International Journal of Production Economics
1991 - 2025
Continuation of Engineering Costs and Production Economics. Current editor(s): Stefan Minner From Elsevier Bibliographic data for series maintained by Catherine Liu (). Access Statistics for this journal.
Is something missing from the series or not right? See the RePEc data check for the archive and series.
Volume 58, issue 3, 1999
- Optimal two-stage lot sizing and inventory batching policies pp. 221-234

- DaeSoo Kim
- Capital budgeting under uncertainty: An extended goal programming approach pp. 235-251

- Timothy Ch. U. Kalu
- A mathematical programming approach to evaluating alternative machine clusters in cellular manufacturing pp. 253-264

- Victor L. Berardi, Guoqiang Zhang and O. Felix Offodile
- Explaining beer demand: A residual modeling regression approach using statistical process control pp. 265-276

- Murat Koksalan, Nesim Erkip and Herbert Moskowitz
- Cement transportation planning via fuzzy linear programming pp. 277-287

- Li-Hsing Shih
- Application of discrete event simulation to the activity based costing of manufacturing systems pp. 289-301

- T. A. Spedding and G. Q. Sun
- Analysing interaction effects on MRP implementation using ACE pp. 303-318

- Chee-Chuong Sum, Ser-Aik Quek and Hoon-Eng Lim
- A pragmatic view on process capability studies pp. 319-330

- Mats Deleryd
Volume 58, issue 2, 1999
- A hierarchical planning system for energy intensive production environments pp. 115-129

- Linet Ozdamar and Sevket Ilker Birbil
- An analysis of the inventory behavior in a q-theoretic framework pp. 131-146

- Alessandra Guariglia
- The performance of two popular service measures on management effectiveness in inventory control pp. 147-158

- Amy Zhaohui Zeng and Jack C. Hayya
- Cost and performance analysis of a robotic rework cell pp. 159-172

- Necdet Geren and Alan Redford
- Lot-bucket MRP pp. 173-181

- Rommert J. Casimir
- An optimal production run length in deteriorating production processes pp. 183-189

- Chang Hyun Kim and Yushin Hong
- A new line remedial policy for the paced lines with stochastic task times pp. 191-197

- Hadi Gokcen and O. Faruk Baykoc
- Determining safety stocks for production planning in uncertain manufacturing pp. 199-208

- Yi-Feng Hung and Ching-Bin Chang
- JIT production planning approach with fuzzy due date for OKP manufacturing systems pp. 209-215

- Wei Wang, Dingwei Wang and W. H. Ip
Volume 58, issue 1, 1999
- Manufacturing systems with machine vacations, arbitrary topology and finite buffers pp. 1-15

- Ayse Kavusturucu and Surendra M. Gupta
- Statistical dependence in risk analysis for project networks using Monte Carlo methods pp. 17-29

- J. R. van Dorp and M. R. Duffey
- A fuzzy decision model for color reproduction pp. 31-37

- Cecilia Temponi, Farid Derisavi Fard and H. W. Corley
- An EOQ lot sizing model with random supplier capacity pp. 39-47

- Moncer Hariga and Mohamed Haouari
- Comparison of several heuristics using an analytic procedure for replenishment with non-linear increasing demand pp. 49-55

- J. Yang, G. Q. Zhao and G. K. Rand
- Consolidating distribution centers can reduce lost sales pp. 57-61

- Robert Bordley, Mark Beltramo and Dennis Blumenfeld
- Networked manufacturing:: The impact of information sharing pp. 63-79

- Sophie D'Amours, Benoit Montreuil, Pierre Lefrancois and Francois Soumis
- An integrated production-distribution model for a multi-national company operating under varying exchange rates pp. 81-92

- Zubair M. Mohamed
- A lost-sales continuous-review inventory system with emergency ordering pp. 93-112

- Esmail Mohebbi and Morton J. M. Posner
Volume 55, issue 3, 1998
- Applying the lessons learned from 27 lean manufacturers.: The relevance of relationships management pp. 223-240

