International Journal of Production Economics
1991 - 2025
Continuation of Engineering Costs and Production Economics. Current editor(s): Stefan Minner From Elsevier Bibliographic data for series maintained by Catherine Liu (). Access Statistics for this journal.
Is something missing from the series or not right? See the RePEc data check for the archive and series.
Volume 32, issue 3, 1993
- Analysis of correlated risky cash flow pp. 269-276

- Y. V. Hui, L. C. Leung and J. S. Huang
- Modeling in-house vs. contract maintenance, with fixed costs and learning effects pp. 277-283

- W. J. Kennedy
- Heuristic algorithms for scheduling in the no-wait flowshop pp. 285-290

- Rajesh Gangadharan and Chandrasekharan Rajendran
- A deterministic inventory model for deteriorating items with stock-dependent demand rate pp. 291-299

- S. Pal, A. Goswami and K. S. Chaudhuri
- An efficient dynamic dispatching rule for scheduling in a job shop pp. 301-313

- T. S. Raghu and Chandrasekharan Rajendran
- Unquality-costing sampling plans by variables and their implications on supply relationships pp. 315-326

- Sophie D'Amours, Pierre Lefrancois, Benoit Montreuil and Amar Ramudhin
- Optimal target values for a filling process when inspection is based on a correlated variable pp. 327-334

- Do Sun Bai and Min Koo Lee
- Comparison of depreciation and corporate tax policies between the countries of the North American free trade area (NAFTA) and the European Community (EC) pp. 335-354

- Donald S. Remer and Armando P. Nieto
- A comparison of manufacturing management in JIT and non-JIT firms pp. 355-364

- Maling Ebrahimpour and Barbara E. Withers
- Technological progress and optimal supply price pp. 365-381

- Kofi Kissi Dompere
Volume 32, issue 2, 1993
- Classification and coding of components for implementing a computerized inventory control system for a television assembling industry pp. 133-154

- Divakar Rajamani
- Linear programming optimization of a network for an aluminum plant: A case study pp. 155-168

- Andras Farkas, Tamás Koltai and Andrew Szendrovits
- Comparing performance measures in dynamic job shops: economics vs. time pp. 169-183

- Thomas R. Rohleder and Gary D. Scudder
- A note on "minimizing a quadratic function of job lateness on a single machine" pp. 185-187

- Roberto Tadei
- A neural-network-based approach for estimating the cost of assembly systems pp. 189-207

- Avraham Shtub and Yoav Zimerman
- A fuzzy upgrading of integrated vague managerial and engineering knowledge pp. 209-228

- M. Dohnal, M. Starzak, M. Kerkovsky, J. Dohnalova, J. Vystrcil, R. Koivisto, M. Pokorny, M. Vanis and S. Parsons
- Outage costs caused by various outage depths pp. 229-237

- George J. Y. Hsu, Pao-long Chang and Tser-yieth Chen
- Multiobjective facility layout using simulated annealing pp. 239-254

- G. Suresh and S. Sahu
- An optimal batch size for a production system operating under a just-in-time delivery system pp. 255-260

- A. M. M. Jamal and Bhaba R. Sarker
- An analytic eclectic heuristic for replenishment with linear increasing demand pp. 261-266

- J. Yang and G. K. Rand
Volume 32, issue 1, 1993
- Industrial benchmarking: A case study of performance analysis techniques pp. 1-11

- Michael Schefczyk
- A new method for the analysis of operating costs of construction equipment pp. 13-21

- Emmanuel K. Manatakis and Panagiotis A. Drakatos
- Modelling and analysis of just-in-time manufacturing systems pp. 23-37

- A. Gunasekaran, S. K. Goyal, T. Martikainen and P. Yli-Olli
- Predicting inventory record-keeping errors with discriminant analysis: A field experiment pp. 39-51

- George M. Sheppard and Karen A. Brown
- Dynamic scheduling--a survey of research pp. 53-63

- V. Suresh and Dipak Chaudhuri
- A multidimensional scaling algorithm for group layout in cellular manufacturing pp. 65-76

- M. P. Chandrasekharan and R. Rajagopalan
- Probabilistic time-scheduling model for an exponentially decaying inventory when delays in payments are permissible pp. 77-82

- Nita. H. Shah
- Supply delays and the inventory stocking policy pp. 83-90

- Agnes Sulem and Charles S. Tapiero
- A note on ordering policies with cost of observation and lead times pp. 91-97

- V. Sridharan
- An inventory model for non-deteriorating items pp. 99-101

- V. Sridharan
- Survey of project evaluation techniques currently used in industry pp. 103-115

- Donald S. Remer, Scott B. Stokdyk and Mike Van Driel
- A two-level decision-making model for controlling stochastic projects pp. 117-127

- Dimitri Golenko-Ginzburg
- Computer integrated manufacturing (in four volumes): Edited by R.U. Ayres, Chapmann & Hall, 1993 pp. 129-130

- Krisztina Demeter and Baranabas Mucsi
Volume 30-31, issue 1, 1993
- Strategic and operational issues in production economics pp. 1-2

- Robert W. Grubbstrom and Hans H. Hinterhuber
- Production control in engineer-to-order firms pp. 3-22

- J. W. M. Bertrand and D. R. Muntslag
- The influence of central government's policy on production and the inventory in a spatial oligopoly pp. 23-30

- Marija Bogataj and Ludvik Bogataj
- Capacity smoothing and sequencing for mixed-model lines pp. 31-42

- Maria Decker
- Simulation of pull type manufacturing system for evaluating maintenance planning pp. 43-52

