European Journal of Operational Research
1977 - 2025
Current editor(s): Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati From Elsevier Bibliographic data for series maintained by Catherine Liu (). Access Statistics for this journal.
Is something missing from the series or not right? See the RePEc data check for the archive and series.
Volume 100, issue 3, 1997
- The mixed and multi model line balancing problem: a comparison pp. 399-412

- Jannet I. van Zante-de Fokkert and Ton G. de Kok
- Optimal production cycles, procurement schedules, and joint investment in an imperfect production system pp. 413-428

- Jae-Dong Hong
- On the use of the asymptotic forms of the boolean matrix for designing cellular manufacturing systems -- An improved approach pp. 429-440

- G. Jayakrishnan Nair and T. T. Narendran
- A global MILP model for FMS scheduling pp. 441-453

- Jiyin Liu and B. L. MacCarthy
- On a pattern sequencing problem to minimize the maximum number of open stacks pp. 454-463

- Horacio Hideki Yanasse
- Scheduling jobs on parallel machines with sequence-dependent setup times pp. 464-474

- Young Hoon Lee and Michael Pinedo
- Real time task scheduling allowing fuzzy due dates pp. 475-481

- Marin Litoiu and Roberto Tadei
- Robust economic order quantity models pp. 482-493

- Gang Yu
- Solving the discrete lotsizing and scheduling problem with sequence dependent set-up costs and set-up times using the Travelling Salesman Problem with time windows pp. 494-513

- Marc Salomon, Marius M. Solomon, Luk N. Van Wassenhove, Yvan Dumas and Stephane Dauzere-Peres
- A dynamic lot sizing model with exponential machine breakdowns pp. 514-536

- Heinrich Kuhn
- Dynamic lot-sizing with setup cost reduction pp. 537-549

- Meltem Denizel, Selcuk Erenguc and Harold P. Benson
- An optimal (Q,r) policy for a multipart assembly system under stochastic part procurement lead times pp. 550-556

- Okitsugu Fujiwara and Dayani Sedarage
- Simple formulas for the expected costs in the newsboy problem: An educational note pp. 557-561

- Hon-Shiang Lau
- The single-item newsboy problem with dual performance measures and quantity discounts pp. 562-565

- Chen-Sin Lin and Dennis E. Kroll
- On the lexicographic minimax approach to location problems pp. 566-585

- Wlodzimierz Ogryczak
- An adaptation of SH heuristic to the location set covering problem pp. 586-593

- Marcos Alminana and Jesus Pastor
- Generalized p-Center problems: Complexity results and approximation algorithms pp. 594-607

- Dorit S. Hochbaum and Anu Pathria
- A bi-objective uncapacitated facility location problem pp. 608-616

- Young-Soo Myung, Hu-gon Kim and Dong-wan Tcha
- A linear program for the two-hub location problem pp. 617-622

- Jinhyeon Sohn and Sungsoo Park
- The splitting of variables and constraints in the formulation of integer programming models pp. 623-628

- H. P. Williams and S. C. Brailsford
- Scaling units via the canonical correlation analysis in the DEA context pp. 629-637

- Lea Friedman and Zilla Sinuany-Stern
- A response to "A comment on 'Grey integer programming: An application to waste management planning under uncertainty"' by Larry Jenkins pp. 638-641

- G. H. Huang, B. W. Baetz and G. G. Patry
Volume 100, issue 2, 1997
- Models and methods for an integrated design of products and processes pp. 251-252

- Walter Eversheim
- Information management for concurrent engineering pp. 253-265

- Walter Eversheim, Axel Roggatz, Hans-Jurgen Zimmermann and Thomas Derichs
- A flexible concept for decision support: Evaluation and selection of suitable product development activities pp. 266-276

- H. Ahn and H. Dyckhoff
- A methodology for the reduction of imprecision in the engineering process pp. 277-292

- Ronald E. Giachetti, Robert E. Young, Axel Roggatz, Walter Eversheim and Giovanni Perrone
- The implementation of simultaneous engineering in the stage of product concept development: A process orientated improvement of quality function deployment pp. 293-314

- Ralf Schmidt
- Intelligent systems for engineering design and configuration problems pp. 315-326

- K. Muller and H. -J. Sebastian
- Simultaneous engineering approach to an integrated design and process planning pp. 327-337

- W. Eversheim, W. Bochtler, Gra[beta]ler, R. and W. Kolscheid
- Feature based feedback into the early stages of design pp. 338-350

- H. Durr and M. Schramm
- Evaluating alternative production cycles using the extended fuzzy AHP method pp. 351-366

- M. Weck, F. Klocke, H. Schell and E. Ruenauver
- Potentials and procedure for the integrated planning of production technologies in the early phases of product development pp. 367-378

- W. Eversheim, F. Klocke, W. Schmitz, F. Brandenburg and N. Winands
- Concurrent engineering of work and production systems pp. 379-398

- Juergen Stahl, Holger Luczak, Rene Langen, Manfred Weck, Pavlos Klonaris and Tilo Pfeifer
Volume 100, issue 1, 1997
- Prediction of company acquisition in Greece by means of the rough set approach pp. 1-15

- R. Slowinski, C. Zopounidis and A. I. Dimitras
- Evaluating foreign investment environment in China: A systematic approach pp. 16-26

- Shengliang Deng, Yuan Li and Jinxian Chen
- Portfolio optimization with a neural network implementation of the coherent market hypothesis pp. 27-40

- Manfred Steiner and Hans-Georg Wittkemper
- Currency option pricing with mean reversion and uncovered interest parity: A revision of the Garman-Kohlhagen model pp. 41-59

- Niklas Ekvall, L. Peter Jennergren and Bertil Naslund
- The confounding effects of distribution mixtures on some basic methods for handling stable-Paretian distributions pp. 60-71

- Hon-Shiang Lau and Amy Hing Ling Lau
- Using the analytic hierarchy process and multi-objective programming for the selection of cost drivers in activity-based costing pp. 72-80

- Marc J. Schniederjans and Tim Garvin
- Cost models in nonhomogeneous Markov systems pp. 81-96

- A. C. Georgiou and P. -C. G. Vassiliou
- Project network models with discounted cash flows a guided tour through recent developments pp. 97-121

- Willy S. Herroelen, Patrick Van Dommelen and Erik L. Demeulemeester
- Critical path in an activity network with time constraints pp. 122-133

- Yen-Liang Chen, Dan Rinks and Kwei Tang
- A genetic algorithm for multi-mode resource constrained project scheduling problem pp. 134-141

- Masao Mori and Ching Chih Tseng
- Process planning in a fuzzy environment pp. 142-169

- Ming Long Liu and Nikolaos V. Sahinidis
- Finite-capacity scheduling-based planning for revenue-based capacity management pp. 170-179

- Can Akkan
- A tabu search algorithm for the multi-trip vehicle routing and scheduling problem pp. 180-191

- Jose Brandao and Alan Mercer
- Complex dynamics and control of arms race pp. 192-215

- D. A. Behrens, Gustav Feichtinger and Alexia Fürnkranz-Prskawetz
- A simulation approach to reliability analysis of weapon systems pp. 216-224

- J. Yanez, T. Ortuno and B. Vitoriano
- Stochastic modelling of combat with reinforcement pp. 225-235

- N. K. Jaiswal, Y. Sangeeta and S. C. Gaur
- Optimal strategy of route and look for the path constrained search problem with reward criterion pp. 236-249

- Ryusuke Hohzaki and Koji Iida
| |