- Roberto Panizzolo
- Product costing for complex manufacturing systems pp. 241-255

- Arnick N. A. M. Boons
- Optimal continuous review policies for spare part provisioning with random lead times pp. 257-271

- Takeshi Shibuya, Tadashi Dohi and Shunji Osaki
- Minimizing mean flow times criteria on a single batch processing machine with non-identical jobs sizes pp. 273-280

- Fariborz Jolai Ghazvini and Lionel Dupont
- Supply chain design and analysis:: Models and methods pp. 281-294

- Benita M. Beamon
- Advanced manufacturing technology selection:A strategic model for learning and evaluation pp. 295-307

- R. P. Mohanty and S. G. Deshmukh
- The design of quality systems: A contingency approach pp. 309-319

- J. D. van der Bij and H. Broekhuis
- A new pragmatic approach to capital investment appraisal: The financial appraisal profile (FAP) model pp. 321-341

- Frank Lefley and Malcolm Morgan
Volume 55, issue 2, 1998
- A quantitative approach to estimate the size of the time buffer in the theory of constraints pp. 113-119

- Zinovy D. Radovilsky
- The management and organisational context of new product development: Diagnosis and self-assessment pp. 121-131

- R. E. McQuater, A. J. Peters, B. G. Dale, M. Spring, J. H. Rogerson and E. M. Rooney
- The impact of parameters setting in load oriented manufacturing control pp. 133-142

- Marco Perona and Alberto Portioli
- A note on the convexity of the objective function for a simple common component inventory problem pp. 143-148

- Haizhen Fu and Duncan K. H. Fong
- A heuristic for network project scheduling with random activity durations depending on the resource allocation pp. 149-162

- Dimitri Golenko-Ginzburg and Aharon Gonik
- Tardiness minimization on parallel machines pp. 163-168

- Meral Azizoglu and Omer Kirca
- A heuristic to minimize a quadratic function of job lateness on a single machine pp. 169-175

- Ling-Huey Su and Pei-Chann Chang
- Optimal design of a generalized conveyor-serviced production station: Fixed and removal item cases pp. 177-189

- S. A. Feyzbakhsh, M. Matsui and K. Itai
- Imperfect maintenance policies for deteriorating production systems pp. 191-201

- Sheng-Tsaing Tseng, Ruey Huei Yeh and Wen-Tsung Ho
- Simulation modelling and analysis of a JIT production system pp. 203-212

- Omer Faruk Baykoc and Serpil Erol
- One machine scheduling to minimize the maximum earliness with minimum number of tardy jobs pp. 213-219

- Ertan Guner, Serpil Erol and Kazuo Tani
Volume 55, issue 1, 1998
- TQM impact on quality conformance and customer satisfaction: A causal model pp. 1-20

- Cipriano Forza and Roberto Filippini
- An inventory model for deteriorating items with time-proportional demand and shortages under inflation and time discounting pp. 21-30

- Jen-Ming Chen
- Demand promotion by upgradation under stock-dependent demand situation - a model pp. 31-38

- T. K. Datta, K. Paul and A. K. Pal
- Optimal development of production technology when autonomous and induced learning are present pp. 39-52

- Bowon Kim
- An exact algorithm for batching and scheduling two part types in a mixed shop: A technical note pp. 53-56

- T. C. Edwin Cheng and Mikhail Y. Kovalyov
- Decision models for single-period products with two ordering opportunities pp. 57-70

- Amy Hing-Ling Lau and Hon-Shiang Lau
- A study on production lines with discrete batch WIP inventory transfer pp. 71-85

- Erdal Erel
- Stochastic linear optimisation of an MPMP production planning model pp. 87-96

- M. Akif Bakir and Mike D. Byrne
- Post design modeling for cellular manufacturing system with cost uncertainty pp. 97-109

- Ravi Shanker and Prem Vrat
| |