International Journal of Production Economics
1991 - 2025
Continuation of Engineering Costs and Production Economics. Current editor(s): Stefan Minner From Elsevier Bibliographic data for series maintained by Catherine Liu (repec@elsevier.com). Access Statistics for this journal.
Is something missing from the series or not right? See the RePEc data check for the archive and series.
Volume 58, issue 3, 1999
- Optimal two-stage lot sizing and inventory batching policies pp. 221-234

- DaeSoo Kim
- Capital budgeting under uncertainty: An extended goal programming approach pp. 235-251

- Timothy Ch. U. Kalu
- A mathematical programming approach to evaluating alternative machine clusters in cellular manufacturing pp. 253-264

- Victor L. Berardi, Guoqiang Zhang and O. Felix Offodile
- Explaining beer demand: A residual modeling regression approach using statistical process control pp. 265-276

- Murat Koksalan, Nesim Erkip and Herbert Moskowitz
- Cement transportation planning via fuzzy linear programming pp. 277-287

- Li-Hsing Shih
- Application of discrete event simulation to the activity based costing of manufacturing systems pp. 289-301

- T. A. Spedding and G. Q. Sun
- Analysing interaction effects on MRP implementation using ACE pp. 303-318

- Chee-Chuong Sum, Ser-Aik Quek and Hoon-Eng Lim
- A pragmatic view on process capability studies pp. 319-330

- Mats Deleryd
Volume 58, issue 2, 1999
- A hierarchical planning system for energy intensive production environments pp. 115-129

- Linet Ozdamar and Sevket Ilker Birbil
- An analysis of the inventory behavior in a q-theoretic framework pp. 131-146

- Alessandra Guariglia
- The performance of two popular service measures on management effectiveness in inventory control pp. 147-158

- Amy Zhaohui Zeng and Jack C. Hayya
- Cost and performance analysis of a robotic rework cell pp. 159-172

- Necdet Geren and Alan Redford
- Lot-bucket MRP pp. 173-181

- Rommert J. Casimir
- An optimal production run length in deteriorating production processes pp. 183-189

- Chang Hyun Kim and Yushin Hong
- A new line remedial policy for the paced lines with stochastic task times pp. 191-197

- Hadi Gokcen and O. Faruk Baykoc
- Determining safety stocks for production planning in uncertain manufacturing pp. 199-208

- Yi-Feng Hung and Ching-Bin Chang
- JIT production planning approach with fuzzy due date for OKP manufacturing systems pp. 209-215

- Wei Wang, Dingwei Wang and W. H. Ip
Volume 58, issue 1, 1999
- Manufacturing systems with machine vacations, arbitrary topology and finite buffers pp. 1-15

- Ayse Kavusturucu and Surendra M. Gupta
- Statistical dependence in risk analysis for project networks using Monte Carlo methods pp. 17-29

- J. R. van Dorp and M. R. Duffey
- A fuzzy decision model for color reproduction pp. 31-37

- Cecilia Temponi, Farid Derisavi Fard and H. W. Corley
- An EOQ lot sizing model with random supplier capacity pp. 39-47

- Moncer Hariga and Mohamed Haouari
- Comparison of several heuristics using an analytic procedure for replenishment with non-linear increasing demand pp. 49-55

- J. Yang, G. Q. Zhao and G. K. Rand
- Consolidating distribution centers can reduce lost sales pp. 57-61

- Robert Bordley, Mark Beltramo and Dennis Blumenfeld
- Networked manufacturing:: The impact of information sharing pp. 63-79

- Sophie D'Amours, Benoit Montreuil, Pierre Lefrancois and Francois Soumis
- An integrated production-distribution model for a multi-national company operating under varying exchange rates pp. 81-92

- Zubair M. Mohamed
- A lost-sales continuous-review inventory system with emergency ordering pp. 93-112

- Esmail Mohebbi and Morton J. M. Posner
Volume 55, issue 3, 1998
- Applying the lessons learned from 27 lean manufacturers.: The relevance of relationships management pp. 223-240

