European Journal of Operational Research
1977 - 2025
Current editor(s): Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati From Elsevier Bibliographic data for series maintained by Catherine Liu (). Access Statistics for this journal.
Is something missing from the series or not right? See the RePEc data check for the archive and series.
Volume 79, issue 3, 1994
- Flexible automation investments: A problem formulation and solution procedure pp. 383-404

- Vahid Lotfi and Nallan C. Suresh
- Extended block replacement policy with used item and general random minimal repair cost pp. 405-416

- Shey-Huei Sheu
- An analysis of shift class design problems pp. 417-430

- Antoon W. J. Kolen and Leo G. Kroon
- Design of a two-stage procedure for three-class screening pp. 431-442

- Chung Tae Kim, Kwei Tang and Michael Peters
- An interactive algorithm for solving multiple objective integer linear programming problems pp. 443-450

- Subhash C. Narula and Vassil Vassilev
- The general multi-retailer EOQ problem with vehicle routing costs pp. 451-473

- Shoshana Anily
- Data-level parallel solution of min-cost network flow problems using [epsilon]-relaxations pp. 474-488

- Xiaoye Li and Stavros Zenios
- Modelling a large, sparse spatial interaction matrix using data relating to a subset of possible flows pp. 489-500

- T. C. Bailey and A. G. Munford
- Lagrangian relaxation based approaches to capacitated hub-and-spoke network design problem pp. 501-523

- Turgut Aykin
- A TSSP + 1 decomposition strategy for the vehicle routing problem pp. 524-536

- Charles E. Noon, John Mittenthal and Rekha Pillai
- Pseudoconvex optimization for a special problem of paint industry pp. 537-548

- Tibor Illes, Janos Mayer and Tamas Terlaky
- The job shop tardiness problem: a corrected model pp. 549-550

- S. Wilhelm
Volume 79, issue 2, 1994
- A comparative study in DSS development pp. 153-157

- Kees M. van Hee and Jan Karel Lenstra
- `PLATE': A decision support system for resource constrained scheduling problems pp. 158-166

- A. T. M. Aerts, A. Jansen, L. Klieb, C. Noorlander and G. Wolf
- A network flow algorithm for just-in-time project scheduling pp. 167-175

- E. V. Levner and A. S. Nemirovsky
- Development of a heuristic project scheduler under resource constraints pp. 176-182

- R. Minciardi, M. Paolucci and P. P. Puliafito
- A decision support system for the resource constrained project scheduling problem pp. 183-195

- E. Nowicki and C. Smutnicki
- MIPS: A DSS for multiobjective interactive project scheduling pp. 196-207

- Tomasz Rys, Rafal Stanek and Wieslaw Ziembla
- A decomposition approach in a DSS for a resource constrained scheduling problem pp. 208-219

- P. Serafini and M. G. Speranza
- DSS for multiobjective project scheduling pp. 220-229

- Roman Slowinski, Boleslaw Soniewicki and Jan Weglarz
- On the usefulness of standard industrial classifications in comparative financial statement analysis pp. 230-238

- Roy Dahlstedt, Timo Salmi, Martti Luoma and Arto Laakkonen
- Resource allocation for a stochastic CPM-type network through perturbation analysis pp. 239-248

- Yat-wah Wan
- Group preference aggregation methods employed in AHP: An evaluation and an intrinsic process for deriving members' weightages pp. 249-265

- R. Ramanathan and L. S. Ganesh
- A robust strategy approach to a strategic mobility problem pp. 266-276

- Gunduz Ulusoy and Reha Uzsoy
- Valued preference structures pp. 277-286

- Janos C. Fodor and Marc Roubens
- A local constraint based analysis approach to project scheduling under general resource constraints pp. 287-298

- Linet Ozdamar and Gunduz Ulusoy
- The Travelling Salesman Problem with pick-up and delivery pp. 299-310

- Gur Mosheiov
- Inspection error effects on economic selection of target value for a production process pp. 311-324

- Shieh-Liang Chen and Kun-Jen Chung
- On the coordination of product and by-product flows in two-level distribution networks: Model formulations and solution procedures pp. 325-339

- Jacqueline Bloemhof-Ruwaard, Marc Salomon and Luk N. Van Wassenhove
- Combinatorial algorithms for some 1-facility median problems in the plane pp. 340-351

- H. W. Hamacher and S. Nickel
- The k-neighbor, r-domination problems on interval graphs pp. 352-368

- Dipti S. Joshi, Sridhar Radhakrishnan and N. Chandrasekharan
- A quadratically convergent global algorithm for the linearly-constrained minimum cross-entropy problem pp. 369-378

- S. C. Fang and H. S. J. Tsao
- Estimation of returns to scale using data envelopment analysis: A comment pp. 379-382

- Rolf Fare and Shawna Grosskopf
Volume 79, issue 1, 1994
- One machine scheduling problem with fuzzy duedates pp. 1-12

- Sangsu Han, Hiroaki Ishii and Susumu Fujii
- Optimal recycling of waste materials in a plastic extrusion production process pp. 13-24

- S. P. Ladany and K. C. So
- A Lagrangean decomposition solution to a single line multiproduct scheduling problem pp. 25-37

- Renato de Matta
- Group scheduling jobs on a single machine: A multi-objective approach with preemptive priority structure pp. 38-50