- Semra Durmusoglu
- Integrating marketing and production planning in make-to-order companies pp. 53-66

- Brian Kingsman, Lee Worden, Linda Hendry, Alan Mercer and Elaine Wilson
- Manufacturing flexibility and profitability pp. 67-78

- Jan Olhager
- Feedback production planning in a stochastic two-machine flowshop: Asymptotic analysis and computational results pp. 79-93

- Suresh Sethi, Houmin Yan, Zhang Qing and Xun Yu Zhou
- Manpower capacity planning -- A hierarchical approach pp. 95-106

- Bernhard Wild and Christoph Schneewei
- Production Planning and Control (PPC) systems including load-oriented order release -- Problems and research perspectives pp. 107-122

- G. Zapfel and H. Missbauer
- Process planning for a modular component placement system pp. 123-135

- W. H. M. Zijm and A. van Harten
- Capacitated lot-sizing with minimum batch sizes and setup times pp. 137-152

- Edward J. Anderson and Boon Soon Cheah
- Initial order quantities in a multistage production system with backlogging pp. 153-166

- Robert W. Grubbstrom and Huiping Ding
- Measuring and improving planning stability of reorder-point lot-sizing policies pp. 167-178

- Thomas Jensen
- Optimal and approximate (Q, r) inventory policies with lost sales and gamma-distributed lead time pp. 179-194

- Soren Glud Johansen and Anders Thorstenson
- A theoretical framework for understanding why JIT reduces cost and cycle time and improves quality pp. 195-204

- John Miltenburg
- Different evaluations of `criticity' in production processes pp. 205-212

- Luigi Poiaga
- A capacitated single-item lot-size model pp. 213-219

- Kaj Rosling
- Heterogeneous batch structures in throughput scheduling pp. 221-227

- P. J. Weeda
- Industrial conversion to natural gas--An efficient and risk neutral strategy? pp. 229-242

- Berndt Andersson and Ted Lindblom
- The challenges of capacity planning pp. 243-264

- Nils Arne Bakke and Roland Hellberg
- Engineering design and product development and its relationship to manufacturing: A programme of case study research in British companies pp. 265-272

- P. M. Braiden, N. Alderman and A. T. Thwaites
- Manufacturing practice in a transition economy pp. 273-280

- Attila Chikan and Krisztina Demeter
- Integrated performance measurement: A review of current practice and emerging trends pp. 281-296

- M. J. Gregory
- What makes a strategist out of a manager? What engineers should know about strategic management pp. 297-307

- Hans H. Hinterhuber and Wolfgang Popp
- Design of the decision process for strategic investment in advanced manufacturing systems pp. 309-322

- C. O'Brien and S. J. E. Smith
- Operational technology transfer: Can we calculate the behavior costs? pp. 323-330

- Shanthakumar Palaniswami and Ronald C. Bishop
- The analytic hierarchy process based expert analysis of strategies and critical success factors of forest industries in Finland pp. 331-343

- Markku Tuominen and Pentti Sierila
- Progress on developing a framework for computer aided production management pp. 345-353

- M. C. Bonney and M. A. Head
- Architectural framework for the design of a simulation environment for decentralized production management pp. 355-364

- Chr. Kruse, M. Zell and A. -W. Scheer
- Decentralized production planning and design of a production management system based on an object-oriented architecture pp. 365-383

- M. Rohloff
- Quality of services "applicable to production?" pp. 385-397

- C. P. M. Govers
- Improving service quality: Learning from manufacturing pp. 399-413

- Robert N. Mefford
- Inventory control and quality system requirements--a case study pp. 415-425

- Urpo Moisio and Veli-Matti Virolainen
- Analysis of the conversion from a job shop system to a cellular manufacturing system pp. 427-436

- M. Bulent Durmusoglu
- Using a knowledge-based decision support system development environment to implement a scheduling system for a workshop pp. 437-451

- Michel Klein, Catherine Lecomte and Pierre Dejax
- An expert system for a local planning environment pp. 453-464

- G. J. Meester
- The appraisal of industrial investments: A new method and a case study pp. 465-476

- Paolo Gallo and Lorenzo Peccati
- Post-implementation reviews of investment: Evidence from a two-stage study pp. 477-488

- Eleanor J. Morgan and Yan Ling Tang
- An integrated approach to the layout of flexible transfer lines (FTLs): Buffer stocks allocation pp. 489-499

- Layek Abdel-Malek and Chi Tang
- Determining the number of spares in an inventory/repair system which supports equipment with scheduled usage pp. 501-518

- Michael S. Bridgman and Clark A. Mount-Campbell
- The economic lot size and relevant costs pp. 519-530

- Michael Corbey and Rutger Jansen
- Determining economic inventory policies in a multi-stage just-in-time production system pp. 531-542

- A. Gunasekaran, S. K. Goyal, T. Martikainen and P. Yli-Olli
- Inventory control of repairable tools with incomplete information pp. 543-550

- Thomas Hamann and Jean-Marie Proth
- Reducing system nervousness in multi-product inventory systems pp. 551-562

- Erik van der Sluis
- Global relations between inventory, manufacturing lead time and delivery date promises pp. 563-569

- Gyula Vastag and D. Clay Whybark
- Freight rates for small shipments pp. 571-577

- F. J. Arcelus and J. E. Rowcroft
- Scheduling of packaging lines in the process industry: An empirical investigation pp. 579-589

- Peter van Dam, Gerard Gaalman and Gerard Sierksma
- A practical solution to a newspaper distribution problem pp. 591-599

- R. J. Mantel and M. Fontein
| |