- Roberto Panizzolo
- Product costing for complex manufacturing systems pp. 241-255

- Arnick N. A. M. Boons
- Optimal continuous review policies for spare part provisioning with random lead times pp. 257-271

- Takeshi Shibuya, Tadashi Dohi and Shunji Osaki
- Minimizing mean flow times criteria on a single batch processing machine with non-identical jobs sizes pp. 273-280

- Fariborz Jolai Ghazvini and Lionel Dupont
- Supply chain design and analysis:: Models and methods pp. 281-294

- Benita M. Beamon
- Advanced manufacturing technology selection:A strategic model for learning and evaluation pp. 295-307

- R. P. Mohanty and S. G. Deshmukh
- The design of quality systems: A contingency approach pp. 309-319

- J. D. van der Bij and H. Broekhuis
- A new pragmatic approach to capital investment appraisal: The financial appraisal profile (FAP) model pp. 321-341

- Frank Lefley and Malcolm Morgan
Volume 55, issue 2, 1998
- A quantitative approach to estimate the size of the time buffer in the theory of constraints pp. 113-119

- Zinovy D. Radovilsky
- The management and organisational context of new product development: Diagnosis and self-assessment pp. 121-131

- R. E. McQuater, A. J. Peters, B. G. Dale, M. Spring, J. H. Rogerson and E. M. Rooney
- The impact of parameters setting in load oriented manufacturing control pp. 133-142

- Marco Perona and Alberto Portioli
- A note on the convexity of the objective function for a simple common component inventory problem pp. 143-148

- Haizhen Fu and Duncan K. H. Fong
- A heuristic for network project scheduling with random activity durations depending on the resource allocation pp. 149-162

- Dimitri Golenko-Ginzburg and Aharon Gonik
- Tardiness minimization on parallel machines pp. 163-168

- Meral Azizoglu and Omer Kirca
- A heuristic to minimize a quadratic function of job lateness on a single machine pp. 169-175

- Ling-Huey Su and Pei-Chann Chang
- Optimal design of a generalized conveyor-serviced production station: Fixed and removal item cases pp. 177-189

- S. A. Feyzbakhsh, M. Matsui and K. Itai
- Imperfect maintenance policies for deteriorating production systems pp. 191-201

- Sheng-Tsaing Tseng, Ruey Huei Yeh and Wen-Tsung Ho
- Simulation modelling and analysis of a JIT production system pp. 203-212

- Omer Faruk Baykoc and Serpil Erol
- One machine scheduling to minimize the maximum earliness with minimum number of tardy jobs pp. 213-219

- Ertan Guner, Serpil Erol and Kazuo Tani
Volume 55, issue 1, 1998
- TQM impact on quality conformance and customer satisfaction: A causal model pp. 1-20

- Cipriano Forza and Roberto Filippini
- An inventory model for deteriorating items with time-proportional demand and shortages under inflation and time discounting pp. 21-30

- Jen-Ming Chen
- Demand promotion by upgradation under stock-dependent demand situation - a model pp. 31-38

- T. K. Datta, K. Paul and A. K. Pal
- Optimal development of production technology when autonomous and induced learning are present pp. 39-52

- Bowon Kim
- An exact algorithm for batching and scheduling two part types in a mixed shop: A technical note pp. 53-56

- T. C. Edwin Cheng and Mikhail Y. Kovalyov
- Decision models for single-period products with two ordering opportunities pp. 57-70

- Amy Hing-Ling Lau and Hon-Shiang Lau
- A study on production lines with discrete batch WIP inventory transfer pp. 71-85

- Erdal Erel
- Stochastic linear optimisation of an MPMP production planning model pp. 87-96

- M. Akif Bakir and Mike D. Byrne
- Post design modeling for cellular manufacturing system with cost uncertainty pp. 97-109

- Ravi Shanker and Prem Vrat
| |