne case studies pp. 147-160

- Yu Lay Langston and Craig Ashley Langston
- Volume building as competitive strategy pp. 161-176

- Yat-Hung Chiang, Bo-Sin Tang and Francis Wong
- Development of a benchmarking framework for pharmaceutical capital projects pp. 177-195

- Bon-Gang Hwang, Stephen Thomas, Deborah Degezelle and Carlos Caldas
Volume 26, issue 1, 2008
- Coordination and control in emerging international construction firms pp. 3-13

- Joao Neves and Antonio Bugalho
- Conceptual delay mitigation model using a project learning approach in practice pp. 15-27

- Hamzah Abdul-Rahman, Imran Ariff Yahya, Mohammed Ali Berawi and Low Wai Wah
- The Coase Theorem and a Coasian construction economics and management research agenda pp. 29-46

- Lawrence Wai Chung Lai, Felicity Wai Ngar Ng and Ping Yung
- An analysis of infrastructure development based on national competitiveness perspectives pp. 47-61

- Ren-Jye Dzeng and Shyh-Shiuh Wang
- Competitive strategy revisited: contested concepts and dynamic capabilities pp. 63-78

- Stuart Green, Graeme Larsen and Chung-Chin Kao
- Explosive construction in a micro-state: environmental limit and the Bon curve: evidence from North Cyprus pp. 79-88

- Ozay Mehmet and Vedat Yorucu
| |