- S. P. Rana and N. Singh
- Reliability of interconnected scheduled services pp. 51-72

- Malachy Carey
- Operationalizing approximate multiattribute utility functions for use in practice pp. 73-84

- James L. Corner
- A simple algorithm to incorporate transactions costs in quadratic optimisation pp. 85-94

- C. J. Adcock and N. Meade
- A polyhedral approach to the rural postman problem pp. 95-114

- A. Corberan and J. M. Sanchis
- Decision making under partial probability information pp. 115-122

- Celik Parkan
- Optimal and heuristic inventory replenishment models for deteriorating items with exponential time-varying demand pp. 123-137

- Moncer A. Hariga and Lakdere Benkherouf
- A surrogate heuristic for set covering problems pp. 138-150

- Luiz Antonio N. Lorena and Fabio Belo Lopes
Volume 78, issue 3, 1994
- Optimization by pattern search pp. 277-303

- Yosef S. Sherif and Bruce A. Boice
- An interactive technique for the cutting stock problem with multiple objectives pp. 304-317

- Reda M. S. Abd El-Aal
- The design of optimum component test plans in the demonstration of system reliability pp. 318-333

- Ismail Kuban Altinel
- Supplier pricing and lot sizing when demand is price sensitive pp. 334-354

- P. L. Abad
- A dynamic service quality cost model with word-of-mouth advertising pp. 355-366

- N. P. Archer and G. O. Wesolowsky
- A multiple-criteria composite index model for quantitative and qualitative data pp. 367-379

- Wade D. Cook and Moshe Kress
- A fuzzy set theoretic approach to qualitative analysis of causal loops in system dynamics pp. 380-393

- Pankaj, Kiran Seth and Professor Sushil
- Single machine scheduling with start time dependent processing times: Some solvable cases pp. 394-403

- P. S. Sundararaghavan and A. S. Kunnathur
- Necessary and sufficient conditions of unacceptable solutions in NLP discriminant analysis pp. 404-412

- Baichun Xiao
- Topology related index for performance comparison of blocking symmetrical networks pp. 413-425

- Vittoria de Nitto Persone
- Waiting time estimation in a manufacturing system using the number of machine idle periods pp. 426-440

- Jaejin Jang and C. Richard Liu
- Carry on with redundancy in lexicographic goal programming pp. 441-442

- Carlos Romero
Volume 78, issue 2, 1994
- Editorial pp. 145-442

- Luis V. Tavares and Carlo Vercellis
- Adjustment of heads and tails for the job-shop problem pp. 146-161

- J. Carlier and E. Pinson
- Optimal resource leveling using non-serial dyanamic programming pp. 162-177

- M. Bandelloni, M. Tucci and R. Rinaldi
- A multi-project management framework for new product development pp. 178-191

- Adriano De Maio, Roberto Verganti and Mariano Corso
- Strategic decision processes in matrix organizations pp. 192-203

- Robert E. Jones, K. Michelle Jones and Richard F. Deckro
- Capacity analysis in repetitive assemble-to-order manufacturing systems pp. 204-215

- F. Fumero and C. Vercellis
- The three-machine flow-shop problem with arbitrary precedence relations pp. 216-223

- Chong John Lim and Graham B. McMahon
- Maximizing the value of a space mission pp. 224-241

- Nicholas G. Hall and Michael J. Magazine
- Scheduling project activities in a distributed environment pp. 242-251

- Amar Ramudhin, Benoit Montreuil and Pierre Lefrancois
- Real-time piloting of flexible manufacturing systems pp. 252-261

- R. Tawegoum, E. Castelain and J. C. Gentina
- A stochastic model to control project duration and expenditure pp. 262-266

- L. Valadares Tavares
- Constrained multi-project plannings problems: A Lagrangean decomposition approach pp. 267-275

- Carlo Vercellis
Volume 78, issue 1, 1994
- A comparison of graphical techniques for decision analysis pp. 1-21

- Prakash P. Shenoy
- Personnel selection using fuzzy MCDM algorithm pp. 22-33

- Gin-Shuh Liang and Mao-Jiun J. Wang
- Canonical fuzzy bags and bag fuzzy measures as a basis for MADM with mixed non cardinal data pp. 34-48

- Abdelwaheb Rebai
- Single-shift off-day scheduling of a hierarchical workforce with variable demands pp. 49-57

- Rudy Hung
- A column generation approach to job grouping for flexible manufacturing systems pp. 58-80

- Yves Crama and Alwin Oerlemans
- Dynamic programming formulation of the group interview problem with a general utility function pp. 81-92

- Young H. Chun, Herbert Moskowitz and Robert D. Plante
- The most critical path in a PERT network: A heuristic approach pp. 93-105

- H. M. Soroush
- Minimization of a quadratic pseudo-Boolean function pp. 106-115

- A. Billionnet and A. Sutter
- A Lagrangean heuristic for the capacitated concave minimum cost network flow problem pp. 116-129

- Torbjorn Larsson, Athanasios Migdalas and Mikael Ronnqvist
- A bounding scheme for deriving the minimal cycle time of a single-transporter N-stage process with time-window constraints pp. 130-140

- Ronald Armstrong, Lei Lei and Shanhong Gu